Technical_Evaluation_List.pdf
PDF 89 KB Posted
- Attached to
- Mobile Solid State Converter Unitron GFC-90T or Equal Federal contract opportunity
- Solicitation number
- FA8126-16-Q-0142
About this file
Technical Evaluation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Item_Description.pdf | ||
| Solicitation_FA8126-16-Q-0142.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL PROPOSAL EVALUATION‐CRITICAL FACTOR LIST
Project: Mobile Solid‐State Frequency Converters
Proposal Number: ______________________________________________
Contractor: _______________________________________________________
Government Evaluator: ____ __ Signature:
_________________________________________________ Date:
SPECIFIC REQUIREMENT ACCEPTABLE
NON‐
| ACCEPTABLE | REMARKS | |
| UL | 1012 | Listed |
MIL‐STD‐704F Compliant
| SAE | ARP | 5015 | Compliant | |||
| Rated | at | 90kVA | with | an | input | of |
| 480V, | 3 | phase, | 60Hz | and | an | |
| output | of | 115/200V, | 3 | phase, |
400Hz
| Input | power | cable, | from | power |
| source | to | converter, | must | be |
| single | jacket | construction | with | |
| three | conductors | and | one | |
| ground | at | 100ft | long | with |
| Appleton | ACP1034CD | plug | or |
equivalent
| Output | power | cable, | from | |
| converter | to | aircraft, | shall | be |
| MS90328‐30 | banded | |||
| configuration | in | accordance | with | |
| SAE | AS90328. | MS25486 | plug | |
| shall | be | equipped | with | |
| replaceable | nose | and | contacts | |
| Converter | shall | have | automatic | |
| line | drop | compensation | to | |
| maintain | the | output | voltage | at |
| the | aircraft | receptacle | ||
| Converter | mounted | on | a | mobile |
trailer
| Trailer | must | have | a | hinged | tow |
| bar | compatible | with | a | pintle‐ | |
| hook | hitch | ||||
| Trailer | must | have | racks | attached | |
| to | store | input | and | output | power |
| cables; | one | for | the | input | cable |
TECHNICAL PROPOSAL EVALUATION‐CRITICAL FACTOR LIST
and one for the output cable
| Trailer | must | be | capable | of | |
| prolonged | 15mph | tow | speeds | on | |
| paved | ramp | areas | |||
| Trailer | shall | be | transported | by | |
| using | material | handling | vehicles, | ||
| such | as | warehouse | tugs, | pickup | |
| trucks, | and | forklifts. | |||
| Trailer | shall | be | equipped | with | |
| solid, | non‐pneumatic | tires | that | ||
| have | an | outside | diameter | of | 16in |
| or | greater | ||||
| Combined | weight | of | trailer | and | |
| converter | shall | be | 1,500 | pounds | |
| or | less | ||||
| Contractor | shall | provide | a | cover | |
| or | other | method | of | protection | to |
| limit | paint | and | chemical | buildup | |
| on | the | converter | |||
| Converter | components | shall | be | ||
| contained | within | a | NEMA | 3R |
enclosure
| All | components | shall | operate | ||||
| from | no | load | to | rated | full | load | in |
| ambient | temperatures | between | |||||
| 32 | and | 104 | deg | F | and | relative | |
| humidity | between | 0 | and | 95 | |||
| percent | noncondensing | ||||||
| Converter | must | have | a | ||||
| diagnostic | system | that | can | ||||
| detect, | display, | and | alert | the | |||
| user | of | the | following | faults | |||
| through | the | operator | interface: | ||||
| input | over/under | voltage, | |||||
| internal | unit | fault, | over‐ | ||||
| temperature, | output | over/under | |||||
| voltage, | and | output | overload. | ||||
| Converter | must | have | a | fault | |||
| history | log | that | stores | the | most | ||
| recent | 500 | faults | or | more. | Fault | ||
| history | must | be | displayed | ||||
| through | the | operator | interface | ||||
| Converter | operator | interface | |||||
| must | have | a | push‐button | for | |||
| emergency | power | off | |||||
| Converter | shall | have | protection | ||||
| from | input/output | short | circuit, | ||||
| input | phase | loss, | over/under | ||||
| voltage, | overcurrent, | and | over‐ |
TECHNICAL PROPOSAL EVALUATION‐CRITICAL FACTOR LIST
temperature
| The | specified | equipment | shall | be |
| delivered | fully | assembled | with | |
| user | manuals, | operation | ||
| manuals, | maintenance | manuals, | ||
| wiring | diagrams, | control | wiring | |
| diagrams, | functional | block | ||
| diagrams, | tools, | assembly, | and | |
| other | necessary | incidentals | to | |
| provide | complete | turnkey |
equipment
File details come from the government source that posted it. Updated .