This document package contains a Contract Data Requirements List (CDRL) and description of a related federal contract opportunity. The CDRL outlines reporting requirements for a noncompetitive follow-on contract awarded to Engineering and Software System Solutions, Inc. for F-15 WBSI PTP engineering services. Key deliverables include monthly progress reports, conference minutes, an integrated master schedule, a contract work breakdown structure, scientific and technical reports, and an economic analysis. Reports are to be submitted electronically to the Air Force Materiel Command and will follow standard templates with modifications as indicated. The single award, indefinite delivery/indefinite quantity contract supports the Department of the Air Force and has a period of performance through an unspecified end date.
CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8203-20-Q-0001.pdf | ||
| F-15_WBSI_PTP_SOO-5Nov2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DAT A REQUIREMENTS LIST Form Approved
(1 Data Item) 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704·0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it docs not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP TM OTHER X--- --
D. SYSTEM/ITEM
I
E. CONTRACT/PR NO. F.CONTRACTOR
F-15 WBSI PTP Program FD20202000012 ES3
2. TITLE OF DATA ITEM 3. SUBTITLE 1. DATA ITEM NO.
AOOI Progress Report (Studies)
4. AUTHORITY (Dara Acquisition Document No.}
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-ADMN-81313 Statement of Objectives 417 SCMSIGUEA
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED Monthly Block 16 b. COPIES
B. APP CODE 11.AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
D SUBMISSION
NIA NIA Monthly
16. REMARKS 00-ALC/
Block 4: 417 SCMS/GUEA Changes to Dl-ADMN-81313, as follows: 6040 Gum Lane
Bldg 1216 Use/relationship: Hill Al'B. UT 84056 Delete "described by MlL-STD-847."
Monthly Progress Change "supersede Dl-ADMN-81313" to "supersedes Dl-ADMN-81313." Powcrpoint Copy
Requirements:
2. Format: Delete and replace with "417 SMCS/GUEA Program Management Review (PMR) format shall be utilized."
3. Content:
3.2 At the end of the existing text, Insert "Contractor's determination of'Ovcrall Project Assessment' will be submitted with the draft PMR slide(s). but final acceptance of this rating remains with 417 SCMS/GUEA."
Blocks IO through 13:
The contractor shall submit report the first full month afier contract award.
Contractor must satisfy Government concerns/comments with no more than l revision (i.e.
I st draft. Final revision accepted by Government). PMR deliverables requiring more than I revision may affect the Contractor's CPARS Quality rating.
Block 14:
Deliver digital copies via electronic submission to OO-ALC/417 SCMS/GUEA.
15. TOTAL
G. PREPAREDB
H. DATE
Michael Schow#
I D/J!dDt1
I. APPROVED BY
/ Ru111v/�/
Draft Reg Repro
I I
I I
J. DATE
/a z.kP/C/
DD FORM 1423-1, FEB 2001 PREVIOUS EDJTl()f;)' MAY BE USED/' V
Page __ of__ Pages Adobe Professional 7 .0
I
I
I
I
I
I 17. PRICE GROUP
I
I
18. ESTIMATED
TOTAL PRICE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONTRACT DATA REQUIREMENTS LIST Form Approved I (1 Data Item) 0MB No. 0704-0188 t-T -he-pu- b- li _c_r_ep_o_rt-i n-g-bu-, -de- n-fo -, -,h-i -s -c -o l l e-c -tio_ n_o f _ i
_n -fo-,m-at-i o_ n _ i _s _e-st-i m- a-,-.d-,o-av- e-,a-g_e_1_1 _0_ h_ o_u _ r s -p e-,-, -es_ p _o _n -se-.-i n-c-l u- d -i n..lg-,- h -e -t"-,m - e_ f _o _r -,.-v -i e-w-i n-g-i n -st-,u-c-t -i o -n -s.- s- e-a,-c- h -in _g _e_x-i s -tin-g� I data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E .
. A. CONTRACT LINE ITEM NO.
D. SYSTEM/ITEM
F-15 WBSI PTP Program
2. TITLE OF DATA ITEM
B. EXHIBIT
A
C. CATEGORY:
TOP TM I E. CONTRACT/PR NO.
