1877794_CDRL1_REPORT.pdf
PDF 169 KB Posted
- Attached to
- DISPLAY UNIT, FLIGHT Federal contract opportunity
- Solicitation number
- FA8117-16-R-0019
About this file
CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA811717D0002_JA_Redacted.pdf | ||
| FA811716R0019_______0002.RTF | RTF text file | |
| FA811716R0019_______0001.RTF | RTF text file | |
| PWS_MDU_1500399_Rev2.docx | DOCX document | |
| 1568615_PKGRQMT_REPORT.pdf | ||
| 1578589_ATTACH.pdf | ||
| 1578588_ATTACH.pdf | ||
| 1578593_ATTACH.pdf | ||
| FA811716R0019.pdf | ||
| 1568548_ATTACH.docx | DOCX document | |
| 1578590_ATTACH.pdf | ||
| 1784010_ATTACH.pdf | ||
| 1565544_ATTACH.pdf | ||
| SchedGFP16R0019.pdf | ||
| 1568616_TRNSPDATA_REPORT.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility AF (CAV AF) End Item Reporting
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS/SOW
6. REQUIRING OFFICE
422 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 17 FEB 2016DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 848 SCMG/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
OC-ALC 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
Page 1 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
TDR
4. AUTHORITY
DI-ALSS-81534
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 26 JUN 2014DATE:
Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.
Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
COORDINATORS:
423 SCMS/GUMC
3001 Staff Drive Tinker AFB, OK 73145 Attn: LeChanda C. Adams
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
423 SCMS/GUEA
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 01 AUG 2014DATE:
The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8711).
COORDINATORS:
423 SCMS/GUEA
3001 Staff Drive Tinker AFB, OK 73145
0 0 1
0 0 115. TOTAL
Page 2 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Production Status Report & Report, Production, Or Delivery Problems
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-81255/T & -81178/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 27 APR 2015DATE:
Block 10: Frequency shall be as requested.
Blocks 11 & 13: To be determined prior to contract award.
Block 12: Report shall be submitted 72 hours after request of report is made.
Blk 14: Electronic distribution via email to lechanda.adams@us.af.mil
This CDRL combines parts of Data Item Description (DID) DI-MGMT-81255 and DID DI-MGMT-81178 to describe the requirements for this single report.
Data Item Description (DID) DI-MGMT-81255 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1a through 10.2.1e, 10.2.4, 10.2.6, 10.2.7, and 10.2.8.
Delete all occurrences of the word "build" from paragraph 10.2.4. Delete the remainder of the paragraph following the line beginning with the word "CLIN#", except those lines beginning with the code "F".
Paragraph 10.2.7: delete all text following the paragraph title, except the portion in the 2nd sentence after the semicolon, so that the paragraph reads as follows: "10.2.7 Contract deliveries status. If not on schedule, state reasons for delinquencies and recommendations for recovery." This section will be arranged by serial number of the item being reported.
The type of information requested by DID DI-MGMT-81255 is clarified as follows:
The "SHIP DATE" in paragraph 10.2.6 will reflect the actual shipment date, as well as an estimate. The "SHIP QUANTITY" shall be a cumulative quantity.
DID DI-MGMT-81178 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1d, 10.2.2, and 10.2.2e.
Paragraph 10.2.2, and 10.2.2e: delete the words "crisis or".
- - END OF TAILORING - -
CONTRACTOR FORMAT IS ACCEPTABLE
DID REQUIREMENTS ARE TAILORED
DELIVERY CANNOT BE DEFERRED
COORDINATORS:
Electronic (See Block 16) 0 1 0
0 1 015. TOTAL
Page 3 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Commercial Asset Visibility AF (CAV AF) End Item Reporting
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS/SOW
6. REQUIRING OFFICE
422 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 17 FEB 2016DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 848 SCMG/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
OC-ALC 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
Page 4 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
TDR
4. AUTHORITY
DI-ALSS-81534
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 26 JUN 2014DATE:
Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.
Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
COORDINATORS:
423 SCMS/GUMC
3001 Staff Drive Tinker AFB, OK 73145 Attn: LeChanda C. Adams
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
423 SCMS/GUEA
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 01 AUG 2014DATE:
The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8711).
COORDINATORS:
423 SCMS/GUEA
3001 Staff Drive Tinker AFB, OK 73145
0 0 1
0 0 115. TOTAL
Page 5 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
Production Status Report & Report, Production, Or Delivery Problems
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-81255/T & -81178/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 27 APR 2015DATE:
Block 10: Frequency shall be as requested.
Blocks 11 & 13: To be determined prior to contract award.
Block 12: Report shall be submitted 72 hours after request of report is made.
Blk 14: Electronic distribution via email to lechanda.adams@us.af.mil
This CDRL combines parts of Data Item Description (DID) DI-MGMT-81255 and DID DI-MGMT-81178 to describe the requirements for this single report.
Data Item Description (DID) DI-MGMT-81255 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1a through 10.2.1e, 10.2.4, 10.2.6, 10.2.7, and 10.2.8.
Delete all occurrences of the word "build" from paragraph 10.2.4. Delete the remainder of the paragraph following the line beginning with the word "CLIN#", except those lines beginning with the code "F".
Paragraph 10.2.7: delete all text following the paragraph title, except the portion in the 2nd sentence after the semicolon, so that the paragraph reads as follows: "10.2.7 Contract deliveries status. If not on schedule, state reasons for delinquencies and recommendations for recovery." This section will be arranged by serial number of the item being reported.
The type of information requested by DID DI-MGMT-81255 is clarified as follows:
The "SHIP DATE" in paragraph 10.2.6 will reflect the actual shipment date, as well as an estimate. The "SHIP QUANTITY" shall be a cumulative quantity.
DID DI-MGMT-81178 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1d, 10.2.2, and 10.2.2e.
Paragraph 10.2.2, and 10.2.2e: delete the words "crisis or".
- - END OF TAILORING - -
CONTRACTOR FORMAT IS ACCEPTABLE
DID REQUIREMENTS ARE TAILORED
DELIVERY CANNOT BE DEFERRED
COORDINATORS:
Electronic (See Block 16) 0 1 0
0 1 015. TOTAL
Page 6 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
C001
2. TITLE OF DATA ITEM
Commercial Asset Visibility AF (CAV AF) End Item Reporting
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS/SOW
6. REQUIRING OFFICE
422 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 17 FEB 2016DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 848 SCMG/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
OC-ALC 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
Page 7 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
C002
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
TDR
4. AUTHORITY
DI-ALSS-81534
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 26 JUN 2014DATE:
Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.
Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
COORDINATORS:
423 SCMS/GUMC
3001 Staff Drive Tinker AFB, OK 73145 Attn: LeChanda C. Adams
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
C003
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
423 SCMS/GUEA
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 01 AUG 2014DATE:
The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8711).
COORDINATORS:
423 SCMS/GUEA
3001 Staff Drive Tinker AFB, OK 73145
0 0 1
0 0 115. TOTAL
Page 8 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
C004
2. TITLE OF DATA ITEM
Production Status Report & Report, Production, Or Delivery Problems
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-81255/T & -81178/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 27 APR 2015DATE:
Block 10: Frequency shall be as requested.
Blocks 11 & 13: To be determined prior to contract award.
Block 12: Report shall be submitted 72 hours after request of report is made.
Blk 14: Electronic distribution via email to lechanda.adams@us.af.mil
This CDRL combines parts of Data Item Description (DID) DI-MGMT-81255 and DID DI-MGMT-81178 to describe the requirements for this single report.
Data Item Description (DID) DI-MGMT-81255 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1a through 10.2.1e, 10.2.4, 10.2.6, 10.2.7, and 10.2.8.
Delete all occurrences of the word "build" from paragraph 10.2.4. Delete the remainder of the paragraph following the line beginning with the word "CLIN#", except those lines beginning with the code "F".
Paragraph 10.2.7: delete all text following the paragraph title, except the portion in the 2nd sentence after the semicolon, so that the paragraph reads as follows: "10.2.7 Contract deliveries status. If not on schedule, state reasons for delinquencies and recommendations for recovery." This section will be arranged by serial number of the item being reported.
The type of information requested by DID DI-MGMT-81255 is clarified as follows:
The "SHIP DATE" in paragraph 10.2.6 will reflect the actual shipment date, as well as an estimate. The "SHIP QUANTITY" shall be a cumulative quantity.
DID DI-MGMT-81178 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1d, 10.2.2, and 10.2.2e.
Paragraph 10.2.2, and 10.2.2e: delete the words "crisis or".
- - END OF TAILORING - -
CONTRACTOR FORMAT IS ACCEPTABLE
DID REQUIREMENTS ARE TAILORED
DELIVERY CANNOT BE DEFERRED
COORDINATORS:
Electronic (See Block 16) 0 1 0
0 1 015. TOTAL
Page 9 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
D001
2. TITLE OF DATA ITEM
Commercial Asset Visibility AF (CAV AF) End Item Reporting
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS/SOW
6. REQUIRING OFFICE
422 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 17 FEB 2016DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 848 SCMG/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
OC-ALC 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
Page 10 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
D002
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
TDR
4. AUTHORITY
DI-ALSS-81534
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 26 JUN 2014DATE:
Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.
Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
COORDINATORS:
423 SCMS/GUMC
3001 Staff Drive Tinker AFB, OK 73145 Attn: LeChanda C. Adams
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
D003
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
423 SCMS/GUEA
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 01 AUG 2014DATE:
The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8711).
COORDINATORS:
423 SCMS/GUEA
3001 Staff Drive Tinker AFB, OK 73145
0 0 1
0 0 115. TOTAL
Page 11 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
D004
2. TITLE OF DATA ITEM
Production Status Report & Report, Production, Or Delivery Problems
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-81255/T & -81178/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 27 APR 2015DATE:
Block 10: Frequency shall be as requested.
Blocks 11 & 13: To be determined prior to contract award.
Block 12: Report shall be submitted 72 hours after request of report is made.
Blk 14: Electronic distribution via email to lechanda.adams@us.af.mil
This CDRL combines parts of Data Item Description (DID) DI-MGMT-81255 and DID DI-MGMT-81178 to describe the requirements for this single report.
Data Item Description (DID) DI-MGMT-81255 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1a through 10.2.1e, 10.2.4, 10.2.6, 10.2.7, and 10.2.8.
Delete all occurrences of the word "build" from paragraph 10.2.4. Delete the remainder of the paragraph following the line beginning with the word "CLIN#", except those lines beginning with the code "F".
Paragraph 10.2.7: delete all text following the paragraph title, except the portion in the 2nd sentence after the semicolon, so that the paragraph reads as follows: "10.2.7 Contract deliveries status. If not on schedule, state reasons for delinquencies and recommendations for recovery." This section will be arranged by serial number of the item being reported.
The type of information requested by DID DI-MGMT-81255 is clarified as follows:
The "SHIP DATE" in paragraph 10.2.6 will reflect the actual shipment date, as well as an estimate. The "SHIP QUANTITY" shall be a cumulative quantity.
DID DI-MGMT-81178 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1d, 10.2.2, and 10.2.2e.
Paragraph 10.2.2, and 10.2.2e: delete the words "crisis or".
- - END OF TAILORING - -
CONTRACTOR FORMAT IS ACCEPTABLE
DID REQUIREMENTS ARE TAILORED
DELIVERY CANNOT BE DEFERRED
COORDINATORS:
Electronic (See Block 16) 0 1 0
0 1 015. TOTAL
Page 12 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
E001
2. TITLE OF DATA ITEM
Commercial Asset Visibility AF (CAV AF) End Item Reporting
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS/SOW
6. REQUIRING OFFICE
422 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
See Block 16
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 17 FEB 2016DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 848 SCMG/SRM in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 848 SCMG/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
OC-ALC 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
Page 13 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
E002
2. TITLE OF DATA ITEM
Teardown Deficiency Report
3. SUBTITLE
TDR
4. AUTHORITY
DI-ALSS-81534
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 26 JUN 2014DATE:
Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.
Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
COORDINATORS:
423 SCMS/GUMC
3001 Staff Drive Tinker AFB, OK 73145 Attn: LeChanda C. Adams
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
E003
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
423 SCMS/GUEA
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 01 AUG 2014DATE:
The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award (FA8711).
COORDINATORS:
423 SCMS/GUEA
3001 Staff Drive Tinker AFB, OK 73145
0 0 1
0 0 115. TOTAL
Page 14 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-52 / Display Unit, Flight
E. CONTRACT / PR NO.
FD20301500399
F. CONTRACTOR
1. DATA ITEM NO.
E004
2. TITLE OF DATA ITEM
Production Status Report & Report, Production, Or Delivery Problems
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-81255/T & -81178/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMC
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 27 APR 2015DATE:
Block 10: Frequency shall be as requested.
Blocks 11 & 13: To be determined prior to contract award.
Block 12: Report shall be submitted 72 hours after request of report is made.
Blk 14: Electronic distribution via email to lechanda.adams@us.af.mil
This CDRL combines parts of Data Item Description (DID) DI-MGMT-81255 and DID DI-MGMT-81178 to describe the requirements for this single report.
Data Item Description (DID) DI-MGMT-81255 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1a through 10.2.1e, 10.2.4, 10.2.6, 10.2.7, and 10.2.8.
Delete all occurrences of the word "build" from paragraph 10.2.4. Delete the remainder of the paragraph following the line beginning with the word "CLIN#", except those lines beginning with the code "F".
Paragraph 10.2.7: delete all text following the paragraph title, except the portion in the 2nd sentence after the semicolon, so that the paragraph reads as follows: "10.2.7 Contract deliveries status. If not on schedule, state reasons for delinquencies and recommendations for recovery." This section will be arranged by serial number of the item being reported.
The type of information requested by DID DI-MGMT-81255 is clarified as follows:
The "SHIP DATE" in paragraph 10.2.6 will reflect the actual shipment date, as well as an estimate. The "SHIP QUANTITY" shall be a cumulative quantity.
DID DI-MGMT-81178 is tailored as follows:
Delete all text in paragraph 10, except paragraphs 10.1, 10.2, 10.2.1, 10.2.1d, 10.2.2, and 10.2.2e.
Paragraph 10.2.2, and 10.2.2e: delete the words "crisis or".
- - END OF TAILORING - -
CONTRACTOR FORMAT IS ACCEPTABLE
DID REQUIREMENTS ARE TAILORED
DELIVERY CANNOT BE DEFERRED
COORDINATORS:
Electronic (See Block 16) 0 1 0
0 1 015. TOTAL
Page 15 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 MAR 2016
I. APPROVED BY
//DIGITALLY SIGNED//
ADAMS.LECHANDA.C.1172237173
422 SCMS / GUMC 405-582-5261 / 852-5261
J. DATE
24 MAR 2016
Page 16 of 16DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Mar 2016