QJKL_15-0028_-_Site_Visit_Questions-Responses_30_March.doc

DOC document 31 KB Posted

Attached to
Install Automatic Gates - POL Federal contract opportunity
Solicitation number
FA6633-17-B0002
Issued by
Department of the Air Force Reserve Command

About this file

Questions & Responses

View the file

Other files for this federal contract opportunity

Other files attached to Install Automatic Gates - POL, newest first.
File Type Posted
sign_in.pdf PDF
Site_Visit_Minutes_30mar17_signed.pdf PDF
Amendment_0001.docx DOCX document
SECTION__28_20_01_00_10_ELECTRONIC_SAFETY_AND_SECURITY.pdf PDF
Drawings_(2).pdf PDF
Specifications_(1).pdf PDF
SF_24_Bid_Bond_Form.pdf PDF
FA6633-17-B0002.docx DOCX document
MN36_Wage_Determination.pdf PDF
Financial_Responsibility_Sheet.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA6633-17-B0002

Site Visit Questions and Responses #1 Project No. QJKL 15-0028

Install Automatic Vehicle Gates, POL

1. QUESTION: Sheet C-02 does not correctly represent the existing conditions of the area by where the 24’ swing gate is to be installed. Can an updated drawing with dimensions be provided?

RESPONSE: The existing opening is approximately 34’, therefore the area of bituminous that is to be removed and replaced with topsoil/seeding is approximately 10’ to the east from the existing grass. The new gate will be 24’ from the east curb to the west.

2. QUESTION: Is there an existing topo map for the 40’ gate area? There was one provided for the east swing gate, but not one provided for the sliding gate. Can the Government provide a plan showing the topo map for the sliding gate?

RESPONSE: There is not an existing topo survey of the west gate. However, the area is relatively flat and the government believes that a topo survey is unnecessary.

3. QUESTION: Can the government explain the note with Spec section 32 31 00 that states (if used in Construction)?

RESPONSE: The specifications, 32 31 00, were provided by the gate manufacturer and subsequently used as the basis for the design drawings. The contractor is free to choose a different gate, subject to the government's approval.