ATTACHMENT 1

BASE APPEARANCE STANDARDS

FOR

CONSTRUCTION PROJECTS

ON

INCIRLIK AIR BASE, TURKEY

(39th AIR BASE WING)

ROADS AND GROUNDS IDIQ ATTACHMENT 9 FA5685-10-R-0002

randall.cummings Sticky Note MigrationConfirmed set by randall.cummings randall.cummings Sticky Note MigrationConfirmed set by randall.cummings

CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

PART 1-GENERAL

1.1. Construction sites shall be operated and maintained according to these specifications, and are subject to inspection and enforcement according to all Incirlik Air Base and local codes/regulations. The following individuals are authorized to inspect contractor construction sites, and enforce the standards contained in these specifications: contracting officer, contracting administrator, and construction management inspector. All contractor construction projects with performance periods greater than 60 days are authorized a “staging” area adjacent to their con-struction sites providing such a space is available at that time. Contractor shall provide his/her own security for the area. The storage area shall be kept in a safe, neat, and orderly manner at all times.

1.2. Construction Area Screening: All project staging areas, construction sites, and storage areas shall be securely fenced around the entire perimeter of the job site. Fencing (min 2m in height) shall be completely secured at top and bottom to prevent unauthorized vehicle and pede-strian access. Fences shall be screened with opaque screening material to prevent visibility of the fenced area - in areas where material storage, contractor work trailers, trash containers, and any debris that may be collected as a result of the construction. Fences and screens shall be ade-quately staked and/or anchored to prevent blowing over or coming loose during high wind condi-tions. Security fences shall be erected and maintained by the contractor at his/her own expense.

The Contractor shall replace or repair in a timely manner, as determined by base CE, all fences and screening sections that have damage or develop unsightly rips or holes. Upon completion of the contract, security fences shall be removed from the base, by the contractor, prior to final payment. Contractor shall submit photos or samples of the screening material for approval by 39 CES/CECEC prior to installation. See Attachment 1 for Construction Site Screening Standards.

1.3. Project Signs: The contractor shall furnish a project sign on site in accordance with the attached drawing (see Attachment 2). Sizes shown are nominal. Sign shall be 60cm tall by 120cm wide by 2mm thick enamel painted sheet metal. The sign shall be constructed of good sound materials suitable for the purpose. The sign, and posts if used, shall be given one prime coat and two finish coats of gloss exterior-type enamel paint, Blue (RAL 5010). All lettering shall be as shown on the attached drawing, and shall be of gloss exterior-type enamel paint, White (RAL 9003). The sign shall be erected at the designated location, by the contracting offic-er or designated representative, and shall be maintained in good condition by the contractor until completion of the contract. The sign shall remain the property of the contractor and shall be re-moved from the site upon final inspection and acceptance of the facility, equipment, or infra-structure. Contractor identification and logo shall be allowed only on this sign and nowhere else on the exterior of the job site, with the exception of company vehicles. There should be no signs for the purpose of advertising anywhere on the site. Contractors shall submit a sign proposal to CE for approval. Contractor shall be required to modify their project sign whenever CE sign standards are revised.

1.4. Job Site Mobilization: The contractor shall submit a proposal to base CE diagramming their construction site and all material storage areas in locations separate from a construction site.

The contractor shall submit this plan 14 calendar days prior to the start of construction. Material mobilization and construction execution can not begin until the plan has been approved by the base. Jobsite utility connections are the responsibility of the contractor and shall be coordinated through base CE. Temporary overhead utility runs are prohibited. Contractor shall include a plan for supplying required utilities to their site in their proposal.

1.5. Hazmat/Hazwaste Housekeeping: Prior to bringing any hazardous material onto the base, the contractor must contact base CE to coordinate the storage and handling of all hazardous mate-rials. Contractor is responsible for complying with all applicable environmental regulations and laws pertaining to the storage, handling, and transportation of hazardous materials and hazardous waste.

1.6. Preservation of Existing Conditions: The contractor shall preserve and protect all struc-tures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the construc-tion work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. Unless designated for removal, the contractor shall take ap-propriate measures to prevent injury to plants and subsurface irrigation systems on the project site. The contractor shall not remove or prune any plants or trees without approval and authori-zation by 39 CES/CECV to do so, and shall avoid damaging vegetation that will remain in place.

If any limbs or branches of trees are broken during contract performance, or by the careless oper-ation of equipment, or by workmen, the contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound. Plants that are damaged during con-struction shall be replaced at no expense to the government with a one-year warranty. Damaged shrubs or hedges shall be replaced with plants of equal size, type, and value. Any subsurface ir-rigation system damaged by the contractor shall be repaired at no expense to the government.

