Statement_of_Work.pdf

PDF 252 KB Posted

Attached to
Zeiss Coordinate Measuring Machine Federal contract opportunity
Solicitation number
FA8126-18-R-0002
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Zeiss Coordinate Measuring Machine, newest first.
File Type Posted
H8WM03_J&A_Redacted.pdf PDF
FA812618R0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

(SOW)

QVC Coordinate Measuring Machine (CMM)

H8WM03

1.0. Scope – This purchase description details the requirements for furnishing, shipping, installing, assembling, and verification/calibration of a commercially available Coordinate Measuring Machine (CMM). The CMM shall be utilized to verify the dimensional integrity of large scale weapon systems and component parts that are repaired and/or manufactured as well as inspection of the necessary tooling and fixturing required to produce the weapon systems and component parts. Contractor shall provide all labor, tools, equipment, materials, parts, personal protective equipment (PPE), transportation and any other incidentals to travel to Tinker AFB OK.

Offloading and placement of CMM will be provided by Tinker AFB personnel at the guidance of contractor technical personnel.

2.0. Requirements and Specifications

2.1. Design – The CMM shall be one of the manufacturer’s current production models; new and unused. The

CMM related components and accessories shall meet or exceed the minimum requirements for design, construction, functional capability, size and performance as specified herein. All parts subject to wear, breakage or distortion shall be readily accessible for adjustment, replacement and repair.

2.2. Measuring System – Either the U. S. Customary System of Units (US) or the International System of

Units (SI) may be used in the design and manufacture of the CMM. The CMM shall be inch/metric switchable with automatic conversion by the system between the two systems of measurement.

2.3. Construction – All parts and materials used in the construction of the CMM shall be new. The quality of construction shall be provided to meet the strength, rigidity and wear resistance characteristics necessary to meet the standards for accuracy, performance and safety specified herein. All parts and mechanisms requiring adjustment, replacement or servicing shall be readily accessible. The CMM shall be complete so that when installed and connected to the proper utilities it shall be ready for use. The construction of the CMM shall be free from any defects; primarily, but not only, those which would affect the operation of the CMM.

2.4. Maintenance – Test procedures and instructions shall be provided for identification, location and repair of mechanical, electrical and electronic failures. Parts lists/drawings, circuit diagrams and electrical/electronic schematic shall be provided for both preventative and remedial maintenance.

2.5. Lubrication – All parts of the CMM requiring continuous lubrication shall be automatically lubricated by a system that will ensure adequate lubrication of parts. Parts or mechanisms requiring periodic lubrication shall be provided with adequate means for grease or oil lubrication. Systems using recirculated oil shall be equipped with a replaceable or washable filter element. Each oil reservoir shall have an oil level gage. Automatic processes of lubrication shall have a warning device to indicate when lube oil is low or system failure.

2.6. Bearings – All moving components of the CMM requiring bearings shall be equipped with anti-friction and free-floating air, ball or roller bearings. All bearings should be precision ground, honed and/or lapped and be constructed to withstand the applicable axial and radial loads. All bearings will be adequately marked for replacement purposes. Each measurement axis of the CMM will be supported by air bearings, with means for adjustment provided to facilitate alignment and calibration. All sliding surfaces of the CMM that are subject to wear shall have provisions for lubrication and have replaceable bearing surfaces. Air bearings will be of open orifice type to prevent clogging due to the collection of extremely fine particle matter which may be allowed to pass through the filtering system.

2.7. Bearing Surfaces – All bearing surfaces shall be designed and constructed to eliminate inaccuracies caused by deflections of machine components and to prevent applicable load factors from adding to the total error.

2.8. Plates – All instruction plates and identification plates attached to the CMM shall be of a corrosion resistant material. Wording shall be in the English language using plain bold-face letters and shall be made legible and permanent on a contrasting non-glare background.

2.9. Safety and Health – Covers, guards or other safety devices will be provided for all parts of the CMM that present potential safety hazards. Safety devices shall not interfere with the operation of the CMM. The safety devices will prevent unintentional contact with the guarded part(s) and will be removable to facilitate inspection, maintenance and replacement of the part(s). All parts, components, mechanisms and assemblies furnished with the CMM shall comply with applicable requirements of OSHA.

Additional safety and health requirements will be as specified herein.

2.10. Mercury Restriction – The CMM will not contain mercury or mercury compounds, nor be exposed to free mercury during manufacture.

2.11. Asbestos Restriction – Asbestos and materials containing asbestos will not be used on or in the CMM and are strictly forbidden.

2.12. Lead Restriction - Lead and lead-based compounds including lead-based paints are strictly forbidden.

2.13. Ozone Depleting Substances - All class 1 ozone depleting substances (ODSs) are strictly forbidden

2.14. Environmental Protection – Under the operating, service, transportation and storage conditions described herein, the CMM will not emit materials or radiation hazardous to the operator or ecological system as prohibited by Federal, State or Local statutes in effect at the time of installation.

2.15. Affirmative Procurement Determination - Green/Affirmative Procurement has been determined not to be applicable to this procurement.

3.0. Components

3.1. CMM – The CMM shall consist of a moving bridge system (not a gantry) including a fixed granite or steel inspection table as the base of the machine. The measuring machine shall be of sufficient size and stability to provide full measurement capabilities within a minimum 2100mm x 4400mm x 1600mm measurement envelope with all necessary clearances needed for adequate measurement approach. CMM overall height cannot exceed 5700mm.

3.2. Inspection Table – The fixed inspection table of the CMM shall be made from granite or steel. The inspection table will be able to support parts weighing up to 10000kg without degrading the measurement performance accuracy of the CMM or table flatness. The inspection table will have the manufacturer’s standard number of threaded inserts with center-to-center distances and diameter common for work-holding devices or fixturing.

3.3. Bridge Structure – The moving bridge structure supporting the probe system will conform to standard industry practices and will be supported by air bearings for stability. The bridge structure shall be designed and constructed to achieve maximum stability while at the same time minimizing any induced error resulting from temperature changes and particulate infiltration. The bridge structure will be made of the same material to minimize thermal expansion that would adversely affect the accuracy of the CMM.

3.4. Drive System – Must be a bridge (not gantry style) structure, carriage crosslide and ram shall be driven by variable speed, high torque AC or DC servo motors that drive precision rack-and-pinions and/or ball screw and nut assemblies. Linear scales shall be integrated with the servo drive systems to form a closed loop feedback system with both computer directed and manually directed by means of remote. The motion system shall have means for backlash compensation and provisions for halting movement of the entire bridge structure should the air supply be interrupted. The servo drive/motion control system shall monitor manual CMM operations, respond to instruction entered into the remote and execute the inspection routines according to inspection programs entered into the computer control of the CMM. The drive system shall be coordinated by the computer control of point-to point, two and three dimensional contouring motion(s). The motion control drive system shall have three-axis vectoring capabilities so as to allow approach and probing at any vector normal to a feature.

3.5. Linear Measurement Devices (scales) – Linear measurement scales shall be constructed of wear resistant materials and shielded to prevent damage and contamination. The scales shall have a uniform coefficient of thermal expansion in relation to the mounting structure and have a resolution of 0.1µm or better.

3.6. Articulating Probe System – The probe system and accessories shall be of articulating type and allow for automatic sensor change. The system will have a 2.5° increment of articulation in a 2 axis motion. Each axis will be able to accommodate 180° of rotation. The software of the probe system will allow for a minimum number of qualifying positions and will not have to be qualified in all positions of motion prior to use. The system will require the ability to support automatic sensor change and the capability of either passive or active scanning, or both. The probe system sensor shall be able to accommodate an axial stylus length of 150mm or greater and a weight of 10g, with no adverse affects on the probe system in any orientation. Accuracies associated with this system shall be MPEE= 3.4+L/350 µm or better. Vendor shall furnish a master reference stylus and 9 adapter plates for use with the stylus system. The articulating head system shall have some means of collision protection to prevent damage to the head if a collision occurs. The articulating probe system must also be compatible with the vision sensor as defined in this

Statement of Work and support automatic sensor change with the scanner. This head must also be compatible with the existing Zeiss LineScan laser scanner currently in use in the lab.

3.7. Fixed Head with Integrated Swivel Joint Probe System – This probe system shall be able to perform single probings and active scanning, and should also be capable of 15° increments of rotation and lock to normal “fixed” position accuracies. The added capability of the fixed head system should allow for more weight of stylus system capacity, stylus length and rotational ability. This system shall allow for automatic probe change and be supplied with a master reference stylus and 3 adapter plates for use.The fixed head system shall have some means of collision protection to prevent damage to the head if a collision occurs. Accuracy of this fixed head system shall be MPEE= 2.8+L/400 µm or better. If the articulating head system meets ALL accuracy specifications as stated herein, the fixed head probe system may be omitted.

3.8. Vision Sensor – The CMM shall be supplied with a DotScan vision sensor that can be automatically changed onto the articulating head system. This sensor shall be fully functional at the time of changing, with all controllers, hardware and software being integrated into the CMM. The point cloud data generated shall have an automatic data transfer package into a solid modeling software. This software package can be integrated into the CMM operational software, stand alone software, or point cloud data may be downloaded into Solidworks via direct translation. A technical review MUST be completed on software packages supplied.

3.9. Probe Styli Kit – The contractor will furnish a probe styli kit designed specifically for the probe combinations as described in 3.6. and 3.7. consisting of the standard minimum items or components commonly used in CMM measurement.

3.10. Reference Sphere – A reference sphere will be provided for the tip qualification of the various styli and a vision sensor calibration standard shall be provided for use if applicable.

3.11. CMM Control Computer – The following minimum hardware and software capabilities/functions will be required (items may be exact or equivalent to):

Hardware:

a. High End Workstation

E5-2367 3.5 Ghz dual processors, Windows based, 64GB DDR4-2133 Memory, 8GB Video

Card, 256 GB SSD Drive, 2TB 7200 RPM Hard Drive, DVDRW Disc Drive

b. (2) 27” LCD Monitors with cable

c. (1) 70” Class Full Array LED Smart TV

d. (1) Full Motion Articulating TV Wall Mount Bracket 70” LCD

e. (1) 25 ft HDMI Cable for 70” monitor to CPU

f. Wireless Keyboard

g. Wireless Mouse

h. Wireless CMM Control Joystick Box

Software:

a. Windows based Operating System

b. Geometric Dimensioning and Tolerancing per ASME Y14.5M

c. Selection of geometric alogorithms per ASME Y14.5M

d. Probe calibration routines

e. Part programming routines

f. Measurement and analysis of blade profiles and complex curves and surfaces

g. IGES, DXF, STEP, SAT and Solidworks compatibility

h. Graphical presentation of results in part drawing format

i. Printing capabilities to network printer

4.0. Peripheral Devices

4.1. Modular Fixturing Plate Set – An industry standard modular workholding set (R&R Fixture Plate or equivalent) utilizing the threaded inserts called out in section 3.2. of this Statement of Work will be provided to adequately secure and level parts to be inspected and shall be large enough to cover at least

2/3 of the inspection table area of the CMM. This fixturing system shall be made of fixture cast aluminum plate with ¼-20 threaded holes ½” on center. An industry standard small fixturing holding set will be provided for use with the aluminum plate.

4.2. Un-interrupted Power Supply (UPS) – An industry standard UPS shall be supplied to power the CMM for a period of one hour or more upon loss of electric utilities. The UPS should only be utilized to condition electricity coming into the CMM and for power loss only to enable the operator to save any program/inspections that are currently running on the CMM and properly shut off the system if prolonged outage is anticipated.

4.3. Computer System Table/Workstation – A table or workstation for the operating system shall be provided by the supplier.

4.4. Probe Rack and Storage Sockets – A probe rack and stylus system holders shall be provided to house all items not in use. This rack should be able to accommodate probe heads (2), fixed head adapter plates (3),

(9) articulating head adapter plates and any other items needed for storage of probe head/stylus systems.

5.0. Additional Equipment

5.1. Air Filter / Regulator – The CMM will utilize the current 100 psi shop air supply in the exsisting area.

The contractor shall supply a means to remove contaminants and regulate the pressurized air entering into the CMM.

5.2. Refrigerated Air Dryer – The contractor shall supply a self-contained refrigerated air dryer system to reduce the amount of moisture in the pressurized air entering into the CMM.

5.3. Vibration Dampening System – The contractor shall supply some means to reduce measurement error from vibrations not associated with the CMM. Anti-vibration isolation pads are acceptable.

5.4. Machine Manuals – Two (2) complete sets of technical data (or a single electronic file of all manuals) will be submitted upon contract approval prior to delivery to ensure proper shop footprint specifications and familiarity with the CMM before delivery. This technical data will include items such as operating manuals, maintenance manuals, parts catalogs, parts lists, wiring schematics, lubrication charts, machine accuracy and alignment test results and shall be written in the English language.

6.0. Environmental Tolerance – The CMM will be located in a controlled environment wherein the temperature will be maintained at 68 degrees +/- 1 degree Fahrenheit over a 24 hour period with the humidity controlled to

30 – 50% non-condensing. The contractor shall state before contract approval whether the conditions will adversely affect the operation of the CMM.

7.0. Electrical Equipment – The electrical system of the CMM and all electrical components thereof, will conform to the requirements of NEC and operate on 115 VAC +/- 10% utilizing standard NEMA 5-15 Duplex

Receptecles. The contractor will provide full documentation of the electrical requirements and any power conditioning requirements before contract approval. All electrical equipment design and documentation is subject to final approval by the Government.

8.0. Nameplate – A corrosion resistant nameplate identifying the CMM shall be securely attached to the granite inspection table. The nameplate should contain the information listed below. The captions may be shortened or abbreviated, provided the entry for each is clear to its identity:

Manufacturer’s Name

Manufacturer’s Model Designation

Manufacturer’s Serial Number

Power Input (volts, total full load amps, phase, frequency)

Date of Manufacture

9.0. Contract Monitor Provisions

9.1. Responsibility for Inspection – Unless otherwise directed by the contracting officer, the contractor is responsible for performance of all inspection requirements herein. Except as otherwise directed by the contracting officer, the contractor may use their own or any other facilities suitable for the performance of inspection requirements specified herein, unless overruled by the Government. The Government reserves the right to perform any of the inspections set forth in the specification when such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements.

9.2. Quality Conformance Inspection – Quality conformance inspection shall be applied to each item prior to being offered for acceptance under the contract. Preliminary quality conformance inspection prior to shipment will be conducted at the facility chosen by the contractor. Final quality conformance inspection shall be conducted at the Government installation site, after installation, standard checkouts and calibration have been completed, and will consist of the examination in 9.3. and the tests in 9.4. under supervision of Government representatives appointed by the contract administrator. The calibration data obtained in the preliminary and the final quality conformance checks shall be furnished with the machine in a standard certificate format. Failure of any item to pass any examination or test shall be cause for rejection. The CMM and all equipment associated with this purchase will remain the property of the contractor until all items of this quality conformance inspection have been passed and accepted by all government representatives.

9.3. Examination – The CMM and all associated equipment shall be examined for compliance with design, construction, materials, components, electrical equipment and workmanship requirements specified herein.

9.4. Tests – The contractor shall demonstrate that the CMM performs as required herein using accepted industry standards for testingand calibration, provided these tests demonstrate all performance requirements stated in this purchase description. Failure of any test to demonstrate that the CMM and related equipment meet the minimum requirements as specified herein, will be cause for rejection.

10.0. Warranty – All components of this purchase will come with a 1 year warranty over hardware, software and computer operating system. This warranty will not be required to include normal wear on styli or collision damage of probe system. The warranty period will begin once installation, inspection, all testing and government acceptance has been approved by the contract monitor and representatives of the government.

11.0 Training – The contractor will provide a basic training course, advanced training course, curve and surface training courses at the vendors site for at least one operator. This training should cover basic and advanced operation of all CMM programming and maintenance practices associated with the CMM.

12.0. Software Support – Vendor will supply all software updates and/or patches free of charge for 1 year after acceptance. This software support will include 1 year of telephone support associated with all functions of the operation of the CMM.

13.0. Shipping – The contractor shall include all costs associated with shipping or transport of all items associated with this purchase description to the final destination of Tinker AFB, OK. Upon delivery, Tinker AFB personnel will offload the equipment to a staging area until representatives of the contractor can be on site for final installation. Any special accommodations will be noted by the vendor prior to receipt of equipment.

Staging of equipment will not exceed 14 calendar days upon receipt of equipment, unless negotiated and agreed upon by the vendor and contracting officer if changes from the original contract are deemed necessary.