FD20202000012
1. DATA ITEM NO.
A003 Conference/Meeting Minutes
4. AUTHORITY (Dara Acquisition Document No.)
OTHER X
F. CONTRACTOR
ES3
3. SUBTITLE
6. REQUIRING OFFICE
D1-ADMN-8 I 250B 1
5. CONTRACT REFERENCE
Statement of Objectives 417 SCMSIGUEA
7. DD 250 REQ 9. DIST STATEMENT
LT
REQUIRED
8. APP CODE
D
NIA
16. REMARKS
10. FREQUENCY
As Req'd
11. AS OF DATE
NIA
12. DATE OF FIRST SUBMISSION
Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
Block 16
Final acceptance of all Conference Minutes remains with 417 SCMS/GUEA.
14. DISTRIBUTION
a. ADDRESSEE Draft
417 SCMS/GUEA
b. COPIES
Final
Reg Rep ro
Contractor must satisfy Government concerns/comments with no more than 2 revisions (i.e.
f----------1---l---l----i I st draft. 2nd draft, Final revision accepted by Government). as outlined in PWS Service
Summary. Table 2. Meeting Minutes deliverables requiring more than 2 revisions may affect the Contractor's CPARS Quality rating.
Blks 12 & 13: The contractor shall submit within IO calendar days following the event.
Blk 14: See PWS for details pertaining to the electronic submittal of data.
Format:
Minutes may be in Contractor's Format. but all drafts and the final. Government accepted deliverable will be provided in fully-modifiable Word format. including all text, tables.
charts. and calculations. All draft revisions will be supplied in Word format with tracked-changes from all previous revisions until accepted by the Government.
G. PREPARED ��.4 /,
I) I \
Michael Scho
DD FORM 1423-1, FEB 2001
15. TOTAL
H. DATE I. APPROVED BY
,4 Ro_ 1v1v,3��£
/t(;)../;)f),q � --yy h / / 'PREVIOUS EDITION MAY BE USED_/� Page
I l 0
J.DATE
10/z../z-01c;
of Pages
Adobe Professional 7 .0
I I
I I
I
I
I
I I I
I I I
I
I I
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DAT A REQUIREMENTS LIST Form Approved I (1 Data Item) 0MB No. 0704-0188 1---------------'------�1The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense. Executive Services Directorate
I(0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
I A. CONTRACT LINE ITEM NO.
D. SYSTEM/ITEM
B. EXHIBIT
A
C. CATEGORY:
TOP TM __ OTHER X
I
E. CONTRACT/PR NO. F. CONTRACTOR I
FD20202000012 ES3
2. TITLE OF DATA ITEM 3. SUBTITLE I 1. DATA ITEM NO.
A004
17. PRICE GROUP
Contract Work Break-down Structure (C-WBS)
I ---'------.----�----r------ --
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
I
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-8 l 334B Statement of Objectives 417 SCMSIGUEA -�----.----'---.---------
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREOUENCY 12. DATE OF FIRST SUBMISSION 1-
14_. _____ 0_1_sT_R_1_Bu
T_1_o_N ______
-1 IAs Req'd Block 16 b. coP1Es
18. ESTIMATED
TOTAL PRICE
L T 1------------+-cc=--=--c=======----i .. _____ _.
11. AS OF DATE 13· DATE OF SUBSEQUENT a. ADDRESSEE ,___F_in
•-1 -� I
8. APP CODE
NIA
16. REMARKS
Block 4:
D SUBMISSION Draft � NI A Block 16 Reg Rcpro
1- 0_0_-_A_L_c_, ____
__ 1 +--
-1 I 417 SCMS/GUEA
Revision B of DI-MGMT-81334 is the most appropriate for Landing Gear Engineering
Services acquisitions.
1--
60_4_0_G_u_n_1 _L_a,_,e ___ +---+------,1----1 IBldg 1216
Block 12:
H_ill_A_FB_._u_·_r_8_40_5_6 ___ _, __ _,__--< I The contractor shall submit a C-WBS with the technical proposal. ,__o_L_:_H_1r_z_A_A_B_--+-_____,__ .... I Block 13: IThe contractor shall update the Task Order specific C-WBS, as necessary or if requested by 1------+--+-
(As Req'd) I the USAF Program Manager within 10 work days. throughout execution of the contract.
1----------+---+---+-----1
I Block 14:
Deliver digital copies via electronic submission to 00-ALC/417 SCMS/GUEA.
Delivery of modified C-WBS to the OL:H/PZAAB Contracting Officer required for any changes to the Work Breakdown Structure that will affect contract performance. schedule.
or deliverables. OL:H/PZAAB is the sole entity that can approve changes to the contract.
1-------+---+---+--____.I 1---- - -+---t-� I 1---- - -.+---+-� I I-------+--+---+-____. I 0----+---+------+----11 l------+----1-1--1 l------+----1-1--1 l------+----1-1--1 l------+----1-1--1
1----------____.I I---- - -+--+-� I I---- - -+--+-� I I-------+---+---+-____. I 1-------+----+----+-____.I
" 15. TOTAL O 2 0
I G. PREPARED�:/?/
• jl I ) / H. DATE I. APPROVED BY
J. DATE
L
M
-ic-ha_e_l S -c-h o ...:��V()J::/l--::::J���=--_JlJ/i�6/�1�/,1a�o)_j_1jq:..J....:�s;;
:2·��' :�-i·:;?·���1e�\!A n, ::=-:;-27--:.. __ _rv����A'.1����v!:V�'7:...J I
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE US!:D/ V Page__ of__ Pages Adobe Professional 7 .0
F-15 WBSI PTP Program
CONTRACT DATA REQUIREMENTS LIST Form Approved
(7 Data Item) 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments re9.ardin9 this bur�en estimate or any otl1cr aspect of this collection of information, inc!uding suggestions for reducing the burden, to the Department of Defense, Executive Services D1rcctorate (0704·0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. B. EXHIBI T C. CATEGORY: CONTRACT
LINE ITEM NO.
A TDP TM OTHER X
D.SYSTEM/ITEM l E. CONTRACT/PR NO. F.CONTRACTOR F-15 WBSI PTP Program FD20202000012 ES3
1. DATA ITEM NO. 2. TITLE OF DA TA ITEM 3. SUBTITLE
AOl3 Integrated Master Schedule (IMS)
4. AUTHORITY (Data Acquisition Document No.J
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-MISC-81183A Statement of Objectives 417 SCMS/GUEA
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED Block 16 Block 16 LT b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final D SUBMISSION Draft N/A N/A Block 16 Reg Repro
16. REMARKS 00-ALC/
Block 4: 417 SCMS/GUEA DI-MISC-8 I I 83A shall be used in conjunction with the following tailoring: 6040 Gum Lane
Bldg 1216
3. Description/Purpose: Modify to read as follows: Hill AFB, UT 84056 "The CMS is an Integrated Schedule based on task interdependencies. The Statement of Work and WBS are the foundation for the CMS & provide a hierarchy for schedule IMS Tasks traceability. Key milestones are included in the CMS to monitor progress. This Task Order Proposal I information will be used to verify attainability of program objectives. evaluate the progress Updated IMS (As Req'd I of the contractor toward meeting program objectives, and to integrate the program schedule among all related components."
I 0. Preparation Instructions:
Para I 0.1: Modify to read as follows:
"The CMS shall initially be submitted as a Gantt chart in the contractor's format and provided electronically in .pdf file format. Updates shall be provided in the format requested by the Government task order program manager."
Para I 0.2: Modify to read as follows:
"The CMS shall contain all of the key milestones and tasks from contract award to the completion of the program. The schedule shall be traceable to the WBS. Statement of Work (SOW). and the cost/schedule reporting instrument used to report variances. The CMS shall also include a periodic analysis of progress to date. Description of the key elements are as follows:"
Para I 0.2.1: Delete and replace with:
"Program Milestones: Key events and milestones defined by the contracting agency or weapoµ system contractor which depicts program progress and completion."
Para I 0.2.2: Delete.
Para I 0.2.3: Modify to read as follows:
"A graphical display of key program milestones and activities, traceable to the WBS element as necessary to display the work effort at the intermediate level of summarization, e.g. level 3-5 of the WBS as appropriately tailored."
Para I 0.2.4: Delete.
15. TOTAL 0
2 0
G. PREPAREDB
H.DATE I. APPROVED BY J. DATE
Michael SchO\v. ,., /D/J.IJ-010
Rq::"--"5� / ;�/et7/7 , ;h ;:?'-
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONMA'v BE USE V Page I of 3 Pages
Adobe Professional 7 .0
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
( 1 Data Item)
A. CONTRACT LINE ITEM NO.
l B. EXHIBIT I
c. CATEGORY:
X
A TOP __ TM __ OTHER -------------------
D.SYSTEM/ITEM
F-15 WBSI PTP Program
16. REMARKS /Continued/
Para 10.2.5: Modify to read as follows:
I
E. CONTRACT/PR NO.
l F. CONTRACTOR
FD20202000012 ES3
"For each program activity. baseline. estimated. and actual dates shall be reported to identify progress to date and variances to the baseline plan. The analysis shall include causes for the variance. potential impacts. and corrective action required lo avoid schedule delays. The threshold for reporting variances and impact assessments will include schedule slips greater than two weeks."
Para 10.2.6: Delete.
Para 10.3: Delete.
Para 10.5: Modify to read as follows:
"Risk mitigation plans will be built into the schedule as appropriate."
Para 10.5.1: Delete.
Blocks IO through 13:
Initial IMS to be submilled with the technical propos;I. Subsequent updates to be submilled as required (for example. if program events have driven schedule changes).
Block 14:
Deliver digital copies via electronic submission to 00-ALC/417 SCMS/GUEA.
DD FORM 1423-1, FEB 2001 Page __ 2_ of __ 3_Pages
CONTRACT DATA REQUIREMENTS LIST Form Approved
( 1 Data Item/ 0MB No. 0704-0188
The public reporting burden tor this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, inctuding suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-01881. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TOP TM OTHER X --- --
D.
SYSTEM/ITEM
I
E. CONTRACT/PR NO. F. CONTRACTOR
F15 WBSI PTP Program FD20202000012 ES3
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
AOl4 Scientific and Technical Reports
4. AUTHORITY /Data Acquisition Document No./
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
Dl-MISC-8071 IA Statement of Objectives 417 SCMS/GUEA
7. DO 250 REQ 9. DIST STATEMENT 1 O. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED As Req'd Block I6 b. COPIES
8. APP CODE 11.AS OF OATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
NIA
D SUBMISSION Draft
NIA Block 16 Reg Repro
16. REMARKS 00-ALC/
Block 4: 417 SCMS/GUEA
Scientific and Technical Report encompasses requirements for program reports involved 6040 Gum Lane with analytical studies, research. development. testing other than qualification of redesigned Hill AFB, UT components. operational evaluations or investigations. and/or for other engineering 84056-5285 investigations and evaluations. Changes to DI-MISC-80711, as follows:
Test Reports A pp! icat ion/Interrelationship: Word Format I I
7.4 Scientific and Technical Reports for this contract will be managed through 417 PDF Fonnat I
SCMS/GUEA unless otherwise specified in the contract.
Preparation Instructions
I 0.1 Format: Scientific and Technical Reports may be in Contractor's Format. but all drafts and the Final Report for each requirement will be delivered in fully-modifiable Word format. including all text. tables, charts. and calculations. All draft revisions will be supplied in Word format with tracked-changes from all previous draft revisions until Final acceptance by the Government. Final Test Inspection Reports will also be delivered in PDF format. PDF of the Final Report will be the only copy with digital signatures.
Blocks IO through 13:
Scientific and Technical Report(s) shall be submitted in accordance with the Integrated
Master Schedule (IMS). Report corrections to be delivered NL T 15 calendar days after receipt of Government comments.
Government comments will be provided NL T 30 calendar days after initial submittal. and
15 calendar days following revision updates.
Contractor must satisfy Government concerns/comments with no more than 2 revisions (i.e.
I st draft. 2nd draft, Final revision accepted by Government), as outlined in PWS Service
Summary. Table 2. Scientific and Technical Report deliverables requiring more than 2 revisions may affect the Contractor's CPARS Quality rating.
Block 14:
Deliver digital copies via electronic submission to 00-ALC/417 SCMS/GUEA.
(Cont'd on next page)
15. TOTAL I 2 0
G. PREPARED BY (�u H.DATE I. APPROVED BY J. DATE Michael Schou ._,,,, Ron ', --•---.mery / /t?/z/a11r IC/) I J.OL 1 ���_} -/ DD FORM 1423-1, FEB 2001 PREVIOUS EDITIO� MAY BE usr..---y Page I of 3 Pages
Adobe Profess,onal 7.0
17. PRICE GROUP
A. CONTRACT LINE ITEM NO.
D.SVSTEM/ITEM
F15 WBSI PTP Program
16. REMARKS (Continued)
Block 14 (Cont'd):
Documentation Requirements:
CONTRACT DATA REQUIREMENTS LIST
( 1 Data Item)
I B. EXHIBIT 1C. CATEGORY:
A TOP __ TM __ OTHER _X __________________ _
I
E. CONTRACT/PR NO.
I
F. CONTRACTOR
FD20202000012 ES3
Any and all electronic methods and data used to develop each Scientific and Technical Report will be delivered. with full functionality. upon demand to the Government with unlimited rights. This includes, but is not limited to, all algorithms, spreadsheets (delivered in Excel format). calculations.
codes. scripts. tables, documents, raw data, working papers, etc ... All assumptions. justifications. methodologies. and sources used will also be provided, upon demand, with unlimited rights lo the Government.
DD FORM 1423-1, FEB 2001 Page __ of __ 3_Pages
CONTRACT DAT A REQUIREMENTS LIST
(1 Data Item)
Form Approved
0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
D. SYSTEM/ITEM
1.
B. EXHIBIT
A
C. CATEGORY:
TDP TM
I E. CONTRACT/PR NO.
FD20202000012F-15 WBSI PTP Program
DATA ITEM NO. 2. TITLE OF DATA ITEM
AOl9 Economic Analysis (EA)
4. AUTHORITY (Data Acquisition Document No.)
DTHER X
F. CONTRACTOR
ES3
3. SUBTITLE
6. REQUIRING OFFICE
Dl-FNCL-80448 1
5. CONTRACT REFERENCE
Statement of Objectives 417 SCMSIGUEA
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
8. APP CODE
NIA
16. REMARKS
Block 4:
REQUIRED
D
Block 16
11. AS OF DATE
NIA
Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
Block 16
Economic Analysis (EA) to be prepared in accordance with AF165-501 and AFMAN65-506. Changes to DI-FNCL-80448, as follows:
3. Description/Purpose
3.1 Delete and replace with: "Provides the Government with Life Cycle Cost (LCC) and Independent Schedule Assessment (ISA) documentation for competing alternatives of
a. ADDRESSEE
00-ALC/
417 SCMS/GUEA
6040 Gum Lane Hill AFB, UT 84056-5285
EA Tasks:
Word Format
Landing Gear redesign programs. hereafier "Economic Analysis (EA)." The report is used PDF Format
Draft
b. COPIES
Final
Reg Repro to evaluate independent cost estimates generated for all life-cycle acquisition phases of t----------+---+---1----1 redesigned components. subsystems. and/or systems for life-cycle cost and implementation planning. The report also provides EA risk assessment for projected return on investment t----------+---+---1----1 with sensitivity analyses."
7. Application/Interrelationship:
7.2 Delete and replace with: "Allows an Independent Cost Analysis (ICA) to be performed by 448 SCMW Funds Management to determine economic viability of implementation methods. life-cycle cost avoidances. funds planning, system requirements review board planning. and optimization for best value to the U.S. Air Force."
I 0. Preparation Instructions I 0.1 Reference Documents. At the end of the existing test. Insert "Any and all electronic methods used to develop the EA will be delivered. with full functionality, upon demand to the Government with unlimited rights. This includes. but is not limited to, all algorithms.
spreadsheets (delivered in Excel format). calculations. codes, scripts. tables. documents, working papers. etc ... All assumptions, justifications. methodologies. and sources used will also be provided. upon demand. with unlimited rights to the Government. Any and all documcmation outlined above may be required as EA attachments to provide suflicient documentation for EA Certification (Ref. AFl65-501, Para 1.6).
All reference documentation should be provided such that the EA is a standalone package of electronic documents and supporting data, calculations, and information that can be independently replicated. verified. and/or certified by an independent authority that is not familiar with the project.
I 0.2 Delete and replace with: "The LCC Economic Analysis shall include sections outlined in AFl65-50 I and AFMAN65-506. tailored for Landing Gear Systems redesign programs.
The following paragraphs give a cursory outline of some key requirements:"
H. DATE I. APPROVED BY
15.TOTAL
G. PREPARED B: .,,, /. j I ) I Michael Scho
Ron Montgomery ./ ID/wdl>I°! �/��-.,,---�/
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE u¥15.--y
2 0
Page�(� of_]__ Pages Adobe Profess,onal 8.0
I
I
I
I
I 17. PRICE GROUP
I
I
1 B. ESTIMATED
TOTAL PRICE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONTRACT DAT A REQUIREMENTS LIST
( 1 Data Item)
A. CONTRACT LINE ITEM NO.
I
B. EXHIBIT
I
C. CATEGORY:
X
A TOP __ TM __ OTHER -------------- ------
D.SYSTEM/ITEM
F-15 WBSI PTP Program
16. REMARKS (Continued/
I
E. CONTRACT/PR NO.
I
F. CONTRACTOR
FD20202000012 ES3
I 0.2.4 Groundrules and Assumptions. Delete and replace with: "This section shall describe key assumptions. boundary conditions. and relationships and interdependencies necessary to demonstrate the methodology. logic. and process used to determine economic viability and recommendations contained in the EA. Key assumptions include fundamental data such as quantities. neet life-cycle data. operational data and usage rates. and liscal growth restraints. but are not limited to these basic boundary conditions. Key assumptions also encompass the process and decision points by which all data is manipulated, filtered. and prioritized to develop the underlying direction of the EA. This is different than "Methodology." outlined in Para
10.2.6, which is the actual calculations. processes. and validation of the EA framework itself."
Insert" I 0.2.8.3 Provide a sensitivity analysis that demonstrates how uncertainty in key boundary conditions and basic assumptions impact the return on investment, savings-to-investment ratio. and payback period of the EA. The sensitivity analysis provides confidence that the end result wil I remain valid despite volatility or variability in the underlying assumptions upon which the EA was based.
I 0.2.10 Cost Track. Insert "If applicable." prior to "this section shall be used."
I 0.3 Breakout of LCC. Delete and replace with "An example of a breakout of LCC is provided in Figure I. However. this breakout would require substantial tailoring to represent the business model of the U.S. Air Force supply chain management process for Landing Gear sustainment.
I 0.5 Format: Delete and replace with: "EA may be in Contractor's Format. but all drafts and the Final EA will be delivered in fully-modifiable Word format (and Excel format. for supporting documentation). including all text. tables. charts. and calculations. All draft revisions will be supplied in
Word format with tracked-changes from all previous draft revisions until accepted by the Government. Approved Final EA will also be delivered in PDF format. PDF of the Final EA will be the only copy with digital signatures."
Blocks IO through 13:
EA shall be submitted in accordance with the Integrated Master Schedule (IMS). EA corrections to be delivered NLT 15 calendar days after receipt of Government comments.
Government comments will be provided NL T 30 calendar days a�er the initial submittal. and 15 calendar days following any revision updates.
Contractor must satisfy Government concerns/comments with no more than 2 revisions (i.e. I st drafi. 2nd drafi. Final revision accepted by
Government). as outlined in PWS Service Summary, Table 3. EA deliverables requiring more than 2 revisions may affect the Contractor's CPA RS Quality rating.
Block 14:
Deliver digital copies via electronic submission to 00-ALC/417 SCMS/GUEA.
DD FORM 1423-1, FEB 2001 Page __ 2_ of___]__ Pages