YTPM_15-0002_CONSTRUCT_DRAINAGE_MEPS,_SOW.docx

DOCX document 1 MB Posted

Attached to
Construct Drainage MEPS, Bldg 5411 Federal contract opportunity
Solicitation number
FA6606-17-R-0014
Issued by
Department of the Air Force Reserve Command

About this file

Construct Drainage MEPS SOW

View the file

Other files for this federal contract opportunity

Other files attached to Construct Drainage MEPS, Bldg 5411, newest first.
File Type Posted
Reponse_to_Request_for_Information__2.pdf PDF
Reponse_to_Request_for_Information__1.pdf PDF
FA6606-17-R-0014-0001_Amendment_Construct_Drainage,_Bldg_5411.pdf PDF
Construct_Drainage-Drawings_Existing.pdf PDF
IRRIGATION_SYSTEM_BLDG_5411.pdf PDF
CIVIL_SHEET.pdf PDF
FA6606-17-R-0014_Solicitation_Construct_Drainage,_Bldg_5411.pdf PDF
YTPM_15-0002,_General_Conditions.docx DOCX document
Wage_Determinations_MA170015_05052017.docx DOCX document
NEW_DRAINAGE.PDF PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

PROJECT YTPM 15-0002

CONSTRUCT DRAINAGE MEPS, BLDG 5411

AIR FORCE RESERVE

439 CIVIL ENGINEERING

WESTOVER AIR RESERVE BASE

CHICOPEE, MASSACHUSETTS 01022

9 MAY 2017

STATEMENT OF WORK

YTPM 15-0002

Construct Drainage, MEPS 9 May 2017

1. GENERAL _______________________________

A. This project consists of, but is not limited to the furnishing of all plant, labor, equipment, devices, tools, materials, transportation, supervision, and all miscellaneous requirements necessary to accomplish the work at the MEPS facility. All work shall be completed in conformance with applicable drawings, attached supplemental specifications, details and informational data.

B. The contractor shall install an underground drainage system to handle identified building downspouts and area surface water. The work shall also include the grading of the building site to allow for proper drainage.

C. See attached General Requirements for all Westover ARB specific requirements, rules and regulations.

2. SCOPE OF WORK ______________________________

A. The contractor must install subsurface perforated drainage pipe from identified downspouts.

B. The contractor will install a centrally located cast iron grate catch basin that receives the discharge from the down spout drainage pipe and surrounding surface water. The catch basin shall be perforated as well in order to maximize water removal by natural means.

C. An overflow pipe, non-perforated, will run from the newly installed catch basin to the existing storm water system identified on the attached drawings.

D. In order to maximize natural surface drainage potential, identified parking spots and sidewalks adjacent to the facility will be demolished. Construct new curb line and sidewalk away from the facility to allow for increased grass surface. See attached drawings for layout.

E. The contractor shall remove identified planting beds and landscaping adjacent to the facility to allow for proper drainage and ventilation. All trees utilized in the screening of the outside HVAC unit will be removed to include stumps.

F. The identified areas around the facility will be regraded for proper drainage. All disturbed areas will be hydro-seeded and watered until grass has been established.

G. Bring all splash blocks above grade and install drain extenders on down spouts as identified on the attached drawings.

H. Repair/reset sprinkler heads based on new grade from work performed.

I. Extend/expand sprinkler system to cover additional grass area from the removal of the parking spaces.

3. PHASES OF WORK ______________________________

A. This project will not be phased but coordination with the facility occupant must be maintained as to limit ongoing mission impacts.

4. TECHNICAL SUBMITTALS _________________ TYPE

A. Grading/pipe Plan w/ Elevations Drawings B. Shop Drawings & As-builts Drawings (PDF) C. Materials and Equipment Manufactures Data D. Hazardous Waste Disposal Plan Data

5. ATTACHMENTS ___________________________ PAGES

A. General Conditions 01 -- 11 B. Project Drawings 01 –06 C. New Drainage Plan image1.jpeg