Solicitation_FA6703-15-R-0002.pdf

PDF 972 KB Posted

Attached to
Rubber Removal and Maintain Markings Federal contract opportunity
Solicitation number
FA6703-15-R-0002
Issued by
Department of the Air Force Reserve Command

About this file

Solicitation FA6703-15-R-0002

View the file

Other files for this federal contract opportunity

Other files attached to Rubber Removal and Maintain Markings, newest first.
File Type Posted
Amendment_1_SF30.pdf PDF
photo_1.jpg JPG image
photo_2.jpg JPG image
Question_and_Answers.pdf PDF
SignInRoster.pdf PDF
Site_Visit_Instructions.pdf PDF
Attachment_3_Submittal_Register.pdf PDF
Attachment_5_DARB_5.pdf PDF
Attachment_2_ETL _Change_1 _Standard_Airfield.pdf PDF
Attachment_1_FGWB_14-0001_Specs.pdf PDF
Attachment_7_Financial.pdf PDF
Attachment_6_Wage_Determination.pdf PDF
Attachment_4_DARB_4.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rubber Removal and Maintain Markings Indefinite Delivery Indefinite Quantity (iDIQ) Dobbins ARB This solicitation is a 100% Small Business Set-Aside Applicable North American Industry Classif ication Code is 237310. Size Standard is $36.5M All Offerors must be registered in the System for Aw ard Management (SAM) in order to receive aw ard. Offerors can register via the internet at w w w .sam.gov Section K and L w ill be physically removed from the resultant aw ard but w ill be deemed incorporated by reference in that aw ard.

This is an Indefinite Quantity Indefinite Delivery contract for rubber removal and maintain markings on Dobbins ARB, GA. Effective for a 12 month base period from date of aw ard plus four (4) tw elve month Government option periods..

Delivery or performance time for specif ic projects w ill be specif ied in each individual task order and w ill Notice to Offeror: Funds are not presently available for this project. No aw ard w ill be made until funds are available to make payments under a contract. The Government reserves the right to cancel this solicitation, either before or after bid opening/RFP closing, w itih no obligation to the offeror by the Government.

Contractor Off icer information: Thomas MIlloy, Telephone 678-655-5783, thomas.milloy@us.af.mil

KENNETH J. JACOB 678-655-5745

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

20-Apr-2015

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, X negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 May 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

94 CONF/LGC (JACOB)

1538 ATLANTIC AVENUE

DOBBINS ARB GA 30069-4917

FA6703

PAGE OF PAGES

1 OF

CODE FA6703

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

94 CONF/LGC (JACOB)

1538 ATLANTIC AVENUE

DOBBINS ARB GA 30069-4917

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

678-655-5612FAX:TEL: 678-655-5745 TEL: 678-655-4987 FAX: 678-655-5612

FA6703-15-R-0002 147

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA6703-15-R-0002

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 170,000 Square

Foot

RUBBER REMOVAL - R/W

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber on the runway in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.

FOB: Destination

NET AMT

0002 30,000 Square

RUBBER REMOVAL - VEDA ALS

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber, VEDA ALS, in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

0003 18,750 Square

Maintain Mairkings

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY CENTER LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.CLEAN, LAYOUT, AND PAINT RUNWAY CENTER LINE 3' WIDE

0004 56,400 Square

Maintain Markings

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY EDGE LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.

0005 1,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT CMA LINES (4.5

FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6" YELLOW -6" BLACK -6"

YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

0006 100 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT VEDA ALS MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0007 50,000 Square

Maintain Markngs

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for MOLD REMOVAL AND SPECIALIZED SURFACE PREP in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.

0008 14,400 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT THRESHOLD in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.

0009 2 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT NUMBERS (#29 AND #11) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

0010 3 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT GROUND RECEIVER CHECKPOINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.

0011 1,500 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT VFR HOLD LINES

(4.5 FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6" YELLOW -6" BLACK

-6" YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

0012 60,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT TAXIWAY LINES

(CENTERLINE: 1.5 FT WIDE: 6" BLACK- 6" YELLOW- 6"

BLACK)(EDGELINE: 2.5 FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6"

YELLOW -6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0013 1,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for PAINT REMOVAL - 100% in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

0014 100,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for PAINT REMOVAL - 80% in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

0015 2 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INSTRUMENT LINE SIGNAGE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0016 1,500 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INSTRUMENT LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

0017 18,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT FIXED DISTANCE MARKERS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

0018 1 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT HELIPAD in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

0019 16,200 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT TOUCHDOWN ZONE MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0020 1 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT STOP CONTACT TOWER MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0021 300 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT FOD CHECKPOINT LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0022 2 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND 'PAINT CHECK FOR FOD' in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

0023 2 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INS CHECKPOINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0024 2,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT 6" EQUIPMENT SET-BACK LINES in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0025 4,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT 6" RESTRICTED AREA LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

0026 100 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RESTRICTED AREA SIGNAGE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

0027 1 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT LG CLOSED PAVEMENT MARKING in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

0028 1 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT SM CLOSED PAVEMENT MARKING in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

0029 1 Each Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT ENTRY CONTROL POINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

0030 9,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT CHEVRONS in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

0031 1 Each Mobilize

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for Mobilizaion in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

0032 1 Each DeMobilize

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for DeMobilizaion in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

1001 170,000 Square

OPTION RUBBER REMOVAL - R/W

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber on the runway in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

1002 30,000 Square

OPTION RUBBER REMOVAL - VEDA ALS

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber, VEDA ALS, in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

1003 18,750 Square

OPTION Maintain Mairkings

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY CENTER LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.CLEAN, 1004 56,400 Square

OPTION Maintain Markings

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY EDGE LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1005 1,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT CMA LINES (4.5

FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6" YELLOW -6" BLACK -6"

YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

1006 100 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT VEDA ALS MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1007 50,000 Square

OPTION Maintain Markngs

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for MOLD REMOVAL AND SPECIALIZED SURFACE PREP in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

1008 14,400 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT THRESHOLD in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

1009 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT NUMBERS (#29 AND #11) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

1010 3 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT GROUND RECEIVER CHECKPOINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

1011 1,500 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT VFR HOLD LINES

(4.5 FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6" YELLOW -6" BLACK

-6" YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

1012 60,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT TAXIWAY LINES

(CENTERLINE: 1.5 FT WIDE: 6" BLACK- 6" YELLOW- 6"

BLACK)(EDGELINE: 2.5 FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6"

YELLOW -6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1013 1,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for PAINT REMOVAL - 100% in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

1014 100,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for PAINT REMOVAL - 80% in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

1015 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INSTRUMENT LINE SIGNAGE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1016 1,500 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INSTRUMENT LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

1017 18,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT FIXED DISTANCE MARKERS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

1018 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT HELIPAD in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

1019 16,200 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT TOUCHDOWN ZONE MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1020 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT STOP CONTACT TOWER MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1021 300 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT FOD CHECKPOINT LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1022 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND 'PAINT CHECK FOR FOD' in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

1023 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INS CHECKPOINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1024 2,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT 6" EQUIPMENT SET-BACK LINES in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1025 4,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT 6" RESTRICTED AREA LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

1026 100 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RESTRICTED AREA SIGNAGE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

1027 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT LG CLOSED PAVEMENT MARKING in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

1028 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT SM CLOSED PAVEMENT MARKING in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

1029 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT ENTRY CONTROL POINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

1030 9,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT CHEVRONS in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

1031 1 Each OPTION Mobilize

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for Mobilizaion in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

1032 1 Each OPTION DeMobilize

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for DeMobilizaion in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

2001 170,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber on the runway in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

2002 30,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber, VEDA ALS, in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

2003 18,750 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY CENTER LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.CLEAN, 2004 56,400 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY EDGE LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2005 1,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT CMA LINES (4.5

FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6" YELLOW -6" BLACK -6"

YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

2006 100 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT VEDA ALS MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2007 50,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for MOLD REMOVAL AND SPECIALIZED SURFACE PREP in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

2008 14,400 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT THRESHOLD in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

2009 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT NUMBERS (#29 AND #11) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

2010 3 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT GROUND RECEIVER CHECKPOINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

2011 1,500 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT VFR HOLD LINES

(4.5 FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6" YELLOW -6" BLACK

-6" YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

2012 60,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT TAXIWAY LINES

(CENTERLINE: 1.5 FT WIDE: 6" BLACK- 6" YELLOW- 6"

BLACK)(EDGELINE: 2.5 FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6"

YELLOW -6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2013 1,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for PAINT REMOVAL - 100% in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

2014 100,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for PAINT REMOVAL - 80% in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

2015 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INSTRUMENT LINE SIGNAGE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2016 1,500 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INSTRUMENT LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

2017 18,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT FIXED DISTANCE MARKERS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

2018 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT HELIPAD in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

2019 16,200 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT TOUCHDOWN ZONE MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2020 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT STOP CONTACT TOWER MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2021 300 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT FOD CHECKPOINT LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2022 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND 'PAINT CHECK FOR FOD' in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

2023 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INS CHECKPOINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2024 2,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT 6" EQUIPMENT SET-BACK LINES in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2025 4,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT 6" RESTRICTED AREA LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

2026 100 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RESTRICTED AREA SIGNAGE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

2027 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT LG CLOSED PAVEMENT MARKING in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

2028 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT SM CLOSED PAVEMENT MARKING in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

2029 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT ENTRY CONTROL POINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

2030 9,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT CHEVRONS in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

2031 1 Each OPTION Mobilize

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for Mobilizaion in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

2032 1 Each OPTION DeMobilize

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for DeMobilizaion in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

3001 170,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber on the runway in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

3002 30,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber, VEDA ALS, in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

3003 18,750 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY CENTER LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.CLEAN, 3004 56,400 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY EDGE LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3005 1,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT CMA LINES (4.5

FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6" YELLOW -6" BLACK -6"

YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

3006 100 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT VEDA ALS MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3007 50,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for MOLD REMOVAL AND SPECIALIZED SURFACE PREP in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

3008 14,400 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT THRESHOLD in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

3009 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT NUMBERS (#29 AND #11) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

3010 3 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT GROUND RECEIVER CHECKPOINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

3011 1,500 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT VFR HOLD LINES

(4.5 FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6" YELLOW -6" BLACK

-6" YELLOW - 6" BLACK-6" YELLOW - 6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

3012 60,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT TAXIWAY LINES

(CENTERLINE: 1.5 FT WIDE: 6" BLACK- 6" YELLOW- 6"

BLACK)(EDGELINE: 2.5 FT WIDE: 6" BLACK- 6" YELLOW- 6" BLACK- 6"

YELLOW -6" BLACK) in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3013 1,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for PAINT REMOVAL - 100% in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

3014 100,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for PAINT REMOVAL - 80% in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

3015 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INSTRUMENT LINE SIGNAGE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3016 1,500 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INSTRUMENT LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

3017 18,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT FIXED DISTANCE MARKERS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

3018 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT HELIPAD in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

3019 16,200 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT TOUCHDOWN ZONE MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3020 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT STOP CONTACT TOWER MARKINGS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3021 300 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT FOD CHECKPOINT LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3022 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND 'PAINT CHECK FOR FOD' in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

3023 2 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT INS CHECKPOINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3024 2,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT 6" EQUIPMENT SET-BACK LINES in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3025 4,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT 6" RESTRICTED AREA LINE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

3026 100 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RESTRICTED AREA SIGNAGE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a

3027 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT LG CLOSED PAVEMENT MARKING in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

3028 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT SM CLOSED PAVEMENT MARKING in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled

3029 1 Each OPTION Maintain Markings

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT ENTRY CONTROL POINTS in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway

3030 9,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT CHEVRONS in accordance with the attached specification and drawings for Project FGWB 14- 0001. The performance will normally be scheduled during a runway closure period

3031 1 Each OPTION Mobilize

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for Mobilizaion in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

3032 1 Each OPTION DeMobilize

FFP

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary for DeMobilizaion in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

4001 170,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber on the runway in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

4002 30,000 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to remove rubber, VEDA ALS, in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour

4003 18,750 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND PAINT RUNWAY CENTER LINE 3' WIDE in accordance with the attached specification and drawings for Project FGWB 14-0001. The performance will normally be scheduled during a runway closure period and allow for 24 hour operation.CLEAN, 4004 56,400 Square

Contractor to provide all labor, materials, equipment, supervision, and transportation necessary to CLEAN, LAYOUT, AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .