Questions and Answers V2.pdf
PDF 401 KB Posted
- Attached to
- Hazardous Waste Accumulation Point - Amendment 01 Federal contract opportunity
- Solicitation number
- FA5606-20-Q-2034
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5606-20-Q-2034 Extended.pdf | ||
| Questions and Answers.pdf | ||
| Sample HWAP 2.png | PNG image | |
| Sample HWAP 1.png | PNG image | |
| FA5606-20-Q-2034 Finale.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Government Answers PWS Location Data
Can you confirm what electrical supply voltage and hertz is required? (Ex. 60 herz, 60 herz, etc.) It must be 220 volts and 60Hz. N/A
Does the Hazardous Waste Accumulation Container, needs to be IAW German and European regulations and laws? Yes
Does the user unload the HAZMAT container’s on job side, a 10,000 lbs forklift or crane is necessary? For the final set up of the container on a concrete surface, the use of a crane is suggested. Just for unloading a forklift is required, because the container is delivered on wood blocks. Ramstein has such a HAZMAT container, this has been unloaded by VRS. The necessary power connection needs to be done by CES.
No supplier must provide unloading and installation on site
Is the inside temperature sensor for the inside EX proof heater? yes
File details come from the government source that posted it. Updated .