LMTF_Environmental_Chamber_Facility_Interfaces.docx
DOCX document 4 MB Posted
- Attached to
- Guided Missiles Federal contract opportunity
- Solicitation number
- FA8204-15-R-50041
About this file
Photos and diagrams of the facilities where the chamber is to be installed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TemperatureHumidityChamberupgradeSOWandTRDNoThermalShock-2.docx | DOCX document | |
| CDRLs.pdf | ||
| SectionJsitevisitinstructions.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LMTF TEMPERATURE/HUMIDITY AND TEMPERATURE/ALTITUDE CHAMBER INSTALLATION DETAILS July 16, 2015
LMTF TEMPERATURE/HUMIDITY AND TEMPERATURE/ALTITUDE CHAMBER INSTALLATION DETAILS
This document details the area where both the Temperature/Humidity and the Temperature/Altitude chambers are to be installed. These are separate procurements; each vendor shall be responsible for the facility interfaces for the system they provide.
Nort h
CHAMBER LOCATIONS - BUILDING 501
All dimensions are in inches Locations and sizes are notional. Locations can extend beyond the mezzanine (green area) and one chamber could be located under the narrow portion of the mezzanine height permitting. Location of each chamber shall be coordinated with LMTF.
Chamber placement shall allow forklift access to the south end of the mezzanine, to the double doors on the West side of the high bay, and to both chamber doors.
Installation of drains for condensate lines will be required for the installation(s). There are no drain lines in or near the area where the chambers will be located. The existing altitude chamber vents condensate through a white PVC line which is routed up under the mezzanine and out the North wall. Due to the anticipated increase in condensate from the new systems LMTF recommends the condensate line(s) be routed inside along the North wall above the personnel door and discharge into the existing roof drain in the Northeast corner of the building.
Existing roof drain
Chamber Location Pictures:
Existing water and air lines Existing condensate line Existing altitude chamber Facing North Power panel for 480 3ph
VAC
North wall Facing West This area is pretty cluttered but everything will be removed for the installation of the chambers.
North West View Power panel for 480 3ph
VAC
Power Panel for 480 VAC 3phase power – on mezzanine
220 VAC 3Ph 225 Amp 4 wire power panel - on North wall behind existing altitude chamber
Chiller for chilled water – outside by North wall Specs for chiller
Location where chilled water lines come into building image2.jpeg image3.png image4.jpeg image5.jpeg image6.emf image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg