A19-086_Ground_Power_Units_-_SOW.pdf

PDF 69 KB Posted

Attached to
Hobart Ground Power Units (Brand Name or Equal) Federal contract opportunity
Solicitation number
FA8125-19-Q-A068
Issued by
Department of the Air Force Materiel Command

About this file

Statement of Work

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

GROUND POWER UNITS

PREPARED BY:

OC-ALC/OBCA

30 May 2019

1. SCOPE

Contractor shall provide at least One (1) full business day of operator training In Accordance With (IAW) the Item Description and Statement of Work (SOW) for the requested Hobart Ground Power Units (Brand Name or Equivalent) ITW GSE Model 2400. Training will be for a minimum of four (4) Government employees. Operator training shall include but is not limited to cover training on maintenance, troubleshooting, remedial and preventive maintenance (RM/PM) cycles of the units.

Training shall be provided at Building 2136 Room 112, Dock 2, Post Location B-11 at Tinker AFB, Oklahoma.

2. BACKGROUND

The requested Ground Power Units provide power to the E3 aircraft. They are utilized in the Build Up Final Ops Gate for each aircraft.

3. REQUIREMENTS

3.1 Item Description –

• AMXG requires the purchase of five (5) each Hobart Ground Power Units (Brand Name or Equivalent) capable of meeting the following specifications:

o 5 Each ITW GSE Model 2400 Solid State Frequency Converter, Type ID

3GWH-200/260‐N Part Number: 90SX240H (Brand Name or Equivalent)

Units shall have mounted Horizontal Unit trailer INPUT: Units shall have a minimum of 480VAC +/-10%, 50-60Hz +/-

10% AC OUTPUT: Units shall have a minimum of 90kVA, 400Hz, 3x115/200VAC (93A PF0.8 / 117A PF1), 400% Overload, Units shall have integrated Line Drop Compensation (LDC) capability to a minimum of 400ft, Plus without additional permanent components/products.

Units shall have a Plug & Play voltage regulation.

Total size of units to include trailer shall not exceed: 40” Wide x 40”

Long x 50” Height.

Units shall have a Neutral Conductor rupture supervision.

Units shall have a Wall flush mount/accessible from front for periodic maintenance.

Units shall have an input power disconnect switch.

o 5 Each units shall comply with Military Interlock - E&F interlock functions added per Mil-STD 704F Part Number - AP-578817 (Brand Name or Equivalent) o 5 Each Trailer, Heavy Duty Assembly with brake and front steering - Part Number - 292180 (Brand Name or Equivalent) o Shall be FAA certified

• The Contractor shall provide a warranty of at least five (5) years for each ground power unit.

• 5 Each - ETL Listed. Units shall have a minimum of 400Hz, 50ft, single jacketed

AC power cable assembly with Therm gard protection , NSN supported and standard for all ITW 400Hz cable assemblies Part Number: JB8816-50NJ (Brand Name or Equivalent)

• 5 Each - Units shall have a minimum of 60Hz, #1 4-pronged conductor, minimum of 40' long input cable 143A rated, Anixter 5B-0104C O.D. 1.68" Part Number:

080634 (Brand Name or Equivalent)

3.2 Installation – N/A

3.3 Training

Contractor shall provide at least One (1) full business day of operator training In Accordance With (IAW) the Item Description and Statement of Work (SOW) for the requested Hobart Ground Power Units (Brand Name or Equivalent) ITW GSE Model 2400. Training will be for a minimum of four (4) Government employees.

Operator training shall include but is not limited to cover training on maintenance, troubleshooting, remedial and preventive maintenance (RM/PM) cycles of the units.

Training shall be provided at Building 2136 Room 112, Dock 2, Post Location B- 11 at Tinker AFB, Oklahoma.

4. GENERAL REQUIREMENTS

4.1 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0645 - 1530. If work hours are required outside the hours stated, the Contractor shall contact the Government POC for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or Government POC must be present with the Contractor.

4.1.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

4.2 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

4.2.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Instruction (AFI) 32-7086, “Hazardous Materials Management”, Tinker AFB procedures per Tinker Air Force Base Instruction (TAFBI) 32-7004, “Hazardous Waste Management”, and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Sup to AFI 32-7086, “Hazardous Material Management” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”.

Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.

4.3 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB

911. The Contractor shall immediately report all environmental violations to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

4.3.1 One (1) copy to CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

4.4 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this SOW.

4.5 Foreign Object Damage (FOD) and Dropped Object Prevention: (SS) Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive http://www.e-publishing.af.mil/ http://www.e-publishing.af.mil/ the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the Government POC or the YouTube site, http://www.youtube.com/watch?v=tYcbodjFPnM.

4.5.1 The Contract Manager shall provide written certification to the Government POC for each employee within ten (10) business days after the contract award date.

The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the Government POC prior to the employees starting work in the OC- ALC shops. Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the Government POC.

4.6 Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31- 116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.

4.7 Visitors Pass: The Contractor shall contact the Government POC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The Government POC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

4.8 Foreign Nationals: The Contractor shall notify the Government POC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

4.9 Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated Occupational Safety Instruction”, as established by this contract and Appendix C. The Contractor shall notify the CO, Government POC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, Government POC, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.

4.10 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, http://www.youtube.com/watch?v=tYcbodjFPnM tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

1. SCOPE
3. Requirements
4. GENERAL REQUIREMENTS

File details come from the government source that posted it.