Questions and Answers V2.pdf

PDF 401 KB Posted

Attached to
Hazardous Waste Accumulation Point - Amendment 01 Federal contract opportunity
Solicitation number
FA5606-20-Q-2034
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Hazardous Waste Accumulation Point - Amendment 01, newest first.
File Type Posted
FA5606-20-Q-2034 Extended.pdf PDF
Questions and Answers.pdf PDF
Sample HWAP 2.png PNG image
Sample HWAP 1.png PNG image
FA5606-20-Q-2034 Finale.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Government Answers PWS Location Data

Can you confirm what electrical supply voltage and hertz is required? (Ex. 60 herz, 60 herz, etc.) It must be 220 volts and 60Hz. N/A

Does the Hazardous Waste Accumulation Container, needs to be IAW German and European regulations and laws? Yes

Does the user unload the HAZMAT container’s on job side, a 10,000 lbs forklift or crane is necessary? For the final set up of the container on a concrete surface, the use of a crane is suggested. Just for unloading a forklift is required, because the container is delivered on wood blocks. Ramstein has such a HAZMAT container, this has been unloaded by VRS. The necessary power connection needs to be done by CES.

No supplier must provide unloading and installation on site

Is the inside temperature sensor for the inside EX proof heater? yes

File details come from the government source that posted it. Updated .