Attachment_3_-_Lightning_Rods.pdf
PDF 16 KB Posted
- Attached to
- Radio Frequency (RF) Infrastructure Federal contract opportunity
- Solicitation number
- FA5606-16-T-0028
About this file
Attachment 3 - Lightning Rods
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5606-16-T-0028-0001_Amendment_to_extend_due_date.pdf | ||
| FA5606-16-T-0028-0001.docx | DOCX document | |
| Attachment_7_Tech_Specs_Polyphaser.pdf | ||
| Attachment_2_-_Antenna_Junction_Boxes.pdf | ||
| Attachment_5_Tech_Specs_TACO_VHF_UHF_Models.pdf | ||
| FA5606-16-T-0028.docx | DOCX document | |
| Attachment_4_Tech_Specs_TACO_VHF_Models.pdf | ||
| Attachment_1_-_Site_Layout_for_Work_Areas.pdf | ||
| Attachment_6_Tech_Specs_TACO_UHF_Models.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ant Twr Platform
2-inch O.D. Fiberglass Pre-assembled Lightning Mast (14-ft long with 2-ft rod). Part Number:
Advanced Lightning Technology (ALT) Series NO. 490 Mast Assembly, Or Equal. Clamped to outside of tower platform using stainless steel clamps (ALT PNs 490-9, 490-91, & 490-92) which must be ordered separately .
Twr Hatch
A
A
Lightning down conductor down tower leg to site ground.
Attach to leg using stand-offs.
Connections to ground system to be exothermic weld.
Lightning Mast assembly will have a “pigtail” cable provided with it and will be exothermic welded to the contractor provided down conductor (soft #2 AWG, TLP 506 or equal) which will be run down tower legs to site ground or rod driven in ground. The down conductor will be run on stand-offs on the tower leggs and will be cad-welded to each tower section.
Lightning Mast need to be near the corners at 180 degrees opposite each other.
To Ground
Arrestor
Standard Tower Lightning Protection
38 EIG STD-SKT-TWRLIPRO--01
Org: Aug 02; Rev A, 5 Aug 03; Rev B, 12 Apr 04;
Rev C, 2 Jun 04
Section “A - A”
File: LgtRodPro1
Note: Where tower leg sections are bolted together on the vertical runs, a ground strap cable will cad-weld connecting the tower sections making a continuous bond. And a strap will be installed connecting the platform to the tower legs too.
Note: Exact position of each Mast depends on location of antenna swing out assembly.
Mast must not interfere with antenna or swing out assembly.
2-ft
-ft
-in
Mast
Manufacturer of Series NO. 490 Mast Assembly:
Advanced Lightning Technology (ALT) 122 Leesley Lane, Argyle TX 76226 1-800-950-7933
File details come from the government source that posted it. Updated .