FA820214R1004.pdf

PDF 209 KB Posted

Attached to
Weapon System Support & Analysis (WSS&A) Federal contract opportunity
Solicitation number
FA8202-14-R-1004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Solicitation/ Form 1447 - To be completed by all offerors.

View the file

Other files for this federal contract opportunity

Other files attached to Weapon System Support & Analysis (WSS&A), newest first.
File Type Posted
SectionMWSSA.pdf PDF
AppendixSSafety.pdf PDF
WSSA_PWS_7_April_14.pdf PDF
PricingAttachment.xlsx XLSX spreadsheet
SectionLWSSA.pdf PDF
combinedcdrls.pdf PDF
Military_Data_DD2345Form-CompleteLLC.pdf PDF
WSSA_PWS_Draft_5_year.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8202-14-R-1004

X

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE: 541330

8(A) SIZE STANDARD: $35.50

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

This is an ID/IQ type contract with a 5-year basic ordering period and the option to extend the ordering period an additional 6-months IAW 52.217-8.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8202

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Estimated

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:A

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

$ 31,400,000.00

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 3

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES Exception: Military and Aerospace Equipment and Military Weapons

9.

Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein.

All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*

12-MAY-2014 4:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFLCMC WWAK

6072 FIR AVENUE BLDG 1233

HILL AIR FORCE BASE UT 84056-5820

BUYER: Jennifer F. Hutchison/AFLCMC jennifer.hutchison@hill.af.mil Phone: (801) 777- 4207 Fax: (801) 777-6172 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JS

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA820214R1004

DUE: 12 MAY 2014 4:00 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Jennifer F Hutchison/AFLCMC

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFLCMC WWAK

6072 FIR AVENUE BLDG 1233

HILL AIR FORCE BASE UT 84056-5820

Request for Proposal FA8202-14-R-1004

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

De-Confliction Matrix Analysis

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO See Pricing

Attachment To be Determined

R425 De-Confliction Matrix Analysis Contractor to perform De-confliction Matrix Analysis shall be performed IAW PWS Section 3.1.1 (a-p).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Avionics System Architecture Integration, Updates and Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 Avionics System Architecture Integration, Updates and Support Contractor to perform Avionics System Architecture Integration, Updates and Support IAW PWS Section 3.1.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Avionics System Architecture Integration, Updates and Support

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Genesys Architecture Database Tool Analysis

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Genesys Architecture Database Tool Analysis Contractor to perform Genesys Architecture Database Tool Analysis IAW PWS Section 3.1.2.1 (a,b).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Alternate Database Tool Determination

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Alternate Database Tool Determination Contractor to perform Alternate Database Tool Determination IAW PWS Section 3.1.2.2 (a,b) Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Alternate Database Tool Determination

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Architecture Updates, Integration, and Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Architecture Updates, Integration, and Support Contractor to perform Architecture Updates, Integration, and Support IAW PWS Section 3.1.2.3 (a-g, i-k).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Emerging Technoloy Analysis

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price

Emerging Technoloy Analysis

1 LO See Pricing Attachment

To be Determined

R425 FJ

Emerging Technoloy Analysis Contractor to perform Emerging Technoloy Analysis IAW PWS Section 3.1.2.3 (h).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Requirements Managment Software Licensing and Installation

Item No.

R425 FJ

Requirements managment Software Licensing and Installation Contractor to perform Requirements managment Software Licensing and Installation IAW PWS Section 3.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

DOORS

Item No.

0007AA

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Support- Professional: Engineering/Technical Contractor to perform DOORS Licensing and Installation IAW PWS Section 3.2. (a,d).

DOORS

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

CORE

Item No.

0007AB

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

CORE

Contractor to perform CORE IAW PWS Section 3.2 (b,d).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Genysis/Equivalent

Item No.

0007AC

Genysis/Equivalent

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Genysis/Equivalent Contractor to perform Genysis/Equivilant IAW PWS Section 3.2 (c,d).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Engineering Baseline Maintenance

Item No.

