Responses to Questions 29 April 2016

View the file

Other files for this federal contract opportunity

Other files attached to Underhung Bridge Cranes and Hoist, newest first.
File Type Posted
FA8126-16-R-0003-0001.pdf PDF
FA8126-16-R-0003.pdf PDF
Item_Description.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8126-16-R-0003

Responses to Questions

RFQ# FA8126-16-R-0003

29 Apr 2016

Question 1: On page eight (8), paragraph three (3) it reads, “Evaluation Criteria 1) Technical

Acceptability 2) Price” – is there additional “Technical” Criteria we need to include in our proposal other than what is in the “Bridge Cranes and Hoists Item Description” specifications?

Response 1: No.

Question 2: Are there any liquidated damages provisions?

Response 2: Please see Clause 52.212-4(6)(iii)(B) on page 25 of the Combined

Synopsis/Solicitation.

Question 3: Does the vendor need to quote installation?

Response 3: No, refer note in the item description under “additional notes” subtitle.

Question 4: Is there any sort of layout showing the host position and work envelope?

Response 4: Layout drawing showing bridge crane position can be provided after contract award.

Question 5: What repercussions, if any, if a vendor cannot meet these dates due to manufacturer’s lead times on hoist?

Response 5: Vendors should coordinate with manufacturers to present a viable price & delivery.

Vendor may present additional options if they feel they may be unable to meet the exact delivery dates. Vendor will be held accountable to agree upon delivery dates.

Question 6: Is the contractor responsible for installing the eight (8) cranes?

Response 6: No, refer note in the item description under “additional notes” subtitle.

Question 7: Who is the manufacturer and what is the model of existing “electrified conductors”?

Response 7: The electrified conductors are by Duct-O Wire, the Duct-O-Bar Electrical

Conductor System.

Question 8: Who is the manufacturer and what are the models of hoists, current collector shoes, etc. on existing bridge cranes?

Response 8: The hoists were provided as part of the bridge crane, which was manufactured by

Acco Wright.

FA8126-16-R-0003

Question 9: Who is responsible for providing information about existing bridge cranes after award, contractor or government?

Response 9: The government.