Updated IDIQ bid schedule UNTABULATED.xls
XLS spreadsheet 322 KB Posted
- Attached to
- Roads and Grounds Indefinite Delivery/Indefinite Quantity (ID/IQ) Federal contract opportunity
- Solicitation number
- FA5685-10-R-0002
About this file
Updated IDIQ bid schedule UNTABULATED which will posted with forthcoming Amendment 0002 to be posted on 24 March 2010.
View the file
Other files for this federal contract opportunity
Show all 50
Roads and Grounds Indefinite Delivery/Indefinite Quantity (ID/IQ) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASIC
| BID SCHEDULE | |||||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2nd Opt |
Year
| No | |||||
| Demolition | |||||
| 1 | Demolish Unreinforced Concrete up to 15 cm thick, including hauling and disposal | CM | |||
| 2 | Demolish Mesh Reinforced Concrete to 15 cm thick, including hauling and disposal | CM | |||
| 3 | Demolish Rod Reinforced Concrete to 15 cm thick, including hauling and disposal | CM | |||
| 4 | Demolish Unreinforced Concrete (>15 cm thick) including hauling and disposal | CM | |||
| 5 | Demolish Reinforced Concrete (>15 cm thick) including hauling and disposal | CM | |||
| 6 | Demolish Unreinforced Concrete sidewalk including hauling and disposal | CM | |||
| 7 | Demolish Mesh Reinforced Concrete sidewalk including hauling and disposal | CM | |||
| 8 | Demolish Brick Set in mortar sidewalk including hauling, disposal | CM | |||
| 9 | Demolish Unreinforced Concrete Curbs | LM | |||
| 10 | Demolish Reinforced Concrete Curbs | LM | |||
| 11 | Demolish Asphalt Pavement, including base course | CM | |||
| 12 | Demolish asphalt road, asphalt only | CM | |||
| 13 | Clearing and Grubbing | SM | |||
| 14 | RESERVED | ||||
| 15 | RESERVED | ||||
| 16 | RESERVED | ||||
| Earthwork | |||||
| 17 | Excavation by hand | CM | |||
| 18 | Unclassified excavation (Bulk), including concrete, hauling, loading and disposal w/machine | CM | |||
| 19 | Unclassified excavation (Bulk), soil only, hauling, loading and disposal w/machine | CM | |||
| 20 | Trench Excavation by machine | CM | |||
| 21 | Compaction by hand with plate or rammer compactor | CM | |||
| 22 | Compaction by roller | CM | |||
| 23 | Shoring for Trench | SM | |||
| 24 | Provide & Install Select Granular filling including loading, hauling, spread and compaction | CM | |||
| 25 | Provide & Install Select Satisfactory fill includes hauling spread and compaction | CM | |||
| 26 | Provide & Install Lime Treated Subgrade including compaction | CM | |||
| 27 | Furnish and Install Geotextile Filter Fabric, Type D-3 | SM | |||
| 28 | Provide & Install Graded Crush Aggregate Base Course, including loading, hauling, spread | CM | |||
| 29 | Furnish&install sand c/w tamping | CM | |||
| 30 | Construct stone paver not including excavation, base & sand | SM | |||
| 31 | Grading (by/machine) c/w fill & compaction | CM | |||
| 32 | Grading (by/hand) c/w fill & compaction | CM | |||
| 33 | Subgrade c/w compaction by sheepsfoot roller | SM | |||
| 34 | Provide & Install Top Soil | CM | |||
| 35 | Provide & Install Plant Mix, including loading, hauling, spread with asphalt paver and compaction | CM | |||
| 36 | RESERVED | ||||
| 37 | RESERVED | ||||
| 38 | RESERVED | ||||
| 39 | RESERVED | ||||
| 40 | RESERVED | ||||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Flexible Pavement | |||||
| 41 | Provide & Install Type II Asphalt Binder Course | CM | |||
| 42 | Provide & Install Type III Asphalt Surface Course | CM | |||
| 43 | Provide & Install Primer Coat (MC30) | TON | |||
| 44 | Provide & Install Tack Coat | TON | |||
| 45 | Mill Existing Asphalt Pavement | CM | |||
| 46 | Joint/Crack Sealing (3-8 mm wide) | LM | |||
| 47 | Joint/Crack Sealing (8-19 mm wide) | LM | |||
| 48 | Patch Repair (partial depth) | SM | |||
| 49 | Patch Repair (full depth) | SM | |||
| 50 | Rejuvenator (Gilsonite Based) | SM | |||
| 51 | Provide & Install Slurry Seal | SM | |||
| 52 | Provide & Install Surface Seal Emulsion (Fog Seal) | SM | |||
| 53 | Provide & Install Cold Mix Asphalt | TON | |||
| 54 | Provide & Install Seal Coating | SM | |||
| 55 | RESERVED | ||||
| 56 | RESERVED | ||||
| Rigid Pavement Concrete Work | |||||
| 57 | Provide & Install Formwork, wood | SM | |||
| 58 | Provide & Install Formwork, steel, 15-20 cm wide, two side, 1m=15 kg | KG | |||
| 59 | Provide & Install Formwork, steel, 20 cm wide, one side, 1m=8-9 kg | KG | |||
| 60 | Provide & Install BS 18 Plain Concrete | CM | |||
| 61 | Provide & Install BS 20 Plain Concrete | CM | |||
| 62 | Provide & Install BS 25 Plain Concrete | CM | |||
| 63 | Provide & Install BS 30 Plain Concrete | CM | |||
| 64 | Provide & Install BS 35 Plain Concrete | CM | |||
| 65 | Provide & Install BS 40 Plain Concrete | CM | |||
| 66 | Furnish and Install Wire Mesh | TON | |||
| 67 | Furnish & Install various size steel (smooth & deformed) , dowel bars c/w greased & paint | TON | |||
| 68 | Furnish & Install various size steel (smooth & deformed) reinforcing bars | TON | |||
| 69 | Provide and Apply Concrete Curing Compound | SM | |||
| 70 | Provide and Apply Burlap Curing Material | SM | |||
| 71 | Provide and Apply Clear Coating to Concrete (Sikagard 680S, or equiv.) | SM | |||
| 72 | Sawcut Contraction Joints | LM | |||
| 73 | Provide and Install 10 mm Preformed Contraction Joint (Zip Strip, or equivalent) | LM | |||
| 74 | Provide and Install 10 mm Preformed Cellulose Fiber Const./Expansion Joint Filler | LM | |||
| 75 | Remove Existing Joint Sealer and Material | LM | |||
| 76 | Clean, Sand Blast, and Prime Coat Joint | LM | |||
| 77 | Provide and Install 14 mm Preformed Elastomeric Compression Seal | LM | |||
| 78 | Provide and Install Joint Sealers (Sikaflex 2B, or equiv.), c/w Bond Breaker Rod | LM | |||
| 79 | Provide and Install Joint Sealers (Sikaflex 2B, or equiv.), c/w Tape Bond Breaker | LM | |||
| 80 | Furnish and Install 0.25mm thick Polyethylene Sheeting | SM | |||
| 81 | Concrete Crack Repair c/w routering and joint seal | LM | |||
| 82 | Concrete Spall Repair | SM | |||
| 83 | Full Depth Repair, c/w dowels | SM | |||
| 84 | Failed Key Repair | LM | |||
| 85 | RESERVED | ||||
| 86 | RESERVED | ||||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Manhole Covers and Catch Basin Gratings | |||||
| 87 | Furnish and Install 768x768 mm catch basin c/w frame (85 kg) | EA | |||
| 88 | Furnish and Install 804x804 mm catch basin c/w frame (150 kg) | EA | |||
| 89 | Furnish and Install 800 mm diameter catch basin c/w frame (150 kg) | EA | |||
| 90 | Furnish and Install 760x610 mm catch basin c/w frame (181 kg) | EA | |||
| 91 | Furnish and Install 450x610 mm catch basin c/w frame (105 kg) | EA | |||
| 92 | Furnish and Install 760x760 mm manhole cover (76 kg) | EA | |||
| 93 | Furnish and Install 804x804 mm manhole cover (148 kg) | EA | |||
| 94 | Furnish and Install 800x1010 mm manhole cover (180 kg) | EA | |||
| 95 | Furnish and Install 800 mm diameter manhole cover (85 kg) | EA | |||
| 96 | Furnish and Install 800 mm diameter manhole cover (145 kg) | EA | |||
| 97 | Provide & Install Ductile Iron Extra Heavy Duty Manhole Cover (800mm diameter) for Airfield c/w Frame (150 kg) | EA | |||
| 98 | Provide & Install Ductile Iron Extra Heavy Duty Manhole Cover (1000mm*1100mm diameter) for Airfield c/w Frame (300 kg) | EA | |||
| 99 | Provide and Install Lockable Type manhole cover (East Jordan Iron Works or equal) | EA | |||
| 100 | Provide and Install Lockable Type handhole cover (East Jordan Iron Works or equal) | EA | |||
| 101 | RESERVED | ||||
| 102 | RESERVED | ||||
| Traffic Striping and Pavement Markings | |||||
| 103 | Install Thermoplastic Paint Stripe | SM | |||
| 104 | Install one Reactive Component Paint Stripe, (KANAT PAINT , KANTEX 64710) | SM | |||
| 105 | Install 2 mm thick two Reactive Component Paint Stripe | SM | |||
| 106 | Install Pavement Symbol, 0.46 m2 two reactive comp. | EA | |||
| 107 | Install Pavement Message (ONLY), 2.0 m2 thermoplastic | EA | |||
| 108 | Install Pavement Left Arrow, 1.51 m2 thermoplastic | EA | |||
| 109 | Remove & dispose Lead based paint marking, PEEL AWAY or equal | SM | |||
| 110 | Remove Traffic Markings with high pressure water | SM | |||
| 111 | Provide metal template consist of 32 letters 1.55mm * 1.55m | EA | |||
