QASP_-_UAB_Trans_to_NATO_(31_Aug_15).pdf

PDF 222 KB Posted

Attached to
UAB Trans to NATO Federal contract opportunity
Solicitation number
FA568515R0010
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 2 - Quality Assurance Surveillance Plan for UAB Trans

View the file

Other files for this federal contract opportunity

Other files attached to UAB Trans to NATO, newest first.
File Type Posted
FA5685-15-R-0010-0002_Questions_and_Answers.pdf PDF
FA5685-15-R-0010-0001_PWS_Revision.pdf PDF
PWS_-_UAB_Trans_to_NATO_(04_Sep_15).pdf PDF
FA5685-15-R-0010_UAB_Trans.pdf PDF
PWS_-_UAB_Trans_to_NATO_(31_Aug_15).pdf PDF
FA5685-15-R-0010_UAB_Trans.pdf PDF
Past_Performance_Questionaire.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

UNACCOMPANIED BAGGAGE (UAB)

TRANSPORTATION

31 August 2015 Incirlik AB, Turkey

TABLE OF CONTENTS

1 INTRODUCTION

1.1 Purpose

1.2 Performance Management Approach

1.3 Performance Management Strategy

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

2.2 The Contracting Officer’s Technical Representative

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

4.2 Customer Feedback

4.3 Acceptable Quality Levels

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

5.2 Monitoring Forms

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.2 Reporting

6.3 Reviews and Resolution

ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY

ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the

Performance Work Statement (PWS) entitled Unaccompanied Baggage (UAB) Transportation. This plan sets forth the procedures and guidelines Detachment 4, 2d Air Postal Squadron will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the

PWS and the contractor’s Quality Control Plan (QCP), and to ensure that the government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the Integrated Project Team

(IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by Detachment 4 to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.2.2 Performance management represents a significant shift from the more traditional Quality

Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own Quality Control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the

PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

2.1 The Contracting Officer

The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the

“Contracting Officer's Representative (COR)" and the contractor. The CO will designate one full-time

COR/COTR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.

2.2 The Contracting Officer’s Representative

The Contracting Officer’s Representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the

CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY

LEVELS

The required performance standards and/or quality levels are included in the PWS. If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:

Random monitoring, which shall be performed by the COR designated inspector.

100% Inspection – Each month, the COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.

Periodic Inspection – COR typically performs the periodic inspection on a monthly basis.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to Detachment 4, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint

Investigation, identified in Attachment 3.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

The Acceptable Quality Levels (AQLs) included in Attachment 1, Services Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed. For certain critical activities such as those involving the tin band security seal, the desired performance level is established at zero (0) defects. Other levels of performance are keyed to the relative importance of the task to the overall mission performance Detachment 4 Air Postal Squadron.

5 QUALITY ASSURANCE DOCUMENTATION

5.1 The Performance Management Feedback Loop

The performance management feedback loop begins with the communication of expected outcomes.

Performance standards are expressed in the PWS and assessed using the performance monitoring techniques shown in Attachment 1.

5.2 Monitoring Forms

The government’s QA surveillance, accomplished by the COR will be reported using the monitoring forms in Attachments 2 and 3. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results and acceptable quality levels are being achieved.

5.2.1 The COR, and CO will retain a copy of all completed QA surveillance forms.

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.

6.2 Reporting

6.2.1 At the end of each month, the COR, will prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.

6.3 Reviews and Resolution

6.3.1 The CO may require the contractor’s project manager, or a designated alternate, to meet with the

CO, COR, and any other applicable government personnel as deemed necessary to discuss performance evaluation. The CO, will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR, and CO, as often as required or per the contractor’s request. The agenda of the reviews may include:

Monthly performance assessment data and trend analysis

Issues and concerns of both parties

Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

Recommendations for improved efficiency and/or effectiveness

6.3.2 The CO and contractor should jointly formulate tactical and long-term courses of action.

Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.

Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the CO.

ATTACHMENT 1: SERVICE DELIVERY SUMMARY

Item Performance Objective PWS

Para.

Performance

Threshold

Surveillance

Method

Frequency

1 Arrive at each location

NLT the times specified in PWS on the days specified.

1.1.1., 1.1.2., and 1.1.3.

No more than 3 defects/month

100%

Inspection &

Customer

Feedback

Monthly

2 Depart each location

NLT the times specified in PWS on the days specified.

1.1.1., 1.1.2., and 1.1.3.

No more than 3 defects/month

100%

Inspection &

Customer

Feedback

Monthly

3 Vehicle compartment is clean and dry at all times.

1.1.5.1. No more than 3

defects/month

100%

Inspection &

Customer

Feedback

Monthly

4 Tin band seal is locked upon arrival and matches the manifest.

1.1.5.2. No more than 0

defects/month

100%

Inspection &

Customer

Feedback

Monthly

5 Confirmation of the specific location and status of all deliveries within ten (10) minutes of notification.

1.1.5.3. No more than 0

defects/month

100%

Inspection&

Customer

Feedback

Monthly

ATTACHMENT 2: SAMPLE QUALITY ASSURANCE

MONITORING FORM

Surveillance Assessment Report TO: Service Contract Manager, TMC FROM: Quality Assurance Evaluator, PWCS Manager

Contract Employee’s Name’s

Contract

Periods of Observation

Location (bldg, area, etc.)

Contractor

The government will perform periodic surveillance to verify Contractor compliance with the following performance objectives. Surveillance Assessment Report will be completed on a monthly basis or as required

Monthly SDS 1, Arrive at Incirlik AB NLT 0800 on the days specified. Rating

REMARKS:

Monthly SDS 2, Depart Incirlik AB NLT 1600 on the days specified. Rating

Monthly SDS 3, Vehicle compartment is clean and dry at all times. Rating

Monthly SDS 4, Tin band seal is locked upon arrival and matches the manifest. Rating

FIRST MI. LAST , Rank, USAF

Contracting Officer’s Representative

File details come from the government source that posted it. Updated .