CDRLS.pdf

PDF 220 KB Posted

Attached to
J85 Bearing Repair Federal contract opportunity
Solicitation number
FA812219R0010
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

CDRLS

View the file

Other files for this federal contract opportunity

Other files attached to J85 Bearing Repair, newest first.
File Type Posted
FA8122-19-R-0010_Q&A__2.pdf PDF
FA8122-19-R-0010_Q&A.pdf PDF
DIDS.pdf PDF
TRANS.pdf PDF
WD.txt TXT text file
PWS.docx DOCX document
FA812219R0010.pdf PDF
PKG.pdf PDF
Synopsis_1801095_J85_BEARINGS.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Report

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 07 NOV 2017DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

OC-ALC 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 1 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 FEB 2018DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Catherine.Hugues.2@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMDA Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMDA

3001 Staff Drive, Suite 2AC4 101A Tinker AFB, OK 73145-3033

Commercial phone number: (405) 582-6875

Email preferred: Catherine.Hugues.2@us.af.mil

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 2 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Comprehensive Engine Management System (CEMS) Reporting

3. SUBTITLE

CEMS

4. AUTHORITY

DI-MGMT-81324C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPZC CEMS PMO

7. DD 250 REQ

N/A

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 FEB 2018DATE:

Block D: NSN: 3110-01-253-3236OK P/N ~ R/N: 5014T13P06

AND 3110-01-053-8959OK P/N ~ R/N: 5040T17P01

Blocks: 10, 11, 12, & 13:

Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.

1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.

(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.

(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into

CEMS.

(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION

PACKAGES FOR SUBCONTRACTOR PERSONNEL.

2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

CII: LJ0851C and LJ0851B

COORDINATORS:

AFLCMC/LPZC

CEMS Program Management Office

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 3 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Report of Shipping (Item) and Packaging Discrepancy

3. SUBTITLE

SDR

4. AUTHORITY

DI-MGMT-80503

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 23 SEP 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

Contractor will use WEBSDR to submit an electronic SF-364 (Standard Form) IAW TO 00-35D-54 upon discovery of discrepancies for items of supply received for: overage, wrong item, duplication of shipment, misdirected shipment, non-receipt, damage, and/or improperly packaged shipment. If the contractor submits a SF-364, Block 12 of the SF 364 must contain the following information for the missing items:

1.) NSN

2.) Part Number 3.) Nomenclature 4.) Quantity missing 5.) Price for part replacement to include all administrative and labor costs.

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

Page 4 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

Additionally, all tags that accompanied the component, (i.e. shipping labels, repairable tags, and condition tags will be scanned and attached to the SDR/ROD request.

DCMA/QAR and/or Plant Clearance Officer must validate the discrepancy upon unpacking of the component. SDR/ROD must be submitted to the PCO/PMS within 48 hours of inventory receipt/induction.

BLOCK 11: Within 5 working days of discovery of discrepancy.

BLOCK 14: E-mail copies to addressees per attached Distribution Matrix. Report of Discrepancy shall be submitted to the material originator.

Note: It is permissible to submit paper SF 364s until access to WEBSDR is attained.

FOB DESTINATION

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

N/A

4. AUTHORITY

DI-MGMT-80441B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ANNLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 13 APR 2018DATE:

DID DI-MGMT-80441B, Government Property Inventory Report, prescribes the format, content, and preparation instructions for the data product required to meet this requirement.

Contractor shall provide in Microsoft Excel (.xls or .xlsx compatible) format. The contractor shall conduct an annual 100% physical inventory over the course of a year's time of each NIIN as not to impede maintenance operations. Upon completion of each NIINs 100% physical inventory, the contractor shall provide the AF government an inventory listing of the result of all AF Government Furnished Property (GFP) in the contractor's possession, by contract, and by National Stock Number (NSN). The Contractor shall submit a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. The report should include all AF Government Furnished Property in possession of the Contractor.

The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.

Report shall contain the following columns/data fields:

A: Contract Number B: CAGE Code C: Item Name/Description D: Manufacturer Name E: Manufacturer Part Number (if applicable) F: Material Control Number (if applicable) G: Serial Number (if applicable) H: National Stock Number (NSN) I: Quantity

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

Page 5 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

J: Unit of Measure K: Unit Acquisition Cost L: Location M: Sub Location N: Unique Item Identifier O: Type of Government Property - i.e., Government Furnished Property (GFP) or Contractor Acquired Property (CAP) P: Classification of Government Property- (i.e,, Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling (ST) Q: Posting Reference R: Date of Transaction S: Date Placed in Service T: Date of Last Physical Inventory U: Condition Code

Block 10. This report will be provided annually. Reporting Period is one year.

Block 11. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period (If period of performance begins on 13 September 17, first annual reporting period ends 12 September 18). If requested outside of an annual cadence, the data shall be current as of the date requested.

Blocks 12 and 13. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Report

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 07 NOV 2017DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the

OC-ALC 0 1 0

0 1 015. TOTAL

Page 6 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 FEB 2018DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Catherine.Hugues.2@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMDA Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMDA

3001 Staff Drive, Suite 2AC4 101A Tinker AFB, OK 73145-3033

Commercial phone number: (405) 582-6875

Email preferred: Catherine.Hugues.2@us.af.mil

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 7 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

Comprehensive Engine Management System (CEMS) Reporting

3. SUBTITLE

CEMS

4. AUTHORITY

DI-MGMT-81324C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPZC CEMS PMO

7. DD 250 REQ

N/A

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 FEB 2018DATE:

Block D: NSN: 3110-01-253-3236OK P/N ~ R/N: 5014T13P06

AND 3110-01-053-8959OK P/N ~ R/N: 5040T17P01

Blocks: 10, 11, 12, & 13:

Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.

1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.

(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.

(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into

CEMS.

(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION

PACKAGES FOR SUBCONTRACTOR PERSONNEL.

2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

CII: LJ0851C and LJ0851B

COORDINATORS:

AFLCMC/LPZC

CEMS Program Management Office

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 8 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

B005

2. TITLE OF DATA ITEM

Report of Shipping (Item) and Packaging Discrepancy

3. SUBTITLE

SDR

4. AUTHORITY

DI-MGMT-80503

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 23 SEP 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

Contractor will use WEBSDR to submit an electronic SF-364 (Standard Form) IAW TO 00-35D-54 upon discovery of discrepancies for items of supply received for: overage, wrong item, duplication of shipment, misdirected shipment, non-receipt, damage, and/or improperly packaged shipment. If the contractor submits a SF-364, Block 12 of the SF 364 must contain the following information for the missing items:

1.) NSN

2.) Part Number 3.) Nomenclature 4.) Quantity missing 5.) Price for part replacement to include all administrative and labor costs.

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

Page 9 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

Additionally, all tags that accompanied the component, (i.e. shipping labels, repairable tags, and condition tags will be scanned and attached to the SDR/ROD request.

DCMA/QAR and/or Plant Clearance Officer must validate the discrepancy upon unpacking of the component. SDR/ROD must be submitted to the PCO/PMS within 48 hours of inventory receipt/induction.

BLOCK 11: Within 5 working days of discovery of discrepancy.

BLOCK 14: E-mail copies to addressees per attached Distribution Matrix. Report of Discrepancy shall be submitted to the material originator.

Note: It is permissible to submit paper SF 364s until access to WEBSDR is attained.

FOB DESTINATION

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

B006

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

N/A

4. AUTHORITY

DI-MGMT-80441B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ANNLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 13 APR 2018DATE:

DID DI-MGMT-80441B, Government Property Inventory Report, prescribes the format, content, and preparation instructions for the data product required to meet this requirement.

Contractor shall provide in Microsoft Excel (.xls or .xlsx compatible) format. The contractor shall conduct an annual 100% physical inventory over the course of a year's time of each NIIN as not to impede maintenance operations. Upon completion of each NIINs 100% physical inventory, the contractor shall provide the AF government an inventory listing of the result of all AF Government Furnished Property (GFP) in the contractor's possession, by contract, and by National Stock Number (NSN). The Contractor shall submit a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. The report should include all AF Government Furnished Property in possession of the Contractor.

The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.

Report shall contain the following columns/data fields:

A: Contract Number B: CAGE Code C: Item Name/Description D: Manufacturer Name E: Manufacturer Part Number (if applicable) F: Material Control Number (if applicable) G: Serial Number (if applicable) H: National Stock Number (NSN) I: Quantity

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

Page 10 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

J: Unit of Measure K: Unit Acquisition Cost L: Location M: Sub Location N: Unique Item Identifier O: Type of Government Property - i.e., Government Furnished Property (GFP) or Contractor Acquired Property (CAP) P: Classification of Government Property- (i.e,, Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling (ST) Q: Posting Reference R: Date of Transaction S: Date Placed in Service T: Date of Last Physical Inventory U: Condition Code

Block 10. This report will be provided annually. Reporting Period is one year.

Block 11. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period (If period of performance begins on 13 September 17, first annual reporting period ends 12 September 18). If requested outside of an annual cadence, the data shall be current as of the date requested.

Blocks 12 and 13. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

C001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Report

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 07 NOV 2017DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the

OC-ALC 0 1 0

0 1 015. TOTAL

Page 11 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

C002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 FEB 2018DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Catherine.Hugues.2@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMDA Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMDA

3001 Staff Drive, Suite 2AC4 101A Tinker AFB, OK 73145-3033

Commercial phone number: (405) 582-6875

Email preferred: Catherine.Hugues.2@us.af.mil

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 12 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

C003

2. TITLE OF DATA ITEM

Comprehensive Engine Management System (CEMS) Reporting

3. SUBTITLE

CEMS

4. AUTHORITY

DI-MGMT-81324C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPZC CEMS PMO

7. DD 250 REQ

N/A

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 FEB 2018DATE:

Block D: NSN: 3110-01-253-3236OK P/N ~ R/N: 5014T13P06

AND 3110-01-053-8959OK P/N ~ R/N: 5040T17P01

Blocks: 10, 11, 12, & 13:

Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.

1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.

(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.

(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into

CEMS.

(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION

PACKAGES FOR SUBCONTRACTOR PERSONNEL.

2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

CII: LJ0851C and LJ0851B

COORDINATORS:

AFLCMC/LPZC

CEMS Program Management Office

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 13 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

C004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

C005

2. TITLE OF DATA ITEM

Report of Shipping (Item) and Packaging Discrepancy

3. SUBTITLE

SDR

4. AUTHORITY

DI-MGMT-80503

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 23 SEP 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

Contractor will use WEBSDR to submit an electronic SF-364 (Standard Form) IAW TO 00-35D-54 upon discovery of discrepancies for items of supply received for: overage, wrong item, duplication of shipment, misdirected shipment, non-receipt, damage, and/or improperly packaged shipment. If the contractor submits a SF-364, Block 12 of the SF 364 must contain the following information for the missing items:

1.) NSN

2.) Part Number 3.) Nomenclature 4.) Quantity missing 5.) Price for part replacement to include all administrative and labor costs.

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

Page 14 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

Additionally, all tags that accompanied the component, (i.e. shipping labels, repairable tags, and condition tags will be scanned and attached to the SDR/ROD request.

DCMA/QAR and/or Plant Clearance Officer must validate the discrepancy upon unpacking of the component. SDR/ROD must be submitted to the PCO/PMS within 48 hours of inventory receipt/induction.

BLOCK 11: Within 5 working days of discovery of discrepancy.

BLOCK 14: E-mail copies to addressees per attached Distribution Matrix. Report of Discrepancy shall be submitted to the material originator.

Note: It is permissible to submit paper SF 364s until access to WEBSDR is attained.

FOB DESTINATION

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

C006

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

N/A

4. AUTHORITY

DI-MGMT-80441B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ANNLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 13 APR 2018DATE:

DID DI-MGMT-80441B, Government Property Inventory Report, prescribes the format, content, and preparation instructions for the data product required to meet this requirement.

Contractor shall provide in Microsoft Excel (.xls or .xlsx compatible) format. The contractor shall conduct an annual 100% physical inventory over the course of a year's time of each NIIN as not to impede maintenance operations. Upon completion of each NIINs 100% physical inventory, the contractor shall provide the AF government an inventory listing of the result of all AF Government Furnished Property (GFP) in the contractor's possession, by contract, and by National Stock Number (NSN). The Contractor shall submit a Table for each designated repair facility / DoDAAC location for which the contractor has received inventory during the reporting period, including Subcontractor facilities. The report should include all AF Government Furnished Property in possession of the Contractor.

The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair facility location, including sub-contractor locations.

Report shall contain the following columns/data fields:

A: Contract Number B: CAGE Code C: Item Name/Description D: Manufacturer Name E: Manufacturer Part Number (if applicable) F: Material Control Number (if applicable) G: Serial Number (if applicable) H: National Stock Number (NSN) I: Quantity

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

Page 15 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

J: Unit of Measure K: Unit Acquisition Cost L: Location M: Sub Location N: Unique Item Identifier O: Type of Government Property - i.e., Government Furnished Property (GFP) or Contractor Acquired Property (CAP) P: Classification of Government Property- (i.e,, Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling (ST) Q: Posting Reference R: Date of Transaction S: Date Placed in Service T: Date of Last Physical Inventory U: Condition Code

Block 10. This report will be provided annually. Reporting Period is one year.

Block 11. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period (If period of performance begins on 13 September 17, first annual reporting period ends 12 September 18). If requested outside of an annual cadence, the data shall be current as of the date requested.

Blocks 12 and 13. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

D001

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Report

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 07 NOV 2017DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 736-7171.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the

OC-ALC 0 1 0

0 1 015. TOTAL

Page 16 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

D002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 FEB 2018DATE:

Manual Report:

Ref Block 11, 12, and 13

The report will be prepared using the TABLE I in DID DI-PSSS-81995 as of the last working day of the month and forwarded by email to Catherine.Hugues.2@us.af.mil, or original mail service NLT the fifth working day of the month during which the contracts assets are received. Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMDA Production Management Specialist (PMS). The last report will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMDA

3001 Staff Drive, Suite 2AC4 101A Tinker AFB, OK 73145-3033

Commercial phone number: (405) 582-6875

Email preferred: Catherine.Hugues.2@us.af.mil

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

421 SCMS/GUMDA 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 17 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

D003

2. TITLE OF DATA ITEM

Comprehensive Engine Management System (CEMS) Reporting

3. SUBTITLE

CEMS

4. AUTHORITY

DI-MGMT-81324C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPZC CEMS PMO

7. DD 250 REQ

N/A

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 12 FEB 2018DATE:

Block D: NSN: 3110-01-253-3236OK P/N ~ R/N: 5014T13P06

AND 3110-01-053-8959OK P/N ~ R/N: 5040T17P01

Blocks: 10, 11, 12, & 13:

Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.

1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.

(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.

(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into

CEMS.

(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION

PACKAGES FOR SUBCONTRACTOR PERSONNEL.

2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

CII: LJ0851C and LJ0851B

COORDINATORS:

AFLCMC/LPZC

CEMS Program Management Office

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

19 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HUGUES.CATHERINE.CALDWELL.1161951389

421 SCMS / GUMDA 405-582-6875 / 852-6875

J. DATE

19 APR 2018

Page 18 of 26DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

J85 / Multiple NSNs

E. CONTRACT / PR NO.

FD20301801095

F. CONTRACTOR

1. DATA ITEM NO.

D004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMDA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.