The contractor shall return all areas disturbed during construction to their original condition.

1.7. Noise Control: The contractor shall comply with all applicable country, local, and instal-lation laws, ordinances, and regulations relative to noise control, to include applicable quiet hours exclusive to Incirlik Air Base. Approved weekend work will not start before 0900.

1.8. Parking: Contractor and contractor’s employees, including subcontractors, shall obey all traffic laws on the installation. Contractor vehicles and equipment shall only be parked in legal-ly designated locations, or within the fence line of the construction site or lay down areas. Every effort must be made to avoid parking vehicles or heavy equipment where it can be easily ob-served by the public. The contractor shall not park outside the construction zone unless ap-proved through base CE. The contractor shall clearly identify their vehicles through the use of company logos or signs on their vehicles. Contractor shall not park or run vehicles on grass areas; only equipment required in direct performance of the work shall be permitted to enter grass areas. Any damage done to lawns or shrubs shall be repaired or replaced by the contractor at no additional cost to the government. At certain facilities/locations, the contractor may be re-quired to load or off-load material and equipment and park elsewhere.

2. OFFICE TRAILERS AND STORAGE UNITS

2.1. Office Trailer: The contractor shall request 39 CES/CECEC’s approval for siting and placing an office trailer at the project construction site. Any office trailer shall be no more than 10’ x 32’ in size, and if it is not obscured and hidden by the opaque fencing material, then it shall be provided in like new condition, with a skirt on all sides, and painted White in color, or an equivalent color of similar tone approved by 39 CES/CECEC. Office trailers in need of painting and/or repairs, or that are in an unsightly condition will not be allowed at the project construction site. A nameplate, no greater than 0.5 meters x 0.5 meters in size, shall be displayed on the exte-rior of all trailers which lists the name of the contractor’s company, contract number, project number and title, contractor’s point(s) of contact (POCs), telephone number(s) where he/she can be reached, and the date the trailer was placed at the job site.

2.2. Storage Units: The contractor shall not bring any storage units, CONEX boxes, or dump-sters to the job site without 39 CES/CECEC’s approval. Storage containers will be in like new condition, and painted a color which coordinates with the base architectural plan and is approved by base CE, if it is not hidden by the opaque fencing material. Contractor shall display a namep-late on the exterior of all storage units with the name of the contractor’s company, the contrac-tor’s point(s) of contact (POC) and telephone number where they can be reached. Storage of ma-terials at the work site is at the contractor’s risk. The use of private security guards on a job site shall be coordinated with base Security Forces and approved by the installation commander. The Contractor shall not use any area(s) for material or equipment storage that has not been approved by base CE. Contractor shall display a nameplate, no greater than 0.5 meters x 0.5 meters in size, on the exterior of all storage units with the name of the contractor’s company, contract number, project number and title, contractor’s POCs, telephone number(s) where he/she can be reached, and the date the unit was placed at the job site.

2.3. On-Site Storage: Storage of materials at the work site is at the contractor’s risk. Any fencing or utility hookups required are the sole responsibility of the contractor. Contractor fenc-ing shall be neat, plumb, level, and tightly constructed. The storage and work areas shall be kept orderly, and the grass within the fenced area or adjacent to the buildings, and ten meters beyond either or both, shall never exceed 10cm in height. Any building or storage shed brought on base shall be like new. Contractor shall vacate and restore to original condition storage areas at indi-vidual construction sites prior to final acceptance. Availability and size of material staging area shall be restricted as noted on the contract documents or as approved by 39 CES/CECEC. The contractor shall consolidate all bulk and/or large quantities of materials at the construction site in area(s) approved by the 39 CES/CECEC. All such items shall be stored neatly grouped together.

Bulky or unsightly construction materials, construction equipment, and tanks shall not be deli-vered to, or stored on, the construction site for any period longer than seven calendar days prior to installation or use. The contractor shall store all supplies and equipment on the project site so as to preclude theft or damage. Protection and security for materials and equipment on site is the sole responsibility of the contractor. The contractor shall not use any area for material or equip-ment storage that has not been approved by the 39 CES/CECEC.

2.4. Sanitary Facilities: The contractor shall provide adequate and properly enclosed tempo-rary toilet facilities for the use of employees at the construction site. These facilities shall be maintained in a clean and sanitary condition, shall be fly proof, and shall be emptied at least once per week, cleaned with an approved janitorial sanitizing solution after emptying, deodorized after cleaning, and repaired as necessary. Increased frequency of emptying, cleaning, and deodorizing shall be as appropriate. Facilities shall be located at least 50 meters from existing buildings un-less they can be located over a sanitary sewer manhole. Upon completion of the work, the con-tractor shall remove the temporary toilet facilities and leave the premises clean and sanitary. All cost incurred in connection with these sanitary facilities shall be included in the contract price.

3. HOUSEKEEPING AND SITE CLEANUP

3.1. The contractor shall perform normal housekeeping functions inside and outside contrac-tor facilities and construction sites. Such functions include grounds maintenance, sweeping, mopping, dusting, disposal of accumulated waste materials and rubbish, and other operations ne-cessary to present a neat appearance at all times. Grass within the construction sites and material storage areas shall never exceed 10 cm in height. All rubbish and waste materials (whether blown in or contractor generated) shall be removed daily, and shall be placed in contractor furnished containers. The contractor shall not dump refuse from any project in government dumpsters. If the contracting officer or construction management inspector discovers contractor refuse in gov-ernment dumpsters, they may instruct the contractor to immediately remove the refuse, or have government resources remove it at the contractor’s expense. As required, contractor generated refuse and waste shall be hauled from the construction site daily, to a disposal area to be selected by the contractor located outside the physical boundaries of the installation (Air Base). The con-tractor shall provide a haul route plan for approval by 39 CES/CECEC. During construction, contractor shall maintain all areas in a neat and orderly manner. Contractor shall clean keep the construction site and/or structure of all construction trash, trash generated by employees, debris, and/or demolished building materials, combustible waste material, and/or dust daily or more fre-quently as necessary for safe operations. During the laying of asphalt roads, streets and/or park-ing surfaces soiled by residual asphalt shall be cleaned daily. The contractor shall treat with lime entrances and exits to asphalt work sites at his/her own expense. Contractor shall ensure all light or moderate weight debris at the construction site is properly secured in waste receptacles so that it does not blow to another area or onto the airfield. Contractor shall remove temporary mate-rials, equipment, services, and construction off the base prior to final payment. Contractor shall clean and repair damage caused by installation or use of temporary facilities, and restore existing facilities used during construction to their original or specified condition. If the contracting of-ficer or construction management inspector deems the project site is unsafe or unsightly, the con-tractor may be instructed to halt construction and clean up the site.

4. TRUCKING AND ROADS

4.1. The contractor shall provide a haul route plan for approval by base CE. Trucks loaded with loose material that can create dust, debris, or falling hazards shall be secured and covered.

Fasten suitable cover, such as tarpaulin, over the load before entering surrounding streets. The contractor is solely responsible for spillage from his/her vehicles, and such spillage shall be cleaned up immediately; the contractor shall bear the monetary responsibility to repair all damage associated with falling debris. All roads shall be maintained free of debris at all times. The Con-tractor is responsible for ensuring all haul routes and site access areas are maintained in a clean and orderly fashion, free from mud, debris and clutter at all times. For the duration of this con-tract and on a daily basis, the contractor shall remove from all base roads and/or streets asphalt, mud, soil, rocks, trash, and debris that result from his/her construction operation on base. As an additional measure, contractor may construct a water-filled tire cleaner in the construction drive-way, where it connects to the base roadway, to prevent from tracking mud onto the base road-ways. All roads and/or streets affected shall be cleaned before close of business on the particular day affected. In the case of asphalt, roads shall be cleaned and/or treated with lime immediately.

Special consideration must be given to haul routes that cross active taxiways. No amount of de-bris at these locations shall be tolerated. The contractor shall sweep these areas continuously as long as material deliveries are being made. Taxiways, runways, parking aprons, and hard surfac-es, used as access to the work or staging areas, shall be kept clean at all times.

5. EXCAVATIONS

5.1. Every trench/excavation shall be returned to its original condition within five days of the original excavation; this may be extended to 30 days if approved by the base CE. Contractor shall phase trenching and excavation operations in order to comply. At minimum, contractor shall restore the site to pre-excavation conditions. Base policy prohibits trenching trough road-ways; therefore, utilities crossing roadways shall be achieved using a bore technique. If boring can not meet the requirements and specifications of the project, the contractor shall submit a Re-quest-For-Information (RFI) to the Contracting Officer recommending alternate solutions for consideration and approval. All soil stockpiles shall be hidden from view to the maximum extent possible. Prior approval by base CE is required if soil stockpiles are to remain exposed for long periods of time. Dust control measures are the responsibility of the Contractor and shall be im-plemented as directed by base CE. All road cuts must be approved by base CE prior to execu-tion.

6. LAWN MAINTENANCE

6.1. Grassy areas disturbed by any type of construction work including storage, equipment staging, and material delivery areas shall be seeded, and covered with one inch of sand to prevent birds from eating. Contractor shall be responsible for the successful growth and maintenance of all seeded areas for a period of one hundred eighty days or three mowings after final acceptance of the work – whichever is longer. All grass, shrubbery, and ornamental plants fenced by the construction site shall be maintained to base standards by the contractor.

7. SAFETY

7.1. Safety Barriers and Signs: Contractor shall be solely responsible for furnishing, erecting, maintaining, and removing all protective barriers, scaffolding, fall protection equipment, signs, temporary lighting, etc., required for protection of persons and property. All equipment shall be in a good condition and appearance. Contractor shall provide barriers as required to prevent pub-lic entry into construction areas and to protect existing facilities and adjacent properties from damage from construction operations. Contractor shall provide barricades, traffic control signs, and construction safety signs that meet installation standards and comply with Turkish and US traffic laws. Actual location, size, and final arrangement of these items shall be discussed and approved by 39 CES/CECEC prior to installation. Such approved items shall be of uniform size, design, and color. All cones, barricades, warning lights, temporary signs, and protective devices shall conform to the current requirements of the Manual of Uniform Traffic Control Devices for

Streets and Highways (MUTCD) and the US Army Corps of Engineers Safety and Health Re-quirements Manual EM 385-1-1. No open flame devices of any type shall be permitted.

7.2. Equipment/Material Weather Protection: Contractor shall take all necessary precautions to protect the work and materials, including government-furnished materials and equipment (GFM/GFE) from damage or loss. Contractor shall have on hand at the jobsite all tarpaulins or other necessary equipment prior to commencing any work that would expose the building occu-pants, materials, and/or equipment to rain, wind, and other elements of nature. Tarpaulins when required will not be light weight plastic sheets, but shall be of a gauge heavy enough to assure that no rain accumulation that would weigh greater than the tarpaulin’s ability to deter buckling and allowing water to enter into or onto the protected area. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, removing tools and equipment from exposed locations, removing or securing scaffolding and other temporary work, and cover-ing exposed work and setting a watchman as necessary to remove all accumulated water to keep it from entering the facilities and causing damage. Contractor shall not leave equipment/material on any roof (or tower) unless prior approval has been obtained from the contracting officer. Con-tractor shall be solely responsible for damage due to negligence as determined by industry stan-dards and the contracting officer.

7.3. Equipment/Material Security: Store equipment that is removed in performance of work where directed or reuse in work as required by drawings and specifications. Equipment tempora-rily removed shall be protected, cleaned, and replaced equal to or better than its condition prior to starting work. Security for equipment or material that is to be reused and is removed for tempo-rary storage shall be the sole responsibility of the contractor.

8. FINAL INSPECTION AND ACCEPTANCE SITE STANDARDS

8.1. Lawn Establishment: Within seven workdays of actual completion of work at contract site, the contractor shall prepare all disturbed areas inside and outside of the fenced site surround-ing site for seeding as provided in contract specifications. Contractor shall restore the site to a condition and appearance equal to or better than existing before the work occurred. Such restora-tion work shall not be considered complete until approved by the 39 CES/CECEC.

8.2. Construction Site Restoration: All contractor owned items such as, but not limited to, stakes, traffic/safety cones, barriers, warning tape, and erosion control fences that are erected during construction, shall be removed entirely after completion of project and within five days of government acceptance of the project site. The contractor, at his own expense, shall return to the site to remove any items left at or near the project site after this time period. All trailers, equip-ment/storage units, and residual construction materials shall be removed, also within five days of government acceptance of the project site.

THIS PAGE INTENTIONALY LEFT BLANK

PROJECT SIGN

U.S. AIR FORCE PROJECT

BASE CIVIL ENGINEERING

FIELD MAINTENANCE

HANGAR

GENERAL CONTRACTOR ARCHITECT-ENGINEER

JAMES SMITH JOHN DOE

PLANNED COMPLETION DATE:

Space Height Line Description Letter Height

Stroke

A 102 mm (4 in)

1 U.S. AIR FORCE PROJECT 38 mm (1.5 in)

5 mm (0.1875 in)

B 102 mm (4 in)

2 BASE CIVIL ENGINEERING 38 mm (1.5 in)

5 mm (0.1875 in)

C 127 mm (5 in)

3 PROJECT NAME 102 mm (4 in)

13 mm (0.5 in)

D 76 mm (3 in)

4 PROJECT NAME CONT’D (IF REQUIRED) 102 mm (4 in)

13 mm (0.5 in)

E 127 mm (5 in)

5 GENERAL CONTRACTOR/A-E 38 mm (1.5 in)

5 mm (0.1875 in)

F 25 mm (1 in)

6 GENERAL CONTRACTOR/A-E 38 mm (1.5 in)

5 mm (0.1875 in)

G 102 mm (4 in)

7 PLANNED COMPLETION DATE 63 mm (2.5 in)

6 mm (0.25 in)

H 102 mm (4 in)

FIGURE - 1: CONSTRUCTION SIGN

39 CES Construction Site Screening Standard

B

2.44 meters (8 feet)

1.

m et er s

(4 fe et

A

C

D

E

F

G

H

(Attachment 1)

- Not able to see through -- must block 80% or more when viewed from perpendicular angle**

- Dark Green in color -- Alternate colors must be explicitly approved by submitting a material sample at least 2 weeks prior to fence installation

- Fabric must be attached securely to prevent coming loose or tearing in wind.

- Fabric must be pulled taut and attached squarely for neat appearance

- Fence must be securely braced against wind

(Continued)

- Fabric is preferred to run uninterrupted the length of fence, except for authorized gates

- In situations where site access is difficult and individual fence sections are required to be mov-able, it is acceptable to attach fabric to individual fence sections

- Screen gates except where safety requires otherwise

- Post a single contractor identification sign at construction site gate outside of fabric, no larger than 1 square meter in size

- Fence posts may be driven into ground; site must be returned to original condition at end of project -- Fence posts may not be driven into pavement without the prior approval of BCE; if approved, pavement must be returned to original condition at end of project

- Fence must maintained a neat appearance for duration of project; repair damaged fabric imme-diately, keep fence in straight line with all sections vertically aligned

39 CES Construction Site Screening Standard (continued)

Sign

(Continued)

Examples of unacceptable fence appearance:

Note contractor containers do not meet standard color requirements

Poorly attached and frayed material has unprofessional appearance

Fence sections not maintained neatly -- unprofessional appearance

Screening material can be easily seen through and adds little value

Other files for this federal contract opportunity

Other files attached to Roads and Grounds Indefinite Delivery/Indefinite Quantity (ID/IQ), newest first.
File Type Posted
Amendment 0002 FA5685-10-R-0002.doc DOC document
Updated IDIQ bid schedule UNTABULATED.xls XLS spreadsheet
C1-C2-C3.dwg DWG drawing
TITLE.DWG DWG drawing
C1-C2-C3.dwg DWG drawing
COVER.dwg DWG drawing
21c21.dwg DWG drawing
19c19.dwg DWG drawing
17c17.dwg DWG drawing
11c11.dwg DWG drawing
2c2.dwg DWG drawing
18c18.dwg DWG drawing
31c31.dwg DWG drawing
28c28.dwg DWG drawing
1c1.dwg DWG drawing
16c16.dwg DWG drawing
26c26.dwg DWG drawing
12c12.dwg DWG drawing
10c10.dwg DWG drawing
7c7.dwg DWG drawing
41c41.dwg DWG drawing
Section J Atch 2 2c2 —
Section J Atch 2 15c15 —
Section J Atch 2 23c23 —
Section J Atch 2 21c21 —
Section J Atch 2 20c20 —
Section J Atch 2 42c42 —
Section J Atch 2 39c39 —
Section J Atch 2 40c40 —
Section J Atch 2 25c25 —
Section J Atch 2 8c8 —
Section J Atch 2 7c7 —
Section J Atch 2 18c18 —
Section J Atch 2 19c19 —
Atch 5 INC 1101 —
Atch 2 C3 —
Atch 4 INC-1106 —
Atch 2 C3 —
Atch 2 C3 —
Atch 2 TITLE —
Atch 2 C1 —
Atch 3 INC 1101 —
Atch 2 C5 —
Atch 5 INC 1101 —
Section J Atch 5 - IDIQ bid schedule UNTABULATED —
FA5685-10-R-0002.doc DOC document
Section J Atch 10 Past Performance Questionaire —
Section J Atch 8 Duty Plan... —
Section J Atch 1 Specifications —
ROADS GROUNDS IDIQ SPECS.pdf PDF
Show all 50

Roads and Grounds Indefinite Delivery/Indefinite Quantity (ID/IQ) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .