Acoustical Baffles Q A.docx

DOCX document 13 KB Posted

Attached to
Acoustical Baffles Federal contract opportunity
Solicitation number
FA8126-11-Q-0263
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Acoustical Baffles, newest first.
File Type Posted
SOW-Install Acoustical Baffles-Bldg 9001-24Jun11.docx DOCX document
acousticalbafflesamend003.pdf PDF
acousticalbaffles updatedSOW.pdf PDF
acousticabafflesamend.pdf PDF
acamendment.pdf PDF
SOW-Install Acoustical Baffles-Bldg 9001-18Apr11.docx DOCX document
ACOUSTICBAFFLESSOL.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acoustical Baffles

FA8126-11-Q-0263

Q & A

1. Please verify statement of work document 1.2.3 allows us to hang panels from joists/beams verses “ceiling.”

Ans: Please reference Appendix A on page 8 for acoustical baffle material coverage locations. The government calls it "Ceiling Truss" (joints/beams or horizontal building structure). The ceiling trusses have been shown to contractors in the site visit. Also, roof bottom mounted (from Q-20 to Q-40) is also shown to the contractors in the visit.

2. Please verify that panels are to be joined together with "Velcro."

Ans: Contractor is allowed to use Velcro tapes or equivalent only for item No.6, page 8, Appendix A of the Statement of Work.

3. Please verify the exact mounting points for #9 in appendix A.

During the job walk there was a discussion about items obstructing the panels if hung from the ceiling joists.

Ans: Regarding #9, page 8, Appendix A, the mounting point is the ceiling truss (joints/beams or horizontal building structure located below several electrical conduit, plumbing.)

4.Please clarify in regard to the appendix that we are to hang panels to "beams" at the ceiling near the fire wall (Q line R-20 to R-40) so as to cover the fire wall.

Ans: Regarding #10, page 8, Appendix A, the mounting points are from the roof bottom or the actual building ceiling (mounting points are approximately 3" or 4" from the building ceiling).

5. Please clarify the number of transformers, their locations and how exactly the government wants the panels to hang at these locations.

Ans: There are 11 transformers and 1 electrical box in the project locations.

They are located at posts P-34, M-32, M-28, P-26, M-24, P-22, M-21, J-27, J-31, M-33, H-35 and J-37. The contractor shall offset 12" around the transformer to mount the panels.