Firm Fixed Price

R425 FJ

Engineering Baseline Maintenance Contractor to perform Engineering Baseline Maintenance IAW PWS Section 3.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Architecture Validation

Item No.

0008AA

Firm Fixed Price Quantity U/I Unit Price Total Price

LO See Pricing Attachment

To be Determined

R425 FJ

Architecture Validation

Architecture Validation Contractor to perform Architecture Validation IAW PWS Section 3.3.1 (a,b).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Architecture Validation

Item No.

0008AB

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Architecture Validation Contractor to perform Architecture Validation IAW PWS Section 3.3.1 (a,b).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Requirements Management

Item No.

0008AC

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Support- Professional: Engineering/Technical Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - SEP

Item No.

0008AD

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Support- Professional: Engineering/Technical Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of

Baseline Document Updates - SEP

A POP 1 LO

Baseline Document Updates - SEPTR

Item No.

0008AE

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - SEPTR Contractor to perform Baseline Document Updates - SEPTR IAW PWS Section 3.3.2 (e).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - Engineering Handboo

Item No.

0008AF

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - Engineering Handbook Contractor to perform Baseline Document Updates - Engineering Handbook IAW PWS Section 3.3.2 (f).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Baseline Document Updates - Engineering Handboo

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - Top Level SDM

Item No.

0008AG

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - Top Level SDM Contractor to perform Baseline Document Updates - Top Level SDM IAW PWS Section 3.3.2 (g).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - ICMP

Item No.

0008AH

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - ICMP Contractor to perform Baseline Document Updates - ICMP IAW PWS Section 3.3.2 (h).

Baseline Document Updates - ICMP

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - AMP

Item No.

0008AJ

Firm Fixed Price Quantity U/I Unit Price Total Price

LO See Pricing Attachment

To be Determined

R425 FJ

Baseline Document Updates - AMP Contractor to perform Baseline Document Updates - AMP IAW PWS Section 3.3.2 (i).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - RMP

Item No.

0008AK

Baseline Document Updates - RMP

1 LO See Pricing Attachment

To be Determined

R425 FJ

Baseline Document Updates - RMP Contractor to perform Baseline Document Updates - RMP IAW PWS Section 3.3.2 (j).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - RMS&S

Item No.

0008AL

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - RMS&S Contractor to perform Baseline Document Updates - RMPS&S IAW PWS Section 3.3.2 (k).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of

Baseline Document Updates - APOP

Item No.

0008AM

Firm Fixed Price Quantity U/I See Exhibit A To Be Determined

1 LO

R425 FJ

Baseline Document Updates - APOP Contractor to perform Baseline Document Updates - APOP IAW PWS Section 3.3.2 (l).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Delivery

1 LO

Proposed Delivery

1 LO

Baseline Document Updates - LCSP

Item No.

0008AN

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - LCSP Contractor to perform Baseline Document Updates - LCSP IAW PWS Section 3.3.2 (m).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed

Baseline Document Updates - LCSP

A POP 1 LO

Baseline Document Updates - Connectivity CDD

Item No.

0008AP

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - Connectivity CDD Contractor to perform Baseline Document Updates - Connectivity CDD IAW PWS Section 3.3.2 (n).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - Architecture HTML User Guide

Item No.

0008AQ

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Support- Professional: Engineering/Technical Contractor to perform Baseline Document Updates - Architecture HTML User Guide IAW PWS Section 3.3.2 (o).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Baseline Document Updates - Architecture HTML User Guide

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - OBD

Item No.

0008AR

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - OBD Contractor to perform Baseline Document Updates - OBD IAW PWS Section 3.3.2 (p).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - EICD

Item No.

0008AS

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - EICD Contractor to perform Baseline Document Updates - EICD IAW PWS Section 3.3.2 (q).

Baseline Document Updates - EICD

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Baseline Document Updates - ICD

Item No.

0008AT

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - ICD Contractor to perform Baseline Document Updates - ICD IAW PWS Section 3.3.2 (r).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Create A-10 Platform Obsolescence Plan

Item No.

Create A-10 Platform Obsolescence Plan

1 LO See Pricing Attachment

To be Determined

R425 FJ

Create A-10 Platform Obsolescence Plan Contractor to perform Obsolescence Analysis/Updates IAW PWS Sections 3.4.1.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Obsolescence Analysis/Updates

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Support- Professional: Engineering/Technical Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of

AVCOM updates for Obsolescence

Item No.

0010AA

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

AVCOM updates for Obsolescence Contractor to perform AVCOM updates for Obsolescence IAW PWS Section 3.4.2-3.4.6.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Avionics Commodities

Item No.

0010AB

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Avionics Commodities Contractor to perform compare/analyze avionics commodities IAW PWS Section 3.4.7.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of

A POP 1 LO *12 Months

Avionics Commodities

Proposed Period of Performance

A POP 1 LO

Support Equipment Roadmap Process

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Support Equipment Roadmap Process Contractor to perform support equipment roadmap process IAW PWS Section 3.5-3.5.5.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

A-10 Weapon System Management Environment

Item No.

R425 FJ

A-10 Weapon System Management Environment Contractor to perform A-10 Weapon System Management Environment (AWSME) IAW PWS Section 3.6.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

AWSME/JRAMS Maintenance and Updates

Item No.

0012AA

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

AWSME/JRAMS Maintenance and Updates Contractor to perform AWSME/JRAMS Maintenance and Updates IAW PWS Section 3.6.1- 3.6.8.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

AWSME Application Updates

Item No.

0012AB

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

AWSME Application Updates Contractor to perform AWSME Application Updates IAW PWS Section 3.6.9 (b-h).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of

AWSME Application Updates

Proposed Period of Performance

A POP 1 LO

FSIDs

Item No.

0012AC

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

FSIDs Contractor to perform FSIDs IAW PWS Section 3.6.9 (a).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

ELA

Item No.

0012AD

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

ELA

Contractor to perform ELA IAW PWS Section 3.6.10.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

ELA

Place of Perf Quantity (U/I) *ARO Each Individual Order

_ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Aircraft Configuration Technical Support

Item No.

R425 FJ

Aircraft Configuration Technical Support Contractor to perform Aircraft Configuration Technical Support IAW PWS Section 3.7.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Modification Matrix

Item No.

0013AA

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Modification Matrix Contractor to perform Modification Matrix IAW PWS Section 3.7.1(a-c).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required

Modification Matrix

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

TCTO Tracking

Item No.

0013AB

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

TCTO Tracking Contractor to perform TCTO Tracking IAW PWS Section 3.7.1(b,d).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Review Accuracy of Changes to A-10 Engineering Drawings

Item No.

0013AC

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Review Accuracy of Changes to A-10 Engineering Drawings Contractor to perform Review Accuracy of Changes to A-10 Engineering Drawings IAW PWS Section 3.7.2.

Review Accuracy of Changes to A-10 Engineering Drawings

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Systems Engineering and CM inputs

Item No.

0013AD

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Systems Engineering and CM inputs Contractor to perform Systems Engineering and CM inputs (CCB and EN reviews) IAW PWS Section 3.7.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

Aircraft Modification Packages

Item No.

0013AE

Aircraft Modification Packages

1 LO See Pricing Attachment

To be Determined

R425 FJ

Aircraft Modification Packages Contractor to perform Completeness and Accuracy of Aircraft Modification Packages (OSS&E/Integration/CM Process Support) IAW PWS Section 3.7.4.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

A-10 Aircraft Configuration Audit

Item No.

