02_-_Specifications_post.pdf
PDF 3 MB Posted
- Attached to
- Munitions Building Remodel Federal contract opportunity
- Solicitation number
- FA6633-18-B-0002
About this file
Attachment 2 - Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tab_G-4_-_Primary_Elec_Distribution_Sys_-_One_Line_Diagram_-_20180419.pdf | ||
| 20180626_Q&A's.pdf | ||
| B813_Panels.png | PNG image | |
| FA663318B0002_20180622.pdf | ||
| 20180622_MFR_Amendments.pdf | ||
| FA663318B0002_Specs_revised.pdf | ||
| FA663318B0002_20180615.pdf | ||
| 20180531_Attendance_Sheet.pdf | ||
| 20180202_Wage_Determination.pdf | ||
| Financial_Responsibility_Sheet.doc | DOC document | |
| SF_24_Bid_Bond_Form.pdf | ||
| FA663318B0002_20180517.pdf | ||
| 01_-_Drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Munitions Administration Remodeling and Addition – Building 814
Project No. QJKL-08-0010
Location:
934th Airlift Wing, USAFR
760 Military Highway Minneapolis – St. Paul ARS, MN 55450-2100
Project Manual Book 1 of 2
(Architectural, Civil, Structural, Mechanical, Electrical) (Book 2 begins on p. 641)
Architect's Project Number: 102116
Kodet Architectural Group, Ltd.
15 Groveland Terrace
Minneapolis, Minnesota 55403
December 21, 2017
FINAL DESIGN
BLANK PAGE
Final Design Date: 12/21/17 934th Airlift Wing Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814 Minneapolis, Minnesota Project No. QJKL-08-0010
Section 00 01 05 Page 2
CIVIL ENGINEER
I HEREBY CERTIFY THAT THIS SPECIFICATION WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION
AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
DATE 12/19/17 REG. NO. 11262
SIGNATURE
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 00 01 05 Page 4
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 00 03 20 Page 1
SECTION 00 03 20
GEOTECHNICAL MATERIAL DATA
PART 1 GENERAL
1.1 General
These Documents are Owner's information provided for Bidders' convenience and are intended to supplement rather than serve in lieu of Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. These Documents and attachments are not part of the Contract Documents.\
1.2 Existing Geotechnical Data
Contact Owner for geotechnical material data.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
-- End of Section –
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 00 03 20 Page 2
Kodet Architectural Group, Ltd Munitions Administration Remodeling and Addition – Building 814 Minneapolis, Minnesota Project No. QJKL-08-0010
Certification Page 1
DIVISION 0 BIDDING AND CONTRACT REQUIREMENTS
Title Page 00 01 05 Certification Page 00 03 20 Geotechnical Material Data
DIVISION 1 GENERAL REQUIREMENTS
01 00 00a Table of Contents 01 11 00 Summary of Work 01 14 00 Work Restrictions 01 30 00 Administrative Requirements 01 32 01 Project Schedule 01 33 00 Submittal Procedures and Submittal Register 01 35 26 Governmental Safety Requirements 01 35 29 Health, Safety, And
Emergency Response Procedures for Contaminated Sites 01 42 00 Sources for Reference Publications 01 45 00 Quality Control 01 45 35 Special Inspections 01 50 00 Temporary Construction Facilities and Controls 01 74 19 Construction and Demolition Waste Management 01 78 00 Closeout Submittals 01 78 23 Operation and Maintenance Data 01 91 00 Commissioning
DIVISION 2 SITE WORK
02 41 00 Demolition and Deconstruction
DIVISION 3 CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 4 MASONRY
04 01 20 Brick Masonry Repointing 04 20 00 Unit Masonry 04 72 00 Cast Stone Masonry
DIVISION 5 METALS
05 12 00 Structural Steel 05 21 00 Steel Joist Framing 05 30 00 Steel Decks 05 50 13 Miscellaneous Metal Fabrications
DIVISION 6 WOOD AND PLASTICS
06 10 00 Rough Carpentry 06 61 16 Solid Surfacing Fabrications
DIVISION 7 THERMAL AND MOISTURE PROTECTION
07 05 23 Pressure Testing Air Barrier 07 11 13 Bituminous Dampproofing 07 21 13 Board and Block Insulation 07 21 16 Mineral Fiber Blanket Insulation 07 21 19 Foamed-in-Place Insulation 07 22 00 Roof and Deck Insulation 07 27 26 Fluid Applied Membrane Air Barriers 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 07 60 00 Flashing and Sheet Metal 07 84 00 Firestopping 07 92 00 Joint Sealants
Certification Page 2
DIVISION 8 DOORS AND WINDOWS
08 11 13 Steel Doors and Frames 08 11 16 Aluminum doors & Frames 08 14 00 Wood Doors 08 31 13 Access Doors and Frames 08 53 00 Plastic Windows 08 71 00 Door Hardware 08 81 00 Glazing 08 91 00 Metal Wall Louvers
DIVISION 9 FINISHES
09 22 00 Supports for Plaster and Gypsum Board 09 29 00 Gypsum Board 09 30 10 Ceramic, Quarry, and Glass Tiling 09 51 00 Acoustical Ceilings 09 68 00 Carpeting 09 90 00 Paints and Coatings
DIVISION 10 SPECIALTIES
10 14 00.10 Exterior Signage 10 14 00.20 Interior Signage 10 28 13 Toilet Accessories 10 44 16 Fire Extinguishers
DIVISION 11 EQUIPMENT
No Sections under This Division
DIVISION 12 FURNISHINGS
12 24 13 Roller Window Shades 12 32 00 Manufactured Wood Casework
DIVISION 13 SPECIAL CONSTRUCTION
No Sections under This Division
DIVISION 14 CONVEYING SYSTEMS
No Sections under This Division
DIVISION 21 WET PIPE SPRINKLERS
21 13 13 Wet Pipe Sprinkler System, Fire Protection
DIVISION 22 PLUMBING
22 00 00 Plumbing, General Purpose
DIVISION 23 MECHANICAL
23 00 00 Air Supply, Distribution, Ventilation, & Exhaust Systems 23 05 15 Common Piping for HVAC 23 05 93 Testing, Adjusting, & Balancing for HVAC 23 07 00 Thermal Insulation for Mechanical Systems 23 09 00 Instrumentation & Control for HVAC 23 09 13 Instrumentation & Control Devices for HVAC 23 09 23 Lonworks Direct Digital Control for HVAC and Other Building
Control Systems 23 11 25 Facility Gas Piping 23 23 00 Refrigerant Piping 23 54 19 Building Heating Systems, Warm Air 23 57 10 Forced Hot Water Heating Systems Using Water and Steam Heat Exchangers
Minneapolis, Minnesota Project No. QJKL-08-0010
Certification Page 3
23 82 02 Unitary Heating and Cooling Equipment
DIVISION 26 ELECTRICAL
26 20 00 Interior Distribution Systems 26 27 13 Electric Meters 26 51 00 Interior Lighting 26 56 00 Exterior Lighting
DIVISION 27 COMMUNICATIONS
27 10 00 Building Telecommunications Cabling System
DIVISION 28 FIRE ALARM SYSTEM
28 31 76 Interior Alarm and Mass Notification System
DIVISION 31 EARTHWORK
31 23 00 Excavation and Fill 31 32 11 Soil Surface Erosion Control
DIVISION 32 EXTERIOR IMPROVEMENTS
32 16 13 Concrete Sidewalks and Curbs and Gutters 32 31 13 Chain Link Fences and Gates 32 92 19 Seeding
DIVISION 33 UTILITIES
33 11 00 Water Utility Distribution Piping 33 40 00 Storm Drainage Utilities 33 71 02 Underground Electrical Distribution 33 82 00 Telecommunications Outside Plant
END OF SECTION
Certification Page 4
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Salvage Plan;
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
Scope of this project is to remodel 942 sf of the existing 2,624 sf building. The scope includes but is not limited to the following:
1. New walls and interior partition will be added to meet program requirements. The space being remodeled consists of offices, updated restroom & mechanical spaces.
2. An addition approximately 1,118sf is proposed along the northwest corner of the building, which will consist of offices and work spaces.
3. Existing brick and stone band along the top will match the existing architecture on the exterior of the building.
4. The window profile will have clear glazing with operable windows. Existing windows and doors do not meet the DoD minimum antiterrorism standards for buildings, so it is proposed that the new doors and windows will also not meet the DoD minimum antiterrorism standards.
5. Small canopy will be installed over the new main entry door which has no vestibule to help protect from weather conditions.
6. The roof will consist of an EPDM system to match the existing roof.
7. Utilities will be modified as required.
8. Scope includes incidental related work.
1.2.2 Location
The work is located at the Munitions Administration Building (Building 814) at Minneapolis-Saint Paul Air Reserve Station, MN, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 OCCUPANCY OF PREMISES
Building (Building 814) will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 11 00 Page 2
Before work is started, Contractor to arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.4 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.5 NOT USED
1.6 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Pursuant to Contract Clause "FAR 52.245-1, Government Property", the Government will furnish the following materials and equipment for installation by the Contractor:
NA.
1.7 GOVERNMENT-INSTALLED WORK
NA.
1.8 SALVAGE MATERIAL AND EQUIPMENT
Salvaged brick remains the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area as determined by the Contracting Officer.
Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 14 00 Page 1
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
Construction Progress Schedule (AF IMT 3064)
Material Approval Schedule (AF IMT 3000)
List of Contact Personnel
Personnel List
1.2 SPECIAL SCHEDULING REQUIREMENTS
a. NA
b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.
c. The Buidling (Building 814) will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
d. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 Fifteen calendar days prior to the desired date of interruption.
1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry.
Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 14 00 Page 2 emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 Identification Badges and Base Access
Access onto and across the grounds shall be as directed by the Government.
Employee parking shall be as directed by the Contracting Officer. Also, the Government may impose restrictions regarding methods and points of contractor access in order to maintain orderly operation of the facility during the construction period.
1.3.1.3 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
1.3.2 Working Hours
Working hours are limited to Monday through Friday and are to be coordinated with Government.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application 15 Fifteen calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.
During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.
1.3.4 Exclusionary Period
NA
1.3.5 Occupied Buildings
The Contractor shall be working on an existing building which is occupied.
Do not enter the building without prior approval of the Contracting Officer.
The existing buildings and their contents must be kept secure at all times.
Provide temporary closures as required to maintain security as directed by the Contracting Officer.
Provide dust covers or protective enclosures to protect existing work that remains and Government material located in the building during the construction period.
Relocate movable furniture approximately 6 feet away from the Contractor's working area as required to perform the work, protect the furniture, and replace the furniture in their original location upon completion of the work. Leave attached equipment in place, and protect them against damage, or
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 14 00 Page 3 temporarily disconnect, relocate, protect, and reinstall them at the completion of the work.
1.3.6 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, are considered utility cutovers pursuant to the paragraph WORK
OUTSIDE REGULAR HOURS.
1.4 SECURITY REQUIREMENTS
Applicable contract Clauses include but are not limited to: FAR 52.204-9 Personal Identity Verification of Contractor Personnel and AFFARS 5352.242- 9000 Contractor Access to Air Force Installations.
Not Used
-- End of Section --
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 14 00 Page 4
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 30 00 Page 1
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
08/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will
View Location Map
Progress and Completion Pictures
SD-04 Samples
Color Boards
1.3 COLOR BOARDS FOR AIR FORCE PROJECTS
Submit five sets of color boards within 90 calendar days after Contract Award. Each set of boards must include samples of colors and finishes of interior surfaces, such as walls, floors, and ceilings. Present the samples on 8 by 10-1/2 inches boards (modules) with a maximum spread of 24 by 31-1/2 inches for foldouts. Design modules to fit in a standard loose-leaf, three-ring binder. Where special finishes such as architectural concrete, carpet, or prefinished textured metal panels are required, submit samples not less than 12 inches square with the board. If more space is needed, more than one board per set may be submitted. Certify that the color samples have been reviewed in detail, and that the color samples are in strict accordance with contract drawings and specifications, except as may be otherwise explicitly stated. Submittal of color samples does not relieve the Contractor of the responsibility to submit samples required elsewhere herein.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 30 00 Page 2
1.4 VIEW LOCATION MAP
Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.
1.5 PROGRESS AND COMPLETION PICTURES
Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color 150 minimum resolution in JPEG file format showing the sequence and progress of work.
Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten views from points located by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures. Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file. Include a date designator in file names. Cross reference submittals in the appropriate daily report. Photographs provided are for unrestricted use by the Government. Provide additional copy of photos to Contracting Officer.
1.6 MINIMUM INSURANCE REQUIREMENTS
Provide the minimum insurance coverage required by FAR 52.228-5 Insurance- Work on a Government Installation, during the entire period of performance under this contract. Provide other insurance coverage as required by Minnesota law.
1.7 FIRST TIER CONTRACTOR REQUIREMENTS FOR ASBESTOS CONTAINING MATERIALS
Accomplish all contract requirements of Section assigned to the directly with a first tier subcontractor.
1.8 SUPERVISION
1.8.1 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.
1.8.2 Superintendent Qualifications
The project superintendent must have a minimum of 10 years’ experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 30 00 Page 3 of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
For routine projects where the superintendent is permitted to also serve as the Quality Control (QC) Manager as established in Section 01 45 00 QUALITY CONTROL, the superintendent must have qualifications in accordance with that section.
1.8.2.1 Duties
The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project.
The superintendent is required to attend partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.
1.8.3 Non-Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
1.9 PRECONSTRUCTION
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule of prices or earned value report, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expectations of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work must also attend.
1.10 INTEGRATED PRODUCT TEAM
To most effectively accomplish this contract, the Government requires the formation of a cohesive team whose members are from the Government, the Contractor and their Subcontractors. Key personnel from the Contracting, the End User (who will occupy the facility), the Government Design and Construction team and Subject Matter Experts, the Installation, the Contractor and Subcontractors, and the Designer of Record will be invited to participate in the teaming process. The Contracting Officer will provide a list of key and optional personnel when IPT meetings are needed.
The Contracting Officer will provide Information on the Partnering Process and a list of key and optional personnel who should attend the Partnering meeting.
1.11 ELECTRONIC MAIL (E-MAIL) ADDRESS
Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 30 00 Page 4 and other similar formats. Within 10 days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats.
Multiple email addresses are not allowed.
It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this email address.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 1
SECTION 01 32 01
PROJECT SCHEDULE
02/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AACE INTERNATIONAL (AACE)
AACE 29R-03 (2011) Forensic Schedule Analysis
AACE 52R-06 (2006) Time Impact Analysis - As Applied in
Construction
U.S. ARMY CORPS OF ENGINEERS (USACE)
ER 1-1-11 (1995) Administration -- Progress, Schedules, and Network Analysis Systems
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will
Preliminary Project Schedule Initial Project Schedule Periodic Schedule Update
1.3 PROJECT SCHEDULER
Designate an authorized representative to be responsible for the preparation of the schedule and all required updating and production of reports.
2.1 SOFTWARE
The scheduling software utilized to produce and update the schedules required herein must be capable of meeting all requirements of this specification.
Scheduling software shall be Microsoft Project.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 2
2.1.1 Government Software
Provide export file in a version importable by the Government system.
3.1 GENERAL REQUIREMENTS
Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15, SCHEDULE FOR CONSTRUCTION CONTRACTS. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of construction is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules. Prepare each Project Schedule using the Precedence Diagram Method (PDM).
3.2 BASIS FOR PAYMENT AND COST LOADING
The schedule is the basis for determining contract earnings during each update period and therefore the amount of each progress payment. The aggregate value of all activities coded to a contract CLIN must equal the value of the CLIN.
3.2.1 Activity Cost Loading
Activity cost loading must be reasonable and without front-end loading.
Provide additional documentation to demonstrate reasonableness if requested by the Contracting Officer.
3.2.2 Withholdings / Payment Rejection
Failure to meet the requirements of this specification may result in the disapproval of the preliminary, initial or periodic schedule updates and subsequent rejection of payment requests until compliance is met.
In the event that the Contracting Officer directs schedule revisions and those revisions have not been included in subsequent Project Schedule revisions or updates, the Contracting Officer may withhold 10 percent of pay request amount from each payment period until such revisions to the project schedule have been made.
3.3 PROJECT SCHEDULE DETAILED REQUIREMENTS
3.3.1 Level of Detail Required
Develop the Project Schedule to the appropriate level of detail to address major milestones and to allow for satisfactory project planning and execution. Failure to develop the Project Schedule to an appropriate level of detail will result in its disapproval. The Contracting Officer will consider, but is not limited to, the following characteristics and requirements to determine appropriate level of detail:
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 3
3.3.2 Activity Durations
Reasonable activity durations are those that allow the progress of ongoing activities to be accurately determined between update periods.
Less than 2 percent of all non-procurement activities may have Original Durations (OD) greater than 20 work days or 30 calendar days.
3.3.3 Procurement Activities
Include activities associated with the critical submittals and their approvals, procurement, fabrication, and delivery of long lead materials, equipment, fabricated assemblies, and supplies. Long lead procurement activities are those with an anticipated procurement sequence of over 90 calendar days.
3.3.4 Mandatory Tasks
Include the following activities/tasks in the initial project schedule and all updates.
a. Submission, review and acceptance of SD-01 Preconstruction Submittals
(individual activity for each).
b. Submission, review and acceptance of features require design completion
c. Submission of mechanical/electrical/information systems layout drawings.
d. Long procurement activities
e. Submission and approval of O & M manuals.
f. Submission and approval of as-built drawings.
g. Submission and approval of DD1354 data and installed equipment lists.
h. Submission and approval of testing and air balance (TAB).
i. Submission of TAB specialist design review report.
j. Submission and approval of fire protection specialist.
k. Submission and approval of Building Commissioning Plan, test data, and reports: Develop the schedule logic associated with testing and commissioning of mechanical systems to a level of detail consistent with the contract commissioning requirements. All tasks associated with all building testing and commissioning will be completed prior to submission of building commissioning report and subsequent contract completion.
l. Air and water balancing.
m. Building commissioning - Functional Performance Testing.
n. Controls testing plan submission.
o. Controls testing.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 4
p. Performance Verification testing.
q. Other systems testing, if required.
r. Contractor's pre-final inspection.
s. Correction of punch list from Contractor's pre-final inspection.
t. Government's pre-final inspection.
u. Correction of punch list from Government's pre-final inspection.
v. Final inspection.
3.3.5 Government Activities
Show Government and other agency activities that could impact progress.
These activities include, but are not limited to: approvals, environmental permit approvals by State regulators, inspections, utility tie-in, Government Furnished Equipment (GFE) and Notice to Proceed (NTP) for phasing requirements.
3.3.6 Standard Activity Coding Dictionary
Use the activity coding structure defined in the Standard Data Exchange Format (SDEF) in ER 1-1-11. This exact structure is mandatory. Develop and assign all Activity Codes to activities as detailed herein. A template SDEF compatible schedule backup file is available on the QCS web site:
http://rms.usace.army.mil.
The SDEF format is as follows:
Field Activity Code Length Description
1 WRKP 3 Workers per day
2 RESP 4 Responsible party
3 AREA 4 Area of work
4 MODF 6 Modification Number
5 BIDI 6 Bid Item (CLIN)
6 PHAS 2 Phase of work
7 CATW 1 Category of work
8 FOW 20 Feature of work*
*Some systems require that FEATURE OF WORK values be placed in several activity code fields. The notation shown is for Primavera P6. Refer to the specific software guidelines with respect to the FEATURE OF WORK field requirements.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 5
3.3.6.1 Workers Per Day (WRKP)
Assign Workers per Day for all field construction or direct work activities, if directed by the Contracting Officer. Workers per day is based on the average number of workers expected each day to perform a task for the duration of that activity.
3.3.6.2 Responsible Party Coding (RESP)
Assign responsibility code for all activities to the Prime Contractor, Subcontractor(s) or Government agency(ies) responsible for performing the activity.
a. Activities coded with a Government Responsibility code include, but are not limited to: Government approvals, Government design reviews, environmental permit approvals by State regulators, and Notice to Proceed (NTP) for phasing requirements.
b. Activities cannot have more than one Responsibility Code. Examples of acceptable activity code values are: DOR (for the designer of record);
ELEC (for the electrical subcontractor); MECH (for the mechanical subcontractor); and GOVT (for USACE).
3.3.6.3 Area of Work Coding (AREA)
Assign Work Area code to activities based upon the work area in which the activity occurs. Define work areas based on resource constraints or space constraints that would preclude a resource, such as a particular trade or craft work crew from working in more than one work area at a time due to restraints on resources or space. Examples of Work Area Coding include different areas within a floor of a building, different floors within a building, and different buildings within a complex of buildings. Activities cannot have more than one Work Area Code.
Not all activities are required to be Work Area coded. A lack of Work Area coding indicates the activity is not resource or space constrained.
3.3.6.4 Modification Number (MODF)
Assign a Modification Number Code to any activity or sequence of activities added to the schedule as a result of a Contract Modification, when approved by Contracting Officer. Key all Code values to the Government's modification numbering system. An activity can have only one Modification Number Code.
3.3.6.5 Bid Item Coding (BIDI)
Assign a Bid Item Code to all activities using the Contract Line Item Schedule (CLIN) to which the activity belongs, even when an activity is not cost loaded. An activity can have only one BIDI Code.
3.3.6.6 Phase of Work Coding (PHAS)
Assign Phase of Work Code to all activities. Examples of phase of work are procurement phase and construction phase. Each activity can have only one Phase of Work code.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 6
a. Code proposed fast track design and construction phases proposed to allow filtering and organizing the schedule by fast track design and construction packages.
b. If the contract specifies phasing with separately defined performance periods, identify a Phase Code to allow filtering and organizing the schedule accordingly.
3.3.6.7 Category of Work Coding (CATW)
Assign a Category of Work Code to all activities. Category of Work Codes include, but are not limited to construction submittal, procurement, fabrication, weather sensitive installation, non-weather sensitive installation, start-up, and testing activities. Each activity can have no more than one Category of Work Code.
3.3.6.8 Feature of Work Coding (FOW)
Assign a Feature of Work Code to appropriate activities based on the Definable Feature of Work to which the activity belongs based on the approved QC plan.
Definable Feature of Work is defined in Section 01 45 00 QUALITY CONTROL.
An activity can have only one Feature of Work Code.
3.3.7 Contract Milestones and Constraints
Milestone activities are to be used for significant project events including, but not limited to, project phasing, project start and end activities, or interim completion dates. The use of artificial float constraints such as "zero free float" or "zero total float" are prohibited.
Mandatory constraints that ignore or effect network logic are prohibited.
No constrained dates are allowed in the schedule other than those specified herein. Submit additional constraints to the Contracting Officer for approval on a case by case basis.
3.3.7.1 Project Start Date Milestone and Constraint
The first activity in the project schedule must be a start milestone titled "NTP Acknowledged," which must have a "Start On" constraint date equal to the date that the NTP is acknowledged.
3.3.7.2 End Project Finish Milestone and Constraint
The last activity in the schedule must be a finish milestone titled "End Project."
Constrain the project schedule to the Contract Completion Date in such a way that if the schedule calculates an early finish, then the float calculation for "End Project" milestone reflects positive float on the longest path. If the project schedule calculates a late finish, then the "End Project" milestone float calculation reflects negative float on the longest path.
The Government is under no obligation to accelerate Government activities to support a Contractor's early completion.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 7
3.3.7.3 Interim Completion Dates and Constraints
Constrain contractually specified interim completion dates to show negative float when the calculated late finish date of the last activity in that phase is later than the specified interim completion date.
3.3.7.3.1 Start Phase
Use a start milestone as the first activity for a project phase. Call the start milestone "Start Phase X" where "X" refers to the phase of work.
3.3.7.3.2 End Phase
Use a finish milestone as the last activity for a project phase. Call the finish milestone "End Phase X" where "X" refers to the phase of work.
3.3.8 Calendars
Schedule activities on a Calendar to which the activity logically belongs.
Develop calendars to accommodate any contract defined work period such as a 7-day calendar for Government Acceptance activities, concrete cure times, etc. Develop the default Calendar to match the physical work plan with non-work periods identified including weekends and holidays. Develop sSeasonal Calendar(s) and assign to seasonally affected activities as applicable.
If an activity is weather sensitive it should be assigned to a calendar showing non-work days on a monthly basis, with the non-work days selected at random across the weeks of the calendar, using the anticipated days provided in the contract clause TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. Assign non-work days over a seven-day week as weather records are compiled on seven-day weeks, which may cause some of the weather related non-work days to fall on weekends.
3.3.9 Open Ended Logic
Only two open ended activities are allowed: the first activity "NTP Acknowledged" may have no predecessor logic, and the last activity -"End Project" may have no successor logic.
Predecessor open ended logic may be allowed in a time impact analyses upon the Contracting Officer's approval.
3.3.10 Default Progress Data Disallowed
Actual Start and Finish dates must not automatically update with default mechanisms included in the scheduling software. Updating of the percent complete and the remaining duration of any activity must be independent functions. Disable program features that calculate one of these parameters from the other. Activity Actual Start (AS) and Actual Finish (AF) dates assigned during the updating process must match those dates provided in the Contractor Quality Control Reports. Failure to document the AS and AF dates in the Daily Quality Control report will result in disapproval of the Contractor's schedule.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 8
3.3.11 Out-of-Sequence Progress
Activities that have progressed before all preceding logic has been satisfied (Out-of-Sequence Progress) will be allowed only on a case-by-case basis subject to approval by the Contracting Officer. Propose logic corrections to eliminate out of sequence progress or justify not changing the sequencing for approval prior to submitting an updated project schedule.
Address out of sequence progress or logic changes in the Narrative Report and in the periodic schedule update meetings.
3.3.12 Added and Deleted Activities
Do not delete activities from the project schedule or add new activities to the schedule without approval from the Contracting Officer. Activity ID and description changes are considered new activities and cannot be changed without Contracting Officer approval.
3.3.13 Original Durations
Activity Original Durations (OD) must be reasonable to perform the work item. OD changes are prohibited unless justification is provided and approved by the Contracting Officer.
3.3.14 Leads, Lags, and Start to Finish Relationships
Lags must be reasonable as determined by the Government and not used in place of realistic original durations, must not be in place to artificially absorb float, or to replace proper schedule logic.
a. Leads (negative lags) are prohibited.
b. Start to Finish (SF) relationships are prohibited.
3.3.15 Retained Logic
Schedule calculations must retain the logic between predecessors and successors ("retained logic" mode) even when the successor activity(s) starts and the predecessor activity(s) has not finished (out-of-sequence progress). Software features that in effect sever the tie between predecessor and successor activities when the successor has started and the predecessor logic is not satisfied ("progress override") are not be allowed.
3.3.16 Percent Complete
Update the percent complete for each activity started, based on the realistic assessment of earned value. Activities which are complete but for remaining minor punch list work and which do not restrain the initiation of successor activities may be declared 100 percent complete to allow for proper schedule management.
3.3.17 Remaining Duration
Update the remaining duration for each activity based on the number of estimated work days it will take to complete the activity. Remaining duration may not mathematically correlate with percentage found under paragraph entitled Percent Complete.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 9
3.3.18 Cost Loading of Closeout Activities
Cost load the "Correction of punch list from Government pre-final inspection" activity(ies) not less than 1 percent of the present contract value. Activity(ies) may be declared 100 percent complete upon the Government's verification of completion and correction of all punch list work identified during Government pre-final inspection(s).
3.3.18.1 As-Built Drawings
If there is no separate contract line item (CLIN) for as-built drawings, cost load the "Submission and approval of as-built drawings" activity not less than $35,000 or 1 percent of the present contract value, which ever is greater, up to $200,000. Activity will be declared 100 percent complete upon the Government's approval.
3.3.18.2 O & M Manuals
Cost load the "Submission and approval of O & M manuals" activity not less than $20,000. Activity will be declared 100 percent complete upon the Government's approval of all O & M manuals.
3.3.19 Anticipated Adverse Weather
Paragraph applicable to contracts with clause entitled TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. There shall be no time extensions for unusually severe weather.
3.3.20 Early Completion Schedule and the Right to Finish Early
An Early Completion Schedule is an Initial Project Schedule (IPS) that indicates all scope of the required contract work will be completed before the contractually required completion date.
a. No IPS indicating an Early Completion will be accepted without being fully resource-loaded (including crew sizes and manhours) and the Government agreeing that the schedule is reasonable and achievable.
b. The Government is under no obligation to accelerate work items it is responsible for to ensure that the early completion is met nor is it responsible to modify incremental funding (if applicable) for the project to meet the contractor's accelerated work.
3.4 PROJECT SCHEDULE SUBMISSIONS
Provide the submissions as described below. The data CD/DVD, reports, and network diagrams required for each submission are contained in paragraph SUBMISSION REQUIREMENTS. If the Contractor fails or refuses to furnish the information and schedule updates as set forth herein, then the Contractor will be deemed not to have provided an estimate upon which a progress payment can be made.
Review comments made by the Government on the schedule(s) do not relieve the Contractor from compliance with requirements of the Contract Documents.
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 10
3.4.1 Preliminary Project Schedule Submission
Within 15 calendar days after the NTP is acknowledged submit the Preliminary Project Schedule defining the planned operations detailed for the first 90 calendar days for approval. The approved Preliminary Project Schedule will be used for payment purposes not to exceed 90 calendar days after NTP.
Completely cost load the Preliminary Project Schedule to balance the contract award CLINS shown on the Price Schedule. The Preliminary Project Schedule may be summary in nature for the remaining performance period. It must be early start and late finish constrained and logically tied as specified. The Preliminary Project Schedule forms the basis for the Initial Project Schedule specified herein and must include all of the required plan and program preparations, submissions and approvals identified in the contract (for example, Quality Control Plan, Safety Plan, and Environmental Protection Plan) as well as design activities, planned submissions of all early design packages, permitting activities, design review conference activities, and other non-construction activities intended to occur within the first 90 calendar days. Government acceptance of the associated design package(s) and all other specified Program and Plan approvals must occur prior to any planned construction activities. Activity code any activities that are summary in nature after the first 90 calendar days with Bid Item (CLIN) code (BIDI), Responsibility Code (RESP) and Feature of Work code
(FOW).
3.4.2 Initial Project Schedule Submission
Submit the Initial Project Schedule for approval within 42 calendar days after notice to proceed is issued. The schedule must demonstrate a reasonable and realistic sequence of activities which represent all work through the entire contract performance period. No payment will be made for work items not fully detailed in the Project Schedule.
3.4.3 Periodic Schedule Updates
Update the Project Schedule on a regular basis, monthly at a minimum.
Provide a draft Periodic Schedule Update for review at the schedule update meetings as prescribed in the paragraph PERIODIC SCHEDULE UPDATE MEETINGS.
These updates will enable the Government to assess Contractor's progress.
a. Update information including Actual Start Dates (AS), Actual Finish
Dates (AF), Remaining Durations (RD), and Percent Complete is subject to the approval of the Government at the meeting.
b. AS and AF dates must match the date(s) reported on the Contractor's
Quality Control Report for an activity start or finish.
3.5 SUBMISSION REQUIREMENTS
Submit the following items for the Preliminary Schedule, Initial Schedule, and every Periodic Schedule Update throughout the life of the project:
3.5.1 Data CD/DVDs
Provide two sets of data CD/DVDs containing the current project schedule and all previously submitted schedules in the format of the scheduling software (e.g. .pdf). Also include on the data CD/DVDs the Narrative Report and all required Schedule Reports. Label each CD/DVD indicating the type of schedule (Preliminary, Initial, Update), full contract number, Data Date and
Kodet Architectural Group, Ltd. Munitions Administration Remodeling and Addition – Building 814
Section 01 32 01 Page 11 file name. Each schedule must have a unique file name and use project specific settings.
3.5.2 Narrative Report
Provide a Narrative Report with each schedule submission. The Narrative Report is expected to communicate to the Government the thorough analysis of the schedule output and the plans to compensate for any problems, either current or potential, which are revealed through that analysis. Include the following information as minimum in the Narrative Report:
a. Identify and discuss the work scheduled to start in the next update period.
b. A description of activities along the two most critical paths where the total float is less than or equal to 20 work days.
c. A description of current and anticipated problem areas or delaying factors and their impact and an explanation of corrective actions taken or required to be taken.
d. Identify and explain why activities based on their calculated late dates should have either started or finished during the update period but did not.
e. Identify and discuss all schedule changes by activity ID and activity name including what specifically was changed and why the change was needed. Include at a minimum new and deleted activities, logic changes, duration changes, calendar changes, lag changes, resource changes, and actual start and finish date changes.
f. Identify and discuss out-of-sequence work.
3.5.3 Schedule Reports
The format, filtering, organizing and sorting for each schedule report will be as directed by the Contracting Officer. Typically, reports contain Activity Numbers, Activity Description, Original Duration, Remaining Duration, Early Start Date, Early Finish Date, Late Start Date, Late Finish Date, Total Float, Actual Start Date, Actual Finish Date, and Percent Complete. Provide the reports electronically in .pdf format. Provide 1 one set of hardcopy reports. The following lists typical reports that will be requested:
3.5.3.1 Activity Report
List of all activities sorted according to activity number.
3.5.3.2 Logic Report
List of detailed predecessor and successor activities for every activity in ascending order by activity number.
3.5.3.3 Total Float Report
A list of all incomplete activities sorted in ascending order of total float.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.