This is an amendment to a solicitation for a construction project at Dobbins Air Reserve Base in Georgia. The scope of work includes site preparation, roadway and storm drainage improvements, construction of bagion retaining walls, roadway features, culvert debris cages, and other associated work to eliminate accumulation of debris at the Anti-Terrorism structure upstream of Outfall 9 Culvert. The amendment answers questions about pile driving requirements if rock is encountered, and preparation of the subgrade for Armorflex creek crossing materials. The Department of the Air Force Reserve Command is the issuing agency, with a response due date of August 19, 2020 and Kevin Song and Kenneth Jacob as points of contact. Pricing was modified under CLIN 0001 and 0002 for the specified scope of work.

View the file

Other files for this federal contract opportunity

Other files attached to Construct and Repair Outfall 9 Culvert at Poorhouse Creek, newest first.
File Type Posted
PHC Attendance.pdf PDF
Attachment 2 DRAWINGS.pdf PDF
Solicitation - FA670320B0002.pdf PDF
Attachment 5 Addendum - MOD (signed).pdf PDF
Attach 6 -DOBBINS DD-1354 Template.pdf PDF
Attachment 1 SPECIFICATIONS.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Attachment 4 - Financial Worksheet_Sample.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

This amendment is to answer the questions below. The Purpose of This Amendment Is:

1. Pile driving: If we hit rock while driving the H piles for the debris rack, will the additional cost for dealing with this rock be paid for under a modification for unforeseen conditions?

- Should a contractor encounter what it believes to be an Differing Site Condition, they should comply with applicable FAR/DFAR/AFFAR requirements.

2. Should crushed stone and geotextile material be placed under the Armorflex creek crossing?

- The subgrade for the Armorflex material at the creek crossing should be prepared in accordance with the manufacturer's installation instructions and specifications.

All others remain the same.

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were modified:

0001 - The contractor shall provide all labor, materials, equipment, tools, supervision, and transportation required for site preparation and improvement, roadway and storm drainage work, and all assocaited repair work for OUTFALL 9 CULVERT AT POORHOUSE CREEK & WINDY HILL RD, in accordance with the attached Specifications (Attch 1) and Drawings (Attch 2)

INFORMATION FROM TO

CIN 00000000000005277579

0002 - The contractor shall provide all labor, materials, equipment, tools, supervision, and transporation required to construct bagion retaining walls, roadway features, culvert debris cages, and all other associated construction work for OUTFALL 9 CULVERT AT POORHOUSE CREEK & WINDY HILL RD, in accordance with the attached Specifications (Attch 1) and Drawings (Attch 2)

INFORMATION FROM TO

CIN 00000000000005277580

FA670320B00020001

IDCode:
Page: 1
Pages: 2
AmendNo: 0001
EffDate: 9/17/2020
ReqNo: F5B3230065AW01
ProjNo: FGWB 16-0017
IssCode: FA6703
AdmCode:
IssuedBy: FA6703 94 LG LGC

1538 ATLANTIC AVE

ADMINISTRATIVE ONLY NO REQUISITIONS

DOBBINS AFB, GA 30069-4824

United States Kevin Song, Email: kevin.song@us.af.mil Telephone: 6786553695

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA670320B0002
SolDate: 8/19/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript:

SEE CONTINUATION PAGE

ContNameTitle:
CoNameTitle: Kenneth Jacob

Email: kenneth.jacob.1@us.af.mil Telephone: 6786555745

ContDate:
CODate:

File details come from the government source that posted it. Updated .