| 112 | Provide & Install handicapped symbol template and paint | EA | |||
| 113 | Rubber removal by hand with high pressure water | SM | |||
| 114 | Rubber removal by machine, UNIMOG or equal | SM | |||
| 115 | Provide and Apply 2mm thick, two reactive comp.paint c/w type 1glass beads, by machine | SM | |||
| 116 | Provide and Apply 2mm thick, two reactive comp.paint c/w type 1glass beads, by hand | SM | |||
| 117 | Provide and Apply one reactive comp.paint (KANAT PAINT , KANTEX 64710) c/w type 1glass beads, by machine | SM | |||
| 118 | Provide and Apply one reactive comp.paint (KANAT PAINT , KANTEX 64710) c/w type 1glass beads, by hand | SM | |||
| 119 | Provide & Install raised reflective marker (blue, yellow, or red-colorless) bi-directional (on new pavementsurface)3M or equal | EA | |||
| 120 | Provide & Install raised reflective marker (blue, yellow, or red-colorless) bi-directional (on existing pavementsurface)3M or equal | EA | |||
| 121 | Waterblasting | SM | |||
| 122 | Sandblasting | SM | |||
| 123 | Mechanical Grinding | SM | |||
| 124 | Provide and Install Precast parking stops | EA | |||
| 125 | RESERVED | ||||
| 126 | RESERVED | ||||
| 127 | RESERVED | ||||
| 128 | RESERVED | ||||
| Landscaping (including 3 months maintenance) | |||||
| 129 | Seeding | SM | |||
| 130 | Relocation of existing tree (Height: <=2m) | EA | |||
| 131 | Relocation of existing tree (Height: >2m and <4m) | EA | |||
| 132 | Relocation of existing tree (Height: >=4m) | EA | |||
| 133 | Plant 20 cm diameter washingtonia filifera | EA | |||
| 134 | Plant bouganvilla | EA | |||
| 135 | Hydroseeding | SM | |||
| 136 | Water truck rental c/w pump | DAY | |||
| 137 | Biodynamical seeding | SM | |||
| 138 | Plant Apteniacordiflora | SM | |||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Landscaping (including 3 months maintenance) Continued | |||||
| 139 | Plant Anthemis punctata | SM | |||
| 140 | Plant Aspidistra elatior(30cm.) | EA | |||
| 141 | Plant Agave Americana (40 cm.) | EA | |||
| 142 | Plant Bauhinia Purpurea(2m.) | EA | |||
| 143 | Plant Berberis Thunbergii (50cm.) | EA | |||
| 144 | Plant Crataegus Monogyna (1.5m.) | EA | |||
| 145 | Plant Cortaderia Sellona ( 1 m.) | EA | |||
| 146 | Plant Carpobrotus Edulis | SM | |||
| 147 | Plant Euphorbia Pulcherima (1.2 m.) | EA | |||
| 148 | Plant Hedera Helix (1 m.) | EA | |||
| 149 | Plant Hibiscus Rosa-Sinensis (1.5 m ) | EA | |||
| 150 | Plant Grevillea Robusta ( 2m.) | EA | |||
| 151 | Plant Lagerstromia Indica ( 1.5 m) | EA | |||
| 152 | Plant Jucca Flamentosa ( 80 cm.) | EA | |||
| 153 | Plant Juniperus Sabina ( 30 cm.) | EA | |||
| 154 | Plant Jasminum Nudiflorum ( 1.5 m.) | EA | |||
| 155 | Plant Medicago Arborea ( 1.5 m.) | EA | |||
| 156 | Plant Malvaviscus Penduliflorus(1.2m) | EA | |||
| 157 | Plant Magnolia Grandiflora (2 m.) | EA | |||
| 158 | Plant Pyracantha Coccinea (60 cm.) | EA | |||
| 159 | Plant Parkinsonia Acuelata (1.5m) | EA | |||
| 160 | Plant Pitosporum Tobira (50 cm.) | EA | |||
| 161 | Plant Phoneix Canariensis (1.5m.) | EA | |||
| 162 | Plant Rosmarinus Officinalis (30 cm.) | EA | |||
| 163 | Plant Shinus Molle ( 1.5 m.) | EA | |||
| 164 | Plant Tradescantia Pallida | SM | |||
| 165 | Plant Viburnum Opilus ( 1 m.) | EA | |||
| 166 | Plant Lavendula Angustifolia (15 cm.) | EA | |||
| 167 | Plant Cotaneaster Horizontalis 70 cm. | EA | |||
| 168 | Plant Thuja Orientalis ( 80 cm.) | EA | |||
| 169 | Plant Ligustrum Vulgare ( 50 cm.) | EA | |||
| 170 | Plant Alyssum Maritimum | SM | |||
| 171 | Provide Crane (30 Ton) | Hour | |||
| 172 | RESERVED | ||||
| 173 | RESERVED | ||||
| 174 | RESERVED | ||||
| Miscellaneous | |||||
| 175 | Furnish and Install Removable Bollard c/w paint /w locking mechanism | EA | |||
| 176 | Construct Concrete Bollard Station (2 bollards) | EA | |||
| 177 | Construct Concrete Bollard Station (4 bollards) | EA | |||
| 178 | Construct Concrete Bollard Station (6 bollards) | EA | |||
| 179 | Construct Concrete Bollard Station (8 bollards) | EA | |||
| 180 | Removal of existing bollard, bollard station and bollard holes | EA | |||
| 181 | Removal of existing dragon teeth | EA | |||
| 182 | Provide and install rubber speed bump (width is 60.5 cm) | EA | |||
| 183 | Provide and install concrete speed hump | EA | |||
| 184 | Furnish and Install Aluminum Pipe Handrail (64 mm diam.), c/w anch. bolts, plates | LM | |||
| 185 | Furnish and Install Aluminum Pipe Handrail (38 mm diam.), c/w anch. bolts, plates | LM | |||
| 186 | Adjust Existing Channel Grating to New Pavement Elevation | LM | |||
| 187 | Construct Concrete Parking Bumpers | EA | |||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Miscellaneous Continued | |||||
| 188 | Remove Fence c/w Footing and Post | LM | |||
| 189 | Provide & Apply Epoxy Bonding Compound (QPL Class IV) | LT | |||
| 190 | Provide & Apply Zinc Paint Coating | LT | |||
| 191 | Furnish and Install 45 x 30 cm Handicapped Sign | EA | |||
| 192 | Provide and Install New Reflectorized Traffic Sign | EA | |||
| 193 | Relocate Existing Traffic Sign including concrete foundation | EA | |||
| 194 | Adjust gas valve | EA | |||
| 195 | Adjust Manhole c/w existing ring & cover or grate | EA | |||
| 196 | Adjust manhole c/w new ring & cover or grate | EA | |||
| 197 | Temporary Block Manholes (2 ea) and Provide and Install Temporary Pump c/w piping to existing sewer manhole | LS | |||
| 198 | Adjust Existing Valve Box | EA | |||
| 199 | Provide & Install New Cast Iron Valve Box | EA | |||
| 200 | Demolish Corrugated half Pipe, 1000 mm Dia., No Excavation | LM | |||
| 201 | Relocate Light Pole (<=8m high), includes new conduit and wiring, new pole and foundation, Using Existing Light Fixture | EA | |||
| 202 | Provide and Install Two-way Geogrid | SM | |||
| 203 | Provide and Install Fiberglass Mesh, Glasgrid 8501 | SM | |||
| 204 | Provide and Install Fiberglass Mesh, Glasgrid 8502 | SM | |||
| 205 | Provide and Construct masonry block wall (15 cm thick) c/w reinforcement | SM | |||
| 206 | Provide and Construct masonry block wall (20 cm thick) c/w reinforcement | SM | |||
| 207 | Provide and Apply Primer and Silicon Based Paint | SM | |||
| 208 | Construct AAC Concrete walls c/w reinforced concrete columns and beams | SM | |||
| 209 | Provide & Install 30 cm non-skid Terrazzo Tile | SM | |||
| 210 | Furnish and Install structural steel c/w primer and paint | KG | |||
| 211 | Provide & Install Keystone | SM | |||
| 212 | Construct 30 cm high reinforced concrete AT/FP wall c/w base course, formwork, joint, and joint seal (except excavation) (IAW the detail on page 2 of 44) | LM | |||
| 213 | Provide & Install Precast curb (20 cm high) | LM | |||
| 214 | Provide & Install Precast curb (30 cm high) | LM | |||
| 215 | Provide and Construct Decorative Brick Wall (20cmx20cm) c/w reinforced concrete footing, columns and beams | LM | |||
| 216 | Provide and Construct Brick Wall (8.5cm) | SM | |||
| 217 | Provide and Construct Brick wall (13.5 cm) | SM | |||
| 218 | Provide & Install Brick (40x50 cm) for utility trenches | EA | |||
| 219 | Testing Adjusting Balancing of Potable Water Line | DAY | |||
| 220 | Conduct Pressure&Chlorine Testing of Potable Water Line | EA | |||
| 221 | Conduct Compaction Test | EA | |||
| 222 | Conduct Nuclear Density Test, moisture & compaction | EA | |||
| 223 | Horizontal Boring Including Steel Encasement, < 6" diameter | LM | |||
| 224 | Demolish Cast Iron Pipe w/Lead Gasket Seals, Sewer and Water, No Excavation | LM | |||
| 225 | Provide & Install Temporary Construction Fencing | LM | |||
| 226 | Provide & Install Detectable Tape | LM | |||
| 227 | Conduct Profilograph Test | SM | |||
| 228 | Conduct Deflectometer Test | EA | |||
| 229 | RESERVED | ||||
| 230 | RESERVED | ||||
| 231 | RESERVED | ||||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Storm Drainage, Concrete Pipe, Installed Complete, Not Including Excavation and Backfill | |||||
| 232 | 300 mm RCP | LM | |||
| 233 | 375 mm RCP | LM | |||
| 234 | 400 mm RCP | LM | |||
| 235 | 450 mm RCP | LM | |||
| 236 | 500 mm RCP | LM | |||
| 237 | 600 mm RCP | LM | |||
| 238 | 700 mm RCP | LM | |||
| 239 | 800 mm RCP | LM | |||
| 240 | 900 mm RCP | LM | |||
| 241 | 1000 mm RCP | LM | |||
| 242 | 1200 mm RCP | LM | |||
| 243 | 1400 mm RCP | LM | |||
| 244 | 100X100x100 Precast Reinforced Box Culvert | LM | |||
| 245 | 100X100x150 Precast Reinforced Box Culvert | LM | |||
| 246 | 150X150x100 Precast Reinforced Box Culvert | LM | |||
| 247 | RESERVED | ||||
| 248 | RESERVED | ||||
| 249 | RESERVED | ||||
| Storm Drainage, Perforated PVC Pipe, Installed Complete, Not Including Excavation and Backfill | |||||
| 250 | 80 mm PVC | LM | |||
| 251 | 100 mm PVC | LM | |||
| 252 | 125 mm PVC | LM | |||
| 253 | 150 mm PVC | LM | |||
| 254 | 200 mm PVC | LM | |||
| 255 | 250 mm PVC | LM | |||
| 256 | 300 mm PVC | LM | |||
| 257 | RESERVED | ||||
| 258 | RESERVED | ||||
| 259 | RESERVED | ||||
| Storm Drainage, Corrugated Metal Pipe, Installed Complete, Not Including Excavation and Backfill | |||||
| 260 | 150 mm Corrugated Metal | LM | |||
| 261 | 200 mm Corrugated Metal | LM | |||
| 262 | 250 mm Corrugated Metal | LM | |||
| 263 | 300 mm Corrugated Metal | LM | |||
| 264 | 450 mm Corrugated Metal | LM | |||
| 265 | RESERVED | ||||
| 266 | RESERVED | ||||
| 267 | RESERVED | ||||
| Water Lines, PVC-100 Pressure Pipe, Installed Complete, Not Including Excavation and Backfill | |||||
| 268 | 100 mm 6 ATU PVC Pipe | LM | |||
| 269 | 150 mm 6 ATU PVC Pipe | LM | |||
| 270 | 200 mm 6 ATU PVC pipe | LM | |||
| 271 | 225 mm 6 ATU PVC pipe | LM | |||
| 272 | 250 mm 6 ATU PVC pipe | LM | |||
| 273 | 300 mm 6 ATU PVC Pipe | LM | |||
| 274 | 350 mm 6 ATU PVC Pipe | LM | |||
| 275 | 400 mm 6 ATU PVC Pipe | LM | |||
| 276 | 450 mm 6 ATU PVC Pipe | LM | |||
| 277 | 500 mm 6 ATU PVC Pipe | LM | |||
| 278 | 65 mm 10 ATU PVC Pipe | LM | |||
| 279 | 80 mm 10 ATU PVC Pipe | LM | |||
| 280 | 100 mm 10 ATU PVC Pipe | LM | |||
| 281 | 110 mm 10 ATU PVC Pipe | LM | |||
| 282 | 125 mm 10 ATU PVC Pipe | LM | |||
| 283 | 150 mm 10 ATU PVC Pipe | LM | |||
| 284 | 200 mm 10 ATU PVC Pipe | LM | |||
| 285 | 225 mm 10 ATU PVC Pipe | LM | |||
| 286 | 250 mm 10 ATU PVC Pipe | LM | |||
| 287 | 300 mm 10 ATU PVC Pipe | LM | |||
| 288 | 350 mm 10 ATU PVC Pipe | LM | |||
| 289 | 400 mm 10 ATU PVC Pipe | LM | |||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Water Lines, PVC-100 Pressure Pipe, Installed Complete, Not Including Excavation and Backfill Continued | |||||
| 290 | 450 mm 10 ATU PVC Pipe | LM | |||
| 291 | 500 mm 10 ATU PVC Pipe | LM | |||
| 292 | 100 mm 16 ATU PVC Pipe | LM | |||
| 293 | 125 mm 16 ATU PVC Pipe | LM | |||
| 294 | 150 mm 16 ATU PVC Pipe | LM | |||
| 295 | 200 mm 16 ATU PVC pipe | LM | |||
| 296 | 225 mm 16 ATU PVC pipe | LM | |||
| 297 | 250 mm 16 ATU PVC pipe | LM | |||
| 298 | 300 mm 16 ATU PVC Pipe | LM | |||
| 299 | 315 mm 16 ATU PVC Pipe | LM | |||
| 300 | 350 mm 16 ATU PVC Pipe | LM | |||
| 301 | 400 mm 16 ATU PVC Pipe | LM | |||
| 302 | 80 mm Gasket | EA | |||
| 303 | 100 mm Gasket | EA | |||
| 304 | 125 mm Gasket | EA | |||
| 305 | 150 mm Gasket | EA | |||
| 306 | 200 mm Gasket | EA | |||
| 307 | 225 mm Gasket | EA | |||
| 308 | 250 mm Gasket | EA | |||
| 309 | 300 mm Gasket | EA | |||
| 310 | 350 mm Gasket | EA | |||
| 311 | 400 mm Gasket | EA | |||
| 312 | 63 mm Sleeve | EA | |||
| 313 | 75 mm Sleeve | EA | |||
| 314 | 90 mm Sleeve | EA | |||
| 315 | 110 mm Sleeve | EA | |||
| 316 | 125 mm Sleeve | EA | |||
| 317 | 140 mm Sleeve | EA | |||
| 318 | 160 mm Sleeve | EA | |||
| 319 | 200 mm Sleeve | EA | |||
| 320 | 225 mm 16 ATU PVC Elbow | EA | |||
| 321 | 315 mm 16 ATU PVC Elbow | EA | |||
| 322 | 225 mm 16 ATU PVC Sleep Joint | EA | |||
| 323 | 315 mm 16 ATU PVC Sleep Joint | EA | |||
| 324 | 225 mm cast iron 16 ATU E type fitting material | EA | |||
| 325 | 315 mm cast iron 16 ATU E type fitting material | EA | |||
| 326 | 160mm TEE | EA | |||
| 327 | 200mm TEE | EA | |||
| 328 | 250mm TEE | EA | |||
| 329 | 315mm TEE | EA | |||
| 330 | 160mm Elbow | EA | |||
| 331 | 200mm Elbow | EA | |||
| 332 | 250mm Elbow | EA | |||
| 333 | 315mm Elbow | EA | |||
| 334 | 160mm Gate Valve | EA | |||
| 335 | 200mm Gate Valve | EA | |||
| 336 | 250mm Gate Valve | EA | |||
| 337 | 315mm Gate Valve | EA | |||
| 338 | Adjust existing water valve | EA | |||
| 339 | Provide & Install New Fire Hydrant (Dia. 4"), c/w valve, thrust blocks, tap into main | EA | |||
| 340 | Relocate Existing Fire Hydrant, including additional piping, if required | EA | |||
| 341 | Tap into Water Main, using saddle | EA | |||
| 342 | Adjust Existing PVC Water Line Over New Storm Drain Line Not Including Excavation and Backfill | EA | |||
| 343 | Adjust Existing PVC Water Line c/w Steel Sleeve through Manhole, Not Including Excavation and Backfill | EA | |||
| 344 | Piping tie-in connections to existing | EA | |||
| 345 | RESERVED | ||||
| 346 | RESERVED | ||||
| 347 | RESERVED | ||||
| Water Lines, PE-100 (Polyethylene) Pressure Pipe, Installed Complete, Not Including Excavation and Backfill | |||||
| 348 | 32 mm 10 ATU | LM | |||
| 349 | 40 mm 10 ATU | LM | |||
| 350 | 50 mm 10 ATU | LM | |||
| 351 | 63 mm 10 ATU | LM | |||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Water Lines, PE-100 (Polyethylene) Pressure Pipe, Installed Complete, Not Including Excavation and Backfill Continued | |||||
| 352 | 75 mm 10 ATU | LM | |||
| 353 | 90 mm 10 ATU | LM | |||
| 354 | 110 mm 10 ATU | LM | |||
| 355 | 125 mm 10 ATU | LM | |||
| 356 | 140 mm 10 ATU | LM | |||
| 357 | 160 mm 10 ATU | LM | |||
| 358 | 180 mm 10 ATU | LM | |||
| 359 | 200 mm 10 ATU | LM | |||
| 360 | 225 mm 10 ATU | LM | |||
| 361 | 250 mm 10 ATU | LM | |||
| 362 | 280 mm 10 ATU | LM | |||
| 363 | 315 mm 10 ATU | LM | |||
| 364 | 20 mm 16 ATU | LM | |||
| 365 | 25 mm 16 ATU | LM | |||
| 366 | 32 mm 16 ATU | LM | |||
| 367 | 40 mm 16 ATU | LM | |||
| 368 | 50 mm 16 ATU | LM | |||
| 369 | 63 mm 16 ATU | LM | |||
| 370 | 75 mm 16 ATU | LM | |||
| 371 | 90 mm 16 ATU | LM | |||
| 372 | 110 mm 16 ATU | LM | |||
| 373 | 125 mm 16 ATU | LM | |||
| 374 | 140 mm 16 ATU | LM | |||
| 375 | 160 mm 16 ATU | LM | |||
| 376 | 180 mm 16 ATU | LM | |||
| 377 | 200 mm 16 ATU | LM | |||
| 378 | 225 mm 16 ATU | LM | |||
| 376 | 250 mm 16 ATU | LM | |||
| 377 | 280 mm 16 ATU | LM | |||
| 378 | 315 mm 16 ATU | LM | |||
| 379 | 32 mm Adapter | EA | |||
| 380 | 40 mm Adapter | EA | |||
| 381 | 50 mm Adapter | EA | |||
| 382 | 63 mm Adapter | EA | |||
| 383 | 75 mm Adapter | EA | |||
| 384 | 90 mm Adapter | EA | |||
| 385 | 110 mm Adapter | EA | |||
| 386 | 125 mm Adapter | EA | |||
| 387 | 140 mm Adapter | EA | |||
| 388 | 160 mm Adapter | EA | |||
| 389 | 180 mm Adapter | EA | |||
| 390 | 200 mm Adapter | EA | |||
| 391 | 225 mm Adapter | EA | |||
| 392 | 250 mm Adapter | EA | |||
| 393 | 280 mm Adapter | EA | |||
| 394 | 315 mm Adapter | EA | |||
| 395 | 32 mm Sleeve | EA | |||
| 396 | 40 mm Sleeve | EA | |||
| 397 | 50 mm Sleeve | EA | |||
| 398 | 63 mm Sleeve | EA | |||
| 399 | 75 mm Sleeve | EA | |||
| 400 | 90 mm Sleeve | EA | |||
| 401 | 110 mm Sleeve | EA | |||
| 402 | 125 mm Sleeve | EA | |||
| 403 | 140 mm Sleeve | EA | |||
| 404 | 160 mm Sleeve | EA | |||
| 405 | 180 mm Sleeve | EA | |||
| 406 | 200 mm Sleeve | EA | |||
| 407 | 225 mm Sleeve | EA | |||
| 408 | 250 mm Sleeve | EA | |||
| 409 | 280 mm Sleeve | EA | |||
| 410 | 315 mm Sleeve | EA | |||
| 411 | 32 mm Elbow | EA | |||
| 412 | 40 mm Elbow | EA | |||
| 413 | 50 mm Elbow | EA | |||
| 414 | 63 mm Elbow | EA | |||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Water Lines, PE-100 (Polyethylene) Pressure Pipe, Installed Complete, Not Including Excavation and Backfill Continued | |||||
| 415 | 75 mm Elbow | EA | |||
| 416 | 90 mm Elbow | EA | |||
| 417 | 110 mm Elbow | EA | |||
| 418 | 125 mm Elbow | EA | |||
| 419 | 140 mm Elbow | EA | |||
| 420 | 160 mm Elbow | EA | |||
| 421 | 180 mm Elbow | EA | |||
| 422 | 200 mm Elbow | EA | |||
| 423 | 225 mm Elbow | EA | |||
| 424 | 250 mm Elbow | EA | |||
| 425 | 280 mm Elbow | EA | |||
| 426 | 315 mm Elbow | EA | |||
| 427 | 32 mm TEE | EA | |||
| 428 | 40 mm TEE | EA | |||
| 429 | 50 mm TEE | EA | |||
| 430 | 63 mm TEE | EA | |||
| 431 | 75 mm TEE | EA | |||
| 432 | 90 mm TEE | EA | |||
| 433 | 110 mm TEE | EA | |||
| 434 | 125 mm TEE | EA | |||
| 435 | 140 mm TEE | EA | |||
| 436 | 160 mm TEE | EA | |||
| 437 | 180 mm TEE | EA | |||
| 438 | 200 mm TEE | EA | |||
| 439 | 225 mm TEE | EA | |||
| 440 | 250 mm TEE | EA | |||
| 441 | 280 mm TEE | EA | |||
| 442 | 315 mm TEE | EA | |||
| 443 | RESERVED | ||||
| 444 | RESERVED | ||||
| 445 | RESERVED | ||||
| 446 | RESERVED | ||||
| SN8 Triplex Sewer Pipes | |||||
| 447 | 100 mm Triplex Pipe | LM | |||
| 448 | 100 mm Triplex Pipe Sleeve | EA | |||
| 449 | 100 mm Triplex Pipe Gasket | EA | |||
| 450 | 150 mm Triplex Pipe | LM | |||
| 451 | 150 mm Triplex Pipe Sleeve | EA | |||
| 452 | 150 mm Triplex Pipe Gasket | EA | |||
| 453 | 200 mm Triplex Pipe | LM | |||
| 454 | 200 mm Triplex Pipe Sleeve | EA | |||
| 455 | 200 mm Triplex Pipe Gasket | EA | |||
| 456 | 250 mm Triplex Pipe | LM | |||
| 457 | 250 mm Triplex Pipe Sleeve | EA | |||
| 458 | 250 mm Triplex Pipe Gasket | EA | |||
| 459 | 300 mm Triplex Pipe | LM | |||
| 460 | 300 mm Triplex Pipe Sleeve | EA | |||
| 461 | 300 mm Triplex Pipe Gasket | EA | |||
| 462 | 400 mm Triplex Pipe | LM | |||
| 463 | 400 mm Triplex Pipe Sleeve | EA | |||
| 464 | 400 mm Triplex Pipe Gasket | EA | |||
| 465 | 500 mm Triplex Pipe | LM | |||
| 466 | 500 mm Triplex Pipe Gasket | EA | |||
| 467 | 600 mm Triplex Pipe | LM | |||
| 468 | 600 mm Triplex Pipe Gasket | EA | |||
| 469 | RESERVED | ||||
| 470 | RESERVED | ||||
| 471 | RESERVED | ||||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Relocate Sprinkler Systems, Includes New Pipe and Using Existing Heads, Not Including Excavation or Backfill | |||||
| 472 | Piping, PVC Solvent Weld | LT | |||
| 473 | 20 mm 10 ATU | LM | |||
| 474 | 25 mm 10 ATU | LM | |||
| 475 | 32 mm 10 ATU | LM | |||
| 476 | Relocate Existing Head | EA | |||
| 477 | RESERVED | ||||
| 478 | RESERVED | ||||
| Miscellaneous roadway or parking electrical work elements | |||||
| 479 | Provide & istall 10m. high galvanized metal light pole c/w 1.5m galvanized metal single arm, 250w high pressure sodium lamped light fixture, 10A c/b in wp cast iron box ,pole wiring (3*2.5 mm2 NYY) 3m grounding rod with test pit & 25 mm2 bare copper wire, concrete foundation & handhole 1.5" grsc | EA | |||
| 480 | Provide & install 4" 10 Atu PVC cable duct in soil c/w detectable tape, brick & sand in soil &under paved area | LM | |||
| 481 | Provide & install 1*4" 10 atu PVC cable duct with additional spare 4" 10 atu PVC cable in concrete encasement for road crossing | LM | |||
| 482 | Provide & install4*6 mm2 NYY cable | LM | |||
| 483 | Provide & install3*6 mm2 NYY cable | LM | |||
| 484 | Provide & install 2*6 mm2 NYY cable | LM | |||
| 485 | Provide & install4*10 mm2 NYY cable | LM | |||
| 486 | Provide & install4*16 mm2 NYY cable | LM | |||
| 487 | Provide & install4*25 mm2 NYY cable | LM | |||
| 488 | Provide & Install concrete handhole c/w cover, frame, grounding rod, grounding and non-metallic rack | EA | |||
| 489 | Adjust 3x16 mm2 NYCY electric cable c/w 4 ea splice | LM | |||
| 490 | Adjust 3x25/16 mm2 NYCY electric cable c/w 4 ea splice | EA | |||
| 491 | Adjust 3x35/16 mm2 NYCY electric cable c/w 2 ea splice | LM | |||
| 492 | Adjust 3x120/70 mm2 NYY electric cable c/w 2 ea splice | LM | |||
| 493 | Provide & Install 3.30m copper grounding rod | EA | |||
| 494 | Provide & Install 35mm2 bare stranded grounding wire | LM | |||
| 495 | Provide & Install grounding pit frame and cover | EA | |||
| 496 | Provide & Install cable marker | EA | |||
| 497 | Provide & Install detectable 15 cm wide orange plastic tape for underground cable | EA | |||
| 498 | Provide & Install 10 cm dia. galvanized steel conduit for building service entrance | LM | |||
| 499 | Provide & Install 6 pair copper cable | LM | |||
| 500 | RESERVED | ||||
| 501 | RESERVED | ||||
| Manhole and Ductbank for Communications Cables | |||||
| 502 | Provide & Install 10 pair copper cable | LM | |||
| 503 | Provide & Install 20 pair copper cable | LM | |||
| 504 | Provide & Install 50 pair copper cable | LM | |||
| 505 | Provide & Install 100 pair copper cable | LM | |||
| 506 | Provide & Install 150 pair copper cable | LM | |||
| 507 | Provide & Install 200 pair copper cable | LM | |||
| 508 | Provide & Install 400 pair copper cable | LM | |||
| 509 | Provide & Install 600 pair copper cable | LM | |||
| 510 | Provide & Install 900 pair copper cable | LM | |||
| 511 | Provide & Install 1200 pair copper cable | LM | |||
| 512 | Provide & Install 1/4" nylon pull wire | LM | |||
| 513 | Provide & Install label for manhole, handhole, or service box | EA | |||
| 514 | Provide & Install label for cable | EA | |||
| 515 | Conduct grounding test per point | EA | |||
| 516 | Provide & install 66 Block and Stand-off | EA | |||
| 517 | Provide & install 355 Terminal Block 100 Pair | EA | |||
| 518 | Provide and Install protected entrance terminal (PET) 25 pair with 3-pin element, plug in orange gas tube protective modules | EA | |||
| 519 | Provide and Install protected entrance terminal (PET) 50 pair with 3-pin element, plug in orange gas tube protective modules | EA | |||
| Item | ITEM | Unit | Unit Price Base Year | 1st Opt Year | 2 nd Opt Year |
| No | |||||
| Manhole and Ductbank for Communications Cables Continued | |||||
| 520 | Provide and Install protected entrance terminal (PET) 100 pair with 3-pin element, plug in orange gas tube protective modules | EA | |||
| 521 | 300 pair stainless steel armadillo splice case comm cable splice c/w all accessories | EA | |||
| 522 | 200 pair stainless steel armadillo splice case comm cable splice c/w all accessories | EA | |||
| 523 | 100 pair stainless steel armadillo splice case comm cable splice c/w all accessories | EA | |||
| 524 | 50 pair stainless steel armadillo splice case comm cable splice c/w all accessories | EA | |||
| 525 | Provide & Install exothermic weld | EA | |||
| 526 | Comm PET search per pair | EA | |||
| 527 | RESERVED | ||||
| 528 | RESERVED | ||||
| 529 | RESERVED | ||||
| 530 | RESERVED | ||||
| 531 | RESERVED | ||||
| 532 | RESERVED | ||||
| Fence | |||||
| 533 | Provide & install galvanized chain link fence fabric (2.15 m high, 6-gage wire 50x50x5mm) c/w all accessories (except barbed/concertina wire) | LM | |||
| 534 | Provide & install chain link fence fabric (2.15 m high, 6-gage wire 50x50x5mm) c/w all accessories (except barbed/concertina wire) and concrete security beam | LM | |||
| 535 | Provide & install concertina wire | LM | |||
| 536 | Provide & install galvanized barbed wire | LM | |||
| 537 | Provide & install chain link fence gate (1m opening, 2.15m high) c/w all accessories | EA | |||
| 538 | Provide & install chain link fence gate (6m opening, 2.15m high) c/w all accessories | EA | |||
| 539 | Provide & install chain link fence gate (7m opening, 2.15m high) c/w all accessories | EA | |||
| 540 | Provide & install chain link fence gate (10m opening, 2.15m high) c/w all accessories | EA | |||
| 541 | Provide & install motor operators for gates | EA | |||
| 542 | Provide & Install green jute screen fabric on chain link fence | SM | |||
| 543 | Provide & Install Concrete "NATO"-type fence post, c/w single outrigger and all accessories | EA | |||
| 544 | Provide & Install Concrete "NATO"-type fence post, c/w double outrigger and all accessories | EA | |||
| 545 | Provide & Install 9.6 meter long (650 kg (68 kg/m)) steel sliding gate, including supports, rails, and wheels, c/w wiring and electrical panel board at gate, speed control unit, safety break, two alarm lights, two photocells, UL or CE listed motor, and panel connection, at nearest source, including additional circuit breaker (cable and trenching to power source, to be paid under separate line items). | EA | |||
| 546 | RESERVED | ||||
| 547 | RESERVED | ||||
| 548 | RESERVED | ||||
| Wrought Iron and Wooden Fence | |||||
| 549 | Provide & install wrought iron fence | TON | |||
| 550 | Strip existing paint, apply prime coat, and paint wrought iron fence | SM | |||
| 551 | Provide & install kiln dried, pressure treated, first quality pine wood fence (10 cm x 10 cm posts; 10 cm x 2 cm slats), c/w all-chrome, heavy-duty, non-rusting hardware fasteners, and accessories. | SM | |||
| 552 | Provide and Apply RESTOL translucent wood oil (or equal) | SM | |||
| 553 | RESERVED | ||||
| 554 | RESERVED | ||||
| 555 | RESERVED |
&C
ROADS & GROUNDS IDIQ
BID SCHEDULE
ATTACHMENT 5
&R &C&P
File details come from the government source that posted it. Updated .