Elevator Maintenance Solicitation and Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Maintenance, newest first.
File Type Posted
Elevator_Amendment_4.pdf PDF
Amendment_3.doc DOC document
Elevator_Maintenance_Solicitation_Amendment_0002.doc DOC document
AMENDMENT_01.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

52 CONTRACTING SQ (CONS)

CIVIL ENGINEERING FLIGHT

GEB128., ARNOLD BLVD.

SPANGDAHLEM 54529

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

FA5606-16-R-0009 21-Mar-2016

b. TELEPHONE NUMBER

452-9323

8. OFFER DUE DATE/LOCAL TIME

12:00 AM 20 Apr 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

FA5606

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE F3W342 16. ADMINISTERED BY

52 CES/CEOM

AXEL EPPER

GEB. 115 (SPANGDAHLEM FLUGPLATZ)

SPANGDAHLEM 54529

TEL: 06565-61-6183 FAX:

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TIMOTHY MCCULLOUGH

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

238290

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SEE SCHEDULE

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

2 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

FA5606-16-R-0009

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 20 Each

QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

PURCHASE REQUEST NUMBER: F3W3425177A001

SIGNAL CODE: A

NET AMT

0002 10 Each

ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0003 1 Lot

UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0004 1 Lot

SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0005 3 Each

ANNUAL MAINTENANCE HEAT/SMOKE VENTS

FFP

Annual maintenance for heat/smoke vents on each (3) elevators located in

Bldg 129, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0006 14 Each

QUARTERLY PREVENTATIVE MAINTENANCE MDG

FFP

Quarterly preventive maintenance on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0007 7 Each

ANNUAL TUEV INSPECTION MDG

FFP

Annual TUEV Inspection on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

PURCHASE REQUEST NUMBER: F3W4015292A001

0008 1 Lot

UNSCHEDULED REPAIR MDG

FFP

Unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0009 1 Lot

SPARE PARTS UNSCHEDULED REPAIR MDG

FFP

Spare parts for unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0010 2 Each

ANNUAL MAINTENANCE HEAT/SMOKE VENTS MDG

FFP

Annual maintenance for heat/smoke vents on each (2) MDG elevators located in

Bldg 550. In accordance with the attached Performance Work Statement dated 23

October 2015.

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0011 4 Each

QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (2) elevators located in Bldg 70, Bitburg

Annex. In accordance with the attached Performance Work Statement dated 23

October 2015.

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0012 2 Each

ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (2) elevators located in Bldg 70 Bitburg Annex.

In accordance with the attached Performance Work Statement dated 23 October

2015.

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0013 2 Lot

UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015.

This amount is an estimate only and the amount shall be an estimate and Not to

Exceed (NTE).

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

0014 2 Lot

SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (2) elevators located in Bldg 70

Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 25 April 2016 - 31 August 2016.

FOB: Destination

1001 40 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2016 - 31 August 2017.

FOB: Destination

1002 10 Each

OPTION ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2016 - 31 August 2017.

1003 1 Lot

OPTION UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 1 September 2016 - 31 August 2017.

1004 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 1 September 2016 - 31 August 2017.

1005 3 Each

OPTION ANNUAL MAINTENANCE HEAT/SMOKE VENTS

FFP

Annual maintenance for heat/smoke vents on each (3) each elevators located in

Bldg 129, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2016 - 31 August 2017.

1006 28 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE MDG

FFP

Quarterly preventive maintenance on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2016 - 31 August 2017.

1007 7 Each

OPTION ANNUAL TUEV INSPECTION MDG

FFP

Annual TUEV Inspection on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2016 - 31 August 2017.

1008 1 Lot

OPTION UNSCHEDULED REPAIR MDG

FFP

Unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2016 - 31 August 2017.

1009 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR MDG

FFP

Spare parts for unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2016 - 31 August 2017.

1010 2 Each

OPTION ANNUAL MAINTENANCE HEAT/SMOKE VENTS MDG

FFP

Annual maintenance for heat/smoke vents on each (2) MDG elevators located in

Bldg 550. In accordance with the attached Performance Work Statement dated 23

October 2015.

Performance Period: 1 September 2016 - 31 August 2017.

1011 2 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (2) elevators located in Bldg 70, Bitburg

Annex. In accordance with the attached Performance Work Statement dated 23

October 2015.

Performance Period: 1 September 2016 - 31 August 2017.

1012 1 Each

OPTION ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (2) elevators located in Bldg 70 Bitburg Annex.

In accordance with the attached Performance Work Statement dated 23 October

2015.

Performance Period: 1 September 2016 - 31 August 2017.

1013 1 Lot

OPTION UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October

2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2016 - 31 August 2017.

1014 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (2) elevators located in Bldg 70

Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2016 - 31 August 2017.

2001 40 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2017 - 31 August 2018.

2002 10 Each

OPTION ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2017 - 31 August 2018.

2003 1 Lot

OPTION UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 1 September 2017 - 31 August 2018.

2004 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 1 September 2017 - 31 August 2018.

2005 3 Each

OPTION ANNUAL MAINTENANCE HEAT/SMOKE VENTS

FFP

Annual maintenance for heat/smoke vents on each (3) elevators located in

Bldg 129, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2017 - 31 August 2018.

2006 28 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE MDG

FFP

Quarterly preventive maintenance on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2017 - 31 August 2018.

2007 7 Each

OPTION ANNUAL TUEV INSPECTION MDG

FFP

Annual TUEV Inspection on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2017 - 31 August 2018.

2008 1 Lot

OPTION UNSCHEDULED REPAIR MDG

FFP

Unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2017 - 31 August 2018.

2009 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR MDG

FFP

Spare parts for unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2017 - 31 August 2018.

2010 2 Each

OPTION ANNUAL MAINTENANCE HEAT/SMOKE VENTS MDG

FFP

Annual maintenance for heat/smoke vents on each (2) MDG elevators located in

Bldg 550. In accordance with the attached Performance Work Statement dated 23

October 2015.

Performance Period: 1 September 2017 - 31 August 2018.

2011 1 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (2) elevators located in Bldg 70, Bitburg

Annex. In accordance with the attached Performance Work Statement dated 23

October 2015.

Performance Period: 1 September 2017 - 31 August 2018.

2012 1 Each

OPTION ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (2) elevators located in Bldg 70 Bitburg Annex.

In accordance with the attached Performance Work Statement dated 23 October

2015.

Performance Period: 1 September 2017 - 31 August 2018.

2013 1 Lot

OPTION UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015.

This amount is an estimate only and the amount shall be an estimate and Not to

Exceed (NTE).

Performance Period: 1 September 2017 - 31 August 2018.

2014 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (2) elevators located in Bldg 70

Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2017 - 31 August 2018.

3001 40 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2018 - 31 August 2019.

3002 10 Each

OPTION ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2018 - 31 August 2019.

3003 1 Lot

OPTION UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 1 September 2018 - 31 August 2019.

3004 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 1 September 2018 - 31 August 2019.

3005 3 Each

OPTION ANNUAL MAINTENANCE HEAT/SMOKE VENTS

FFP

Annual maintenance for heat/smoke vents on each (3) elevators located in

Bldg 129, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2018 - 31 August 2019.

3006 28 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE MDG

FFP

Quarterly preventive maintenance on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2018 - 31 August 2019.

3007 7 Each

OPTION ANNUAL TUEV INSPECTION MDG

FFP

Annual TUEV Inspection on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2018 - 31 August 2019.

3008 1 Lot

OPTION UNSCHEDULED REPAIR MDG

FFP

Unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2018 - 31 August 2019.

3009 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR MDG

FFP

Spare parts for unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2018 - 31 August 2019.

3010 2 Each

OPTION ANNUAL MAINTENANCE HEAT/SMOKE VENTS MDG

FFP

Annual maintenance for heat/smoke vents on each (2) MDG elevators located in

Bldg 550. In accordance with the attached Performance Work Statement dated 23

October 2015.

Performance Period: 1 September 2018 - 31 August 2019.

3011 1 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (2) elevators located in

Bldg 70, Bitburg Annex. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2018 - 31 August 2019.

3012 1 Each

OPTION ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (2) elevators located in Bldg 70 Bitburg Annex.

In accordance with the attached Performance Work Statement dated 23 October

2015.

Performance Period: 1 September 2018 - 31 August 2019.

3013 1 Lot

OPTION UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015.

This amount is an estimate only and the amount shall be an estimate and Not to

Exceed (NTE).

Performance Period: 1 September 2018 - 31 August 2019.

3014 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (2) elevators located in Bldg 70

Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2018 - 31 August 2019.

4001 40 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2019 - 31 August 2020.

4002 10 Each

OPTION ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2019 - 31 August 2020.

4003 1 Lot

OPTION UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 1 September 2019 - 31 August 2020.

4004 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed

(NTE).

Performance Period: 1 September 2019 - 31 August 2020.

4005 3 Each

OPTION ANNUAL MAINTENANCE HEAT/SMOKE VENTS

FFP

Annual maintenance for heat/smoke vents on each (3) elevators located in

Bldg 129, 580 (the new Fitness Center) and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.

Performance Period: 1 September 2019 - 31 August 2020.

4006 28 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE MDG

FFP

Quarterly preventive maintenance on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2019 - 31 August 2020.

4007 7 Each

OPTION ANNUAL TUEV INSPECTION MDG

FFP

Annual TUEV Inspection on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2019 - 31 August 2020.

4008 1 Lot

OPTION UNSCHEDULED REPAIR MDG

FFP

Unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2019 - 31 August 2020.

4009 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR MDG

FFP

Spare parts for unscheduled repairs on each (7) MDG elevators located in

Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work

Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2019 - 31 August 2020.

4010 2 Each

OPTION ANNUAL MAINTENANCE HEAT/SMOKE VENTS MDG

FFP

Annual maintenance for heat/smoke vents on each (2) MDG elevators located in

Bldg 550. In accordance with the attached Performance Work Statement dated 23

October 2015.

Performance Period: 1 September 2019 - 31 August 2020.

4011 1 Each

OPTION QUARTERLY PREVENTATIVE MAINTENANCE

FFP

Quarterly preventive maintenance on each (2) elevators located in

Bldg 70, Bitburg Annex. In accordance with the attached Performance Work

Statement dated 23 October 2015.

Performance Period: 1 September 2019 - 31 August 2020.

4012 1 Each

OPTION ANNUAL TUEV INSPECTION

FFP

Annual TUEV Inspection on each (2) elevators located in Bldg 70 Bitburg Annex.

In accordance with the attached Performance Work Statement dated 23 October

2015.

Performance Period: 1 September 2019 - 31 August 2020.

4013 1 Lot

OPTION UNSCHEDULED REPAIR

FFP

Unscheduled repairs on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015.

This amount is an estimate only and the amount shall be an estimate and Not to

Exceed (NTE).

Performance Period: 1 September 2019 - 31 August 2020.

4014 1 Lot

OPTION SPARE PARTS UNSCHEDULED REPAIR

FFP

Spare parts for unscheduled repairs on each (2) elevators located in Bldg 70

Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).

Performance Period: 1 September 2019 - 31 August 2020.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

0007 Destination Government Destination Government

0008 Destination Government Destination Government

0009 Destination Government Destination Government

0010 Destination Government Destination Government

0011 Destination Government Destination Government

0012 Destination Government Destination Government

0013 Destination Government Destination Government

0014 Destination Government Destination Government

1001 Destination Government Destination Government

1002 Destination Government Destination Government

1003 Destination Government Destination Government

1004 Destination Government Destination Government

1005 Destination Government Destination Government

1006 Destination Government Destination Government

1007 Destination Government Destination Government

1008 Destination Government Destination Government

1009 Destination Government Destination Government

1010 Destination Government Destination Government

1011 Destination Government Destination Government

1012 Destination Government Destination Government

1013 Destination Government Destination Government

1014 Destination Government Destination Government

2001 Destination Government Destination Government

2002 Destination Government Destination Government

2003 Destination Government Destination Government

2004 Destination Government Destination Government

2005 Destination Government Destination Government

2006 Destination Government Destination Government

2007 Destination Government Destination Government

2008 Destination Government Destination Government

2009 Destination Government Destination Government

2010 Destination Government Destination Government

2011 Destination Government Destination Government

2012 Destination Government Destination Government

2013 Destination Government Destination Government

2014 Destination Government Destination Government

3001 Destination Government Destination Government

3002 Destination Government Destination Government

3003 Destination Government Destination Government

3004 Destination Government Destination Government

3005 Destination Government Destination Government

3006 Destination Government Destination Government

3007 Destination Government Destination Government

3008 Destination Government Destination Government

3009 Destination Government Destination Government

3010 Destination Government Destination Government

3011 Destination Government Destination Government

3012 Destination Government Destination Government

3013 Destination Government Destination Government

3014 Destination Government Destination Government

4001 Destination Government Destination Government

4002 Destination Government Destination Government

4003 Destination Government Destination Government

4004 Destination Government Destination Government

4005 Destination Government Destination Government

4006 Destination Government Destination Government

4007 Destination Government Destination Government

4008 Destination Government Destination Government

4009 Destination Government Destination Government

4010 Destination Government Destination Government

4011 Destination Government Destination Government

4012 Destination Government Destination Government

4013 Destination Government Destination Government

4014 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 25-APR-2016 TO

31-AUG-2016

N/A 52 CES/CEOM

AXEL EPPER

GEB. 115 (SPANGDAHLEM FLUGPLATZ)

SPANGDAHLEM 54529

06565-61-6183

F3W342

0002 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 25-APR-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 01-SEP-2016 TO

31-AUG-2017

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1012 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 01-SEP-2016 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-SEP-2017 TO

31-AUG-2018

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2007 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2008 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2009 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2010 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2011 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2012 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2013 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

2014 POP 01-SEP-2017 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-SEP-2018 TO

31-AUG-2019

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3005 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3006 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3007 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3008 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3009 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3010 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3011 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3012 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3013 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

3014 POP 01-SEP-2018 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-SEP-2019 TO

31-AUG-2020

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4005 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4006 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4007 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4008 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4009 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4010 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4011 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4012 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4013 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

4014 POP 01-SEP-2019 TO

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013

52.203-3 Gratuities APR 1984

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract

Awards

OCT 2015

52.204-13 System for Award Management Maintenance JUL 2013

52.212-1 Instructions to Offerors--Commercial Items OCT 2015

52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015

52.213-3 Notice to Suppliers APR 1984

52.225-14 Inconsistency Between English Version And Translation Of

Contract

FEB 2000

52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

OCT 2015

52.232-17 Interest MAY 2014

52.232-23 Assignment Of Claims MAY 2014

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.233-1 Disputes MAY 2014

52.233-3 Protest After Award AUG 1996

52.237-1 Site Visit APR 1984

52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.242-13 Bankruptcy JUL 1995

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting.

DEC 2015

252.204-7015 Disclosure of Information to Litigation Support Contractors FEB 2014

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of

Terrorism

OCT 2015

252.215-7008 Only One Offer OCT 2013

252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997

252.225-7041 Correspondence in English JUN 1997

252.225-7042 Authorization to Perform APR 2003

252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7008 Assignment of Claims (Overseas) JUN 1997

252.233-7001 Choice of Law (Overseas) JUN 1997

CLAUSES INCORPORATED BY FULL TEXT

52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)

(a)(1) The Offeror certifies, to the best of its knowledge and belief, that-

(i) The Offeror and/or any of its Principals-

(A) Are ( ) are not ( ) presently debarred, suspended, proposed for debarment, or declared ineligible for the award of contracts by any Federal agency;

(B) Have ( ) have not ( ), within a three-year period preceding this offer, been convicted of or had a civil judgment rendered against them for: commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) contract or subcontract; violation of Federal or

State antitrust statutes relating to the submission of offers; or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property (if offeror checks “have”, the offeror shall also see 52.209-7, if included in this solicitation); and

(C) Are ( ) are not ( ) presently indicted for, or otherwise criminally or civilly charged by a governmental entity with, commission of any of the offenses enumerated in paragraph (a)(1)(i)(B) of this provision.;

and

(D) Have , have not , within a three-year period preceding this offer, been notified of any delinquent

Federal taxes in an amount that exceeds $3,500 for which the liability remains unsatisfied.

(1) Federal taxes are considered delinquent if both of the following criteria apply:

(i) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.

(ii) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.

(2) Examples. (i) The taxpayer has received a statutory notice of deficiency, under I.R.C. Sec. 6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.

(ii) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. Sec. 6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.

(iii) The taxpayer has entered into an installment agreement pursuant to I.R.C. Sec. 6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.

(iv) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code).

(ii) The Offeror has ( ) has not ( ), within a three-year period preceding this offer, had one or more contracts terminated for default by any Federal agency.

(2) Principal, for the purposes of this certification, means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager;

head of a division or business segment; and similar positions).

(b) The Offeror shall provide immediate written notice to the Contracting Officer if, at any time prior to contract award, the Offeror learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

(c) A certification that any of the items in paragraph (a) of this provision exists will not necessarily result in withholding of an award under this solicitation. However, the certification will be considered in connection with a determination of the Offeror's responsibility. Failure of the Offeror to furnish a certification or provide such additional information as requested by the Contracting Officer may render the Offeror nonresponsible.

(d) Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by paragraph (a) of this provision. The knowledge and information of an Offeror is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

(e) The certification in paragraph (a) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the Offeror knowingly rendered an erroneous certification, in addition to other remedies available to the Government, the Contracting Officer may terminate the contract resulting from this solicitation for default.

(End of provision)

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

(i) Price

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s) For the evaluation of the option price pursuant to FAR Clause 52.217-8, Option to Extend Services, 50% of the price(s) proposed for the last option period will be included in the total evaluated price (TEP). .

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.

Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2015)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site accessed through http://www.acquisition.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (p) of this provision.

(a) Definitions. As used in this provision --

“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.

"Forced or indentured child labor" means all work or service-

(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or

(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.

Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.

Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.

Inverted domestic corporation means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).

Manufactured end product means any end product in product and service codes (PSCs) 1000-9999, except--

(1) PSC 5510, Lumber and Related Basic Wood Materials;

(2) Product or Service Group (PSG) 87, Agricultural Supplies;

(3) PSG 88, Live Animals;

(4) PSG 89, Subsistence;

(5) PSC 9410, Crude Grades of Plant Materials;

http://www.acquisition.gov/

(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;

(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;

(8) PSC 9610, Ores;

(9) PSC 9620, Minerals, Natural and Synthetic; and

(10) PSC 9630, Additive Metal Materials.

Place of manufacture means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.

Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the

Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment

Act of 2007) conducting the business can demonstrate--

(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;

(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;

(3) Consist of providing goods or services to marginalized populations of Sudan;

(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;

(5) Consist of providing goods or services that are used only to promote health or education; or

(6) Have been voluntarily suspended.

Sensitive technology--

(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically--

(i) To restrict the free flow of unbiased information in Iran; or

(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and

(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act

(50 U.S.C. 1702(b)(3)).

Service-disabled veteran-owned small business concern--

(1) Means a small business concern--

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .