Cell_Fixtures-Tombstone-T-Frame_Item_Descriptions.pdf

PDF 154 KB Posted

Attached to
Cell Fixtures Federal contract opportunity
Solicitation number
FA8126-13-Q-0157
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Item Description

View the file

Other files for this federal contract opportunity

Other files attached to Cell Fixtures, newest first.
File Type Posted
X201237077-A.pdf PDF
X201237075-A.pdf PDF
X201237076-A.pdf PDF
X201237075-1.pdf PDF
Combined_Synopsis_Solicitation_.docx DOCX document
X201237076-1.pdf PDF
X201237077-1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cell Fixtures-Tombstone-T-Frame Item Descriptions

ITEM DESCRIPTIONS

CELL FIXTURES

Tombstone Tooling Block(s) - Tombstone tooling block, 32X32X55. Four (4) column faces 32” W X 55”T. Overall height= 55”. Base height =3.0”. Base finish machined with hold down holes and locating features for a 1250mm pallet. Four (4) column faces 32” W X 55”T. Dowel pin holes 1/2” diameter

(quantity 736 ) on 2” centers, with alternating 1/2-13 UNC-2B threaded holes

(quantity 574) forming a one (1) inch alternating hole pattern on each face.

Alternating dowel pin/threaded holes start 6” from base bottom datum.

Parallelism of opposing faces = 0.002”. Perpendicularity of faces to base datum = 0.002”. Hole to adjacent hole tolerance = +/-0.0005”. Hole to any hole grid tolerance= +/-0.0015”. Bore size tolerance = 0.5002-0.5006”.

Location from datum tolerance = +/-0.0015. Center locating hole in base, corresponding locating plug and edge locating threaded holes required.

Fourteen (14) each socket head cap screws and T-nuts.

Tombstone Tooling Block(s) - Tombstone tooling block, 32X32X35 with two

(2) inch thick top plate. Four (4) column faces 32” W X 30”T. Overall height= 37”. Base height =3.0”. Base finish machined with hold down holes and locating features for a 1250mm pallet. Dowel pin holes 1/2” diameter

(quantity 450) on 2” centers, with alternating 1/2-13 UNC-2B threaded holes

(quantity 434) forming a one (1) inch alternating hole pattern on each face.

Alternating dowel pin/threaded holes start 6” from base bottom datum.

Parallelism of opposing faces = 0.002”. Perpendicularity of faces to base datum = 0.002”. Hole to adjacent hole tolerance = +/-0.0005”. Hole to any hole grid tolerance= +/-0.0015”. Bore size tolerance = 0.5002 to 0.5006”.

Location from datum tolerance = +/-0.0015. Top Plate, 32”W x 32”L x 2”H, Parallelism of opposing face = 0.002”. Dowel pin holes 1/2” diameter (quantity

466) on 2” centers, with alternating 1/2-13 UNC-2B threaded holes (quantity

434) forming a one (1) inch alternating hole pattern on each face. Center locating hole in base and corresponding locating plug. Fourteen (14) each socket head cap screws and T-nuts, two each dowell pin, eight ½”x13 socket head cap screws and forged lifting eye.

T-Frame Fixture(s) – T-Frame Fixture, 10X49X65. Two (2) faces 49” W x

60.5”T. Overall height= 65”. Base height =3.0”. Column thickness=10”.

Base finish machined with hold down holes and locating features for a

1250mm pallet. Dowel pin holes 1/2” diameter (qty 1294) on 2” centers, with alternating 1/2-13 UNC-2B threaded holes (qty 1290) forming a one (1) inch alternating hole pattern on each face. Alternating dowel pin/threaded holes start 5” from base bottom datum. Parallelism of opposing faces = 0.002”.

Perpendicularity of faces to base datum = 0.005”. Hole to adjacent hole tolerance = +/-0.0005”. Hole to any hole grid tolerance= +/-0.0015”. Bore size tolerance = +/-0.0005. Location from datum tolerance = +/-0.0015. Center locating hole in base, corresponding locating plug and edge locating threaded holes required. Fourteen (14) socket head cap screws, T-nuts and one forged lifting eye.

INSPECTION TEST REPORT REQUIREMENTS

CELL FIXTURES

Inspection test reports for each of the cell fixtures shall be provided along with proof that measuring equipment utilized is traceable to ANSI/ISO/NIST standards. The inspections test results shall insure that manufactured fixtures are IAW dimensions and tolerances as specified on AF drawings X201237075-

“Tombstone Tooling Block 32”x32”x55”-HMC1250”, X20123707-“Tombstone

Tooling block 32”x32”x35”-HMC1250” and X201237077-“T-Frame Fixture

10”x65”-HMC1250”.

The inspection test report for each tooling block and T-frame fixture shall include measured values for below listed features:

-Overall height, Base LxWxH, column face W x H, -True position of ½” dowel pin holes

- Bore size tolerance, -Adjacent hole spacing tolerance, -Parallelism of opposing faces, -Perpendicularity of faces to base datum, -Hole to any hole grid tolerance, -Locating center hole bore size tolerance/counterbore and depths, -Center locating plug diametric size, tolerance and length, -Flatness and surface finish and

-Position of mounting holes.

Inspection test reports for the tombstone tooling blocks and T-frame fixtures shall be furnished to the contracting officer at least 20 days prior to shipment for approval. Fixtures shall not be shipped to Tinker AFB without written approval of the inspection test reports.

File details come from the government source that posted it. Updated .