CDRL_Report_-_FD20301601152_.pdf

PDF 107 KB Posted

Attached to
Amplifier Subassembly Repair Federal contract opportunity
Solicitation number
FA8119-16-Q-0019
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Contract Data Requirements List Report

View the file

Other files for this federal contract opportunity

Other files attached to Amplifier Subassembly Repair, newest first.
File Type Posted
PWS_-_FD20301601152_FINAL.pdf PDF
FA8119-16-Q-0019-0002_FINAL.pdf PDF
FA8119-16-Q-0019-0001_FINAL.pdf PDF
CDRL_DID_A001_-_FD20301601152_.pdf PDF
GFP_Attachment_-_FD20301601152.pdf PDF
CDRL_DID_A003_-_FD20301601152_.pdf PDF
PWS_-_FD20301601152.docx DOCX document
FA8119-16-Q-0019_FINAL.pdf PDF
TRNSPDATA_Report_-_FD20301601152.pdf PDF
CDRL_DID_A004_-_FD20301601152_.pdf PDF
CDRL_DID_A002_-_FD20301601152_.pdf PDF
UIIEC_Report_-_FD20301601152.pdf PDF
SOW_-_FD20301601152.pdf PDF
PKGRQMT_Report_-_FD20301601152.pdf PDF
ITMDESC_Report_-_FD20301601152_FINAL.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

GPN-22 / Amplifier, Subassembly

E. CONTRACT / PR NO.

FD20301601152

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Teardown Deficiency Report

3. SUBTITLE

TDR

4. AUTHORITY

DI-ALSS-81534

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

424 SCMS/GUMF

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 04 FEB 2016DATE:

Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports. (FA8119)

Blocks 10, 11, 12, and 13: To be negotiated on call by demand.

COORDINATORS:

424 SCMS/GUMF

3001 Staff Dr., Ste. 1AC1 96A Tinker AFB, OK 73145-3033 Attn: Randall J. Burton

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

09 FEB 2016

I. APPROVED BY

//DIGITALLY SIGNED//

BURTON.RANDALL.J.1099499024

424 SCMS / GUMF 405-736-7722 / 336-7722

J. DATE

09 FEB 2016

Page 1 of 3DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 10 Feb 2016

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

GPN-22 / Amplifier, Subassembly

E. CONTRACT / PR NO.

FD20301601152

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Commercial Asset Visibility AF (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS/SOW

6. REQUIRING OFFICE

424 SCMS/GUMF

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 01 DEC 2015DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 421 SCMS/GUNA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 848 SCMG/SRM, (405) 734-7171.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC)will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

OC-ALC 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

09 FEB 2016

I. APPROVED BY

//DIGITALLY SIGNED//

BURTON.RANDALL.J.1099499024

424 SCMS / GUMF 405-736-7722 / 336-7722

J. DATE

09 FEB 2016

Page 2 of 3DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 10 Feb 2016

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

GPN-22 / Amplifier, Subassembly

E. CONTRACT / PR NO.

FD20301601152

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

N/A

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

424 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 04 FEB 2016DATE:

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8119).

COORDINATORS:

424 SCMS/GUEA

3001 Staff Dr Tinker AFB, OK 73145

0 0 1

0 0 115. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

09 FEB 2016

I. APPROVED BY

//DIGITALLY SIGNED//

BURTON.RANDALL.J.1099499024

424 SCMS / GUMF 405-736-7722 / 336-7722

J. DATE

09 FEB 2016

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

GPN-22 / Amplifier, Subassembly

E. CONTRACT / PR NO.

FD20301601152

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Parts Approval Requests

3. SUBTITLE

PAR

4. AUTHORITY

DI-MISC-80071E

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

424 SCMS/GUMF

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 18 JUL 2014DATE:

Blocks 10, 11, 12 & 13: Requests will be submitted on an as needed basis IAW the Performance Work Statement

(PWS).

COORDINATORS:

424 SCMS/GUMF

3001 Staff Drive Tinker AFB, OK 73145

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

09 FEB 2016

I. APPROVED BY

//DIGITALLY SIGNED//

BURTON.RANDALL.J.1099499024

424 SCMS / GUMF 405-736-7722 / 336-7722

J. DATE

09 FEB 2016

Page 3 of 3DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 10 Feb 2016

File details come from the government source that posted it. Updated .