0013AF

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

A-10 Aircraft Configuration Audit Contractor to perform A-10 Aircraft Configuration Audit IAW PWS Section 3.7.5.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of

Non-Volatale RMMD OUE

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Non-Volatale RMMD OUE Contractor to perform Non-Volatale RMMD OUE IAW PWS Section 3.10.1(a-d).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *18 Months

Proposed Period of Performance

A POP 1 LO

HARS OUE

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

HARS OUE

Contractor to perform HARS OUE IAW PWS Section 3.10.2 (b-c).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of

A POP 1 LO *18 Months

HARS OUE

Proposed Period of Performance

A POP 1 LO

HARS OUE-Integrate, test, validate AHRS as preferred solution

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

HARS OUE-Integrate, test, validate AHRS as preferred solution Contractor to perform HARS OUE-Integrate, test, validate AHRS as preferred solution IAW PWS Section 3.10.2(d).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *18 Months

Proposed Period of Performance

A POP 1 LO

HARS OUE-Integrate, test, validate uPNT tech preferred solution

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

HARS OUE-Integrate, test, validate uPNT tech preferred solution Contractor to perform HARS OUE-Integrate, test, validate uPNT tech preferred solution IAW PWS Section 3.10.2 (e).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

HARS OUE-Integrate, test, validate uPNT tech preferred solution

Place of Perf Quantity (U/I) *ARO Each Individual Order

_ Req No / Pri

Required Period of Performance

A POP 1 LO *18 Months

Proposed Period of Performance

A POP 1 LO

Fuel Qty Indicating System OUE

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Fuel Qty Indicating System OUE Contractor to perform Fuel Qty Indicating System OUE IAW PWS Section 3.10.3 (a-c).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *18 Months

Proposed Period of Performance

A POP 1 LO

Data

Item No.

Not Separatley Priced Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Data DATA IAW table 4.0 in the PWS.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost 1 LO See Pricing

Attachment Not Separately Priced

R425 FJ

Travel Travel IAW PWS Section 5.7(a-d, f-o).

Note: This CLIN will only be funded with Sustainment Engineering Funds.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

A POP 1 LO TBC

Proposed Period of Performance

A POP 1 LO

Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Unit Price Total Estimated Cost 1 LO See Pricing

Attachment Not Separately Priced

R425 FJ

Travel Travel IAW PWS Section 5.7e.

Note: This CLIN will only be funded with BA01 funds.

Travel

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder

_ Req No / Pri

Required Period of Performance

A POP 1 LO TBC

Proposed Period of Performance

A POP 1 LO

OPTION - De-Confliction Matrix Analysis

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 De-Confliction Matrix Analysis Option to Extend Services IAW 52.217-8. Contractor to perform De-confliction Matrix Analysis shall be performed IAW PWS Section 3.1.1 (a-p).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoice Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Avionics System Architecture Integration, Updates and Support

Item No.

OPTION - Avionics System Architecture Integration, Updates and Support

Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 Avionics System Architecture Integration, Updates and Support Option to Extend Services IAW 52.217-8. Contractor to perform Avionics System Architecture Integration, Updates and Support IAW PWS Section 3.1.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Genesys Architecture Database Tool Analysis

Item No.

Firm Fixed Price Quantity U/I Unit Price To Be Determined 1 LO See Pricing

Attachment To be Determined

R425 FJ

Genesys Architecture Database Tool Analysis Option to Extend Services IAW 52.217-8. Contractor to perform Genesys Architecture Database Tool Analysis IAW PWS Section 3.1.2.1 (a,b).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed

OPTION - Genesys Architecture Database Tool Analysis

A POP 1 LO

OPTION - Alternate Database Tool Determination

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Alternate Database Tool Determination Option to Extend Services IAW 52.217-8. Contractor to perform Alternate Database Tool Determination IAW PWS Section 3.1.2.2 (a,b) Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Architecture Updates, Integration, and Support

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Architecture Updates, Integration, and Support Option to Extend Services IAW 52.217-8. Contractor to perform Architecture Updates, Integration, and Support IAW PWS Section 3.1.2.3 (a-g, i-k).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination

OPTION - Architecture Updates, Integration, and Support

Place of Perf Quantity (U/I) *ARO Each Individual Order

_ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Emerging Technoloy Analysis

Item No.

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Emerging Technoloy Analysis Option to Extend Services IAW 52.217-8. Contractor to perform Emerging Technoloy Analysis IAW PWS Section

3.1.2.3 (h).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Requirements Managment Software Licensing and Installation

Item No.

Requirements managment Software Licensing and Installation

OPTION - Requirements Managment Software Licensing and Installation

Option to Extend Services IAW 52.217-8. Contractor to perform Requirements managment Software Licensing and Installation IAW PWS Section 3.2.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

OPTION - DOORS

Item No.

1007AA

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

DOORS

Option to Extend Services IAW 52.217-8. Contractor to perform DOORS IAW PWS Section 3.2 (a,d).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - CORE

Item No.

1007AB

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

CORE

Option to Extend Services IAW 52.217-8. Contractor to perform CORE IAW PWS Section 3.2 (b,d).

OPTION - CORE

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Genysis/Equivalent

Item No.

1007AC

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Genysis/Equivalent Option to Extend Services IAW 52.217-8. Contractor to perform Genysis/Equivilant IAW PWS Section 3.2 (c,d).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Engineering Baseline Maintenance

Item No.

OPTION - Engineering Baseline Maintenance

R425 FJ

Engineering Baseline Maintenance Option to Extend Services IAW 52.217-8. Contractor to perform Engineering Baseline Maintenance IAW PWS Section 3.3.

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

OPTION - Architecture Validation

Item No.

1008AA

Firm Fixed Price Quantity U/I Unit Price Total Price

LO See Pricing Attachment

To be Determined

R425 FJ

Architecture Validation Option to Extend Services IAW 52.217-8. Contractor to perform Architecture Validation IAW PWS Section 3.3.1 (a,b).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Architecture Validation

Item No.

1008AB

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

Architecture Validation

OPTION - Architecture Validation

Option to Extend Services IAW 52.217-8. Contractor to perform Architecture Validation IAW PWS Section 3.3.1 (a,b).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Requirements Management

Item No.

1008AC

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Requirements Management Option to Extend Services IAW 52.217-8. Contractor to perform Requirements Management IAW PWS Section 3.3.2 (a-c).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of

OPTION - Baseline Document Updates - SEP

Item No.

1008AD

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - SEP Option to Extend Services IAW 52.217-8. Contractor to perform Baseline Document Updates - SEP IAW PWS Section

3.3.2 (d).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Baseline Document Updates - SEPTR

Item No.

1008AE

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - SEPTR Option to Extend Services IAW 52.217-8. Contractor to perform Baseline Document Updates - SEPTR IAW PWS Section 3.3.2 (e).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of

OPTION - Baseline Document Updates - SEPTR

Proposed Period of Performance

A POP 1 LO

OPTION - Baseline Document Updates - Engineering Handboo

Item No.

1008AF

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - Engineering Handbook Option to Extend Services IAW 52.217-8. Contractor to perform Baseline Document Updates - Engineering Handbook IAW PWS Section 3.3.2 (f).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Baseline Document Updates - Top Level SDM

Item No.

1008AG

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - Top Level SDM Option to Extend Services IAW 52.217-8. Contractor to perform Baseline Document Updates - Top Level SDM IAW PWS Section 3.3.2 (g).

OPTION - Baseline Document Updates - Top Level SDM

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Baseline Document Updates - ICMP

Item No.

1008AH

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline Document Updates - ICMP Option to Extend Services IAW 52.217-8. Contractor to perform Baseline Document Updates - ICMP IAW PWS Section 3.3.2 (h).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Baseline Document Updates - AMP

Item No.

1008AJ

OPTION - Baseline Document Updates - AMP

LO See Pricing Attachment

To be Determined

R425 FJ

Baseline Document Updates - AMP Option to Extend Services IAW 52.217-8. Contractor to perform Baseline Document Updates - AMP IAW PWS Section 3.3.2 (i).

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Each

Individual Order _ Req No / Pri

Required Period of Performance

A POP 1 LO *12 Months

Proposed Period of Performance

A POP 1 LO

OPTION - Baseline Document Updates - RMP

Item No.

1008AK

Firm Fixed Price Quantity U/I Unit Price Total Price 1 LO See Pricing

Attachment To be Determined

R425 FJ

Baseline…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .