Elevator_Amendment_4.pdf
PDF 289 KB Posted
- Attached to
- Elevator Maintenance Federal contract opportunity
- Solicitation number
- FA5606-16-R-0009
About this file
After a review of this requirement there have been several changes in the quantity of elevators. Please review Amendment 0004 for a complete list of changes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3.doc | DOC document | |
| Elevator_Maintenance_Solicitation_Amendment_0002.doc | DOC document | |
| AMENDMENT_01.doc | DOC document | |
| Elevator_Maintenance_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE P AGE OF P AGES
J 1 23
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
11-May-2016
4. REQUISITION/P URCHASE REQ. NO.
SEE SCHEDULE
5. P ROJECT NO.(If applicable)
6. ISSUED BY
CODE
FA5606 7. ADMINISTERED BY (If other than item 6)
CODE
52 CONTRACTING SQ (CONS)
CIVIL ENGINEERING FLIGHT
GEB128., ARNOLD BLVD.
SPANGDAHLEM 54529
See Item 6
8. NAME AND ADDRESS OF CONT RACT OR (No., St reet , Count y, St at e and Zip Code) 9A. AMENDMENT OF SOLICIT AT ION NO.
FA5606-16-R-0009
X 9B. DAT ED (SEE IT EM 11)
21-Mar-2016
10A. MOD. OF CONT RACT /ORDER NO.
10B. DAT ED (SEE IT EM 13)
CODE FACILIT Y CODE
11. T HIS IT EM ONLY AP P LIES T O AMENDMENT S OF SOLICIT AT IONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE P LACE DESIGNATED FOR THE RECEIP T OF OFFERS P RIOR TO THE HOUR AND DATE SP ECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND AP P ROP RIAT ION DAT A (If required)
13. T HIS IT EM AP P LIES ONLY T O MODIFICAT IONS OF CONT RACT S/ORDERS.
IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN IT EM 14.
A. T HIS CHANGE ORDER IS ISSUED P URSUANT T O: (Specify aut horit y) T HE CHANGES SET FORT H IN IT EM 14 ARE MADE IN T HE
CONT RACT ORDER NO. IN IT EM 10A.
B. T HE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED T O REFLECT T HE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriat ion dat e, et c.) SET FORT H IN IT EM 14, P URSUANT T O T HE AUT HORIT Y OF FAR 43.103(B).
C. T HIS SUP P LEMENT AL AGREEMENT IS ENT ERED INT O P URSUANT T O AUT HORIT Y OF:
D. OT HER (Specify t ype of modificat ion and aut horit y)
E. IMP ORT ANT : Cont ract or is not , is required t o sign t his document and ret urn copies t o t he issuing office.
14. DESCRIP T ION OF AMENDMENT /MODIFICAT ION (Organized by UCF sect ion headings, including solicit at ion/cont ract subject mat t er where feasible.)
The purpose of this amendment is to:
1.Decrease the total number of elevators in CLINs 0001, 0002, 0003, 0004, 1001, 1002, 1003, 1004, 2001, 2002, 2003, 2004, 3001, 3002, 3003, 3004, 4001, 4002, 4003, and 4004 f rom ten (10) to nine (9).
2. Change the unit quantity f rom one (1) to eight (8) on CLINs 1011, 2011, 3011, and 4011.
3. Change the unit quantity f rom one (1) to tw o (2) on CLINs 1012, 2012, 3012, and 4012.
4. Add "Reserved Unused In Base Year" w ordage to CLINs 0002, 0007, and 0012.
5. Change the base year period of perf ormance start date f rom 25 April 2016 to 23 May 2016.
6. Extend the solicitation of f er due date to 18 May 2016.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND T IT LE OF SIGNER (T ype or print ) 16A. NAME AND T IT LE OF CONT RACT ING OFFICER (T ype or print )
15B. CONT RACT OR/OFFEROR
15C. DAT E SIGNED
TEL:
16B. UNIT ED ST AT ES OF AMERICA
EMAIL:
16C. DAT E SIGNED
(Signat ure of person aut horized t o sign)
BY 13-May-2016 (Signat ure of Cont ract ing Officer)
EXCEP T ION T O SF 30
AP P ROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83)
P rescribed by GSA
FAR (48 CFR) 53.243
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Apr-2016 11:00 AM to 18-May-
2016 02:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from Quarterly preventive maintenance on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 25 April 2016 - 31 August 2016.* to Quarterly preventive maintenance on each
(9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 23 May 2016 - 31 August 2016.*.
The pricing detail quantity has decreased by 2.00 from 20.00 to 18.00.
CLIN 0002
The CLIN extended description has changed from Annual TUEV Inspection on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: 25 April 2016 - 31 August 2016.* to Annual TUEV Inspection on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: Reserved; not required in the contract base year.*.
The pricing detail quantity has decreased by 10.00 from 10.00 to 0.00.
The unit of issue Each has been deleted.
CLIN 0003
The CLIN extended description has changed from Unscheduled repairs on each (10) elevators located in
Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Cont rol Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 25
April 2016 - 31 August 2016.* to Unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 23 May 2016 - 31 August
2016.*.
CLIN 0004
The CLIN extended description has changed from Spare parts for unscheduled repairs on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 25 April 2016 - 31 August 2016.* to Spare parts for unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 23 May 2016 - 31 August 2016.*.
CLIN 0005
The CLIN extended description has changed from Annual maintenance for heat/smoke vents on each (3) elevators located in Bldg 129, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem
Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.*Performance
Period: 25 April 2016 - 31 August 2016.* to Annual maintenance for heat/smoke vents on each (3) elevators located in Bldg 129, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base).
In accordance with the attached Performance Work Statement dated 23 October 2015.*Performance Period: 23
May 2016 - 31 August 2016.*.
CLIN 0006
The CLIN extended description has changed from Quarterly preventive maintenance on each (7) MDG elevators located in Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work Statement dated 23 October 2015.*Performance Period: 25 April 2016 - 31 August 2016.* to Quarterly preventive maintenance on each (7) MDG elevators located in Bldg 137, 161, 175, and 550. In accordance with the attached
Performance Work Statement dated 23 October 2015.*Performance Period: 23 May 2016 - 31 August 2016.*.
CLIN 0007
The CLIN extended description has changed from Annual TUEV Inspection on each (7) MDG elevators located in Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 25 April 2016 - 31 August 2016.* to Annual TUEV Inspection on each (7)
MDG elevators located in Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work
Statement dated 23 October 2015.*Performance Period: Reserved; not required in the contract base year.*.
The pricing detail quantity has decreased by 7.00 from 7.00 to 0.00.
CLIN 0008
The CLIN extended description has changed from Unscheduled repairs on each (7) MDG elevators located in Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
**Performance Period: 25 April 2016 - 31 August 2016.* to Unscheduled repairs on each (7) MDG elevators located in Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
**Performance Period: 23 May 2016 - 31 August 2016.*.
CLIN 0009
The CLIN extended description has changed from Spare parts for unscheduled repairs on each (7) MDG elevators located in Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed
(NTE). *Performance Period: 25 April 2016 - 31 August 2016.* to Spare parts for unscheduled repairs on each (7)
MDG elevators located in Bldg 137, 161, 175, and 550. In accordance with the attached Performance Work
Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to
Exceed (NTE). *Performance Period: 23 May 2016 - 31 August 2016.*.
CLIN 0010
The CLIN extended description has changed from Annual maintenance for heat/smoke vents on each (2)
MDG elevators located in Bldg 550. In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: 25 April 2016 - 31 August 2016.* to Annual maintenance for heat/smoke vents on each
(2) MDG elevators located in Bldg 550. In accordance with the attached Performance Work Statement dated 23
CLIN 0011
The CLIN extended description has changed from Quarterly preventive maintenance on each (2) elevators located in Bldg 70, Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: 25 April 2016 - 31 August 2016.* to Quarterly preventive maintenance on each (2) elevators located in Bldg 70, Bitburg Annex. In accordance with the attached Performance Work Statement dated 23
CLIN 0012
The CLIN extended description has changed from Annual TUEV Inspection on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: 25 April 2016 - 31 August 2016.* to Annual TUEV Inspection on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: Reserved; not required in the contract base year.*.
The pricing detail quantity has decreased by 2.00 from 2.00 to 0.00.
CLIN 0013
The CLIN extended description has changed from Unscheduled repairs on each (2) elevators located in
Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 25
April 2016 - 31 August 2016.* to Unscheduled repairs on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 23 May 2016 - 31 August
2016.*.
CLIN 0014
The CLIN extended description has changed from Spare parts for unscheduled repairs on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 25 April 2016 - 31 August 2016.* to Spare parts for unscheduled repairs on each (2) elevators located in Bldg 70 Bitburg Annex. In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 23 May 2016 - 31 August 2016.*.
CLIN 0015
The CLIN extended description has changed from Labor hours to perform unscheduled repairs on each
(18) elevators located in Building 216, 38, 442, 500, 520, 77, 454, 580, 129, 137, 161, 175, 550, and Bitburg Annex
Building 70. Performance Period: 25 April 2016 - 31 August 2016.
THE FOLLOWING RATES SHALL APPLY:*Labor rate per hour: EU (during regular duty hours0730 - 1630 hrs)*Labor rate per hour, non-duty hours (including Saturdays)1630 - 0730 hrs
EU *Labor rate per hour, Work on Sundays 0001-2400 EU *Labor rate per hour, Work on Holidays 0001-2400 EU *Roundtrip to Spangdahlem EU to Labor hours to perform unscheduled repairs on each (18) elevators located in Building 216, 38, 442, 500, 520, 77, 454, 580, 129, 137, 161, 175, 550, and Bitburg Annex Building 70. Performan ce Period: 23
May 2016 - 31 August 2016. THE FOLLOWING RATES SHALL APPLY:*Labor rate per hour: EU (during regular duty hours0730 - 1630 hrs)*Labor rate per hour, non-duty hours
(including Saturdays)1630 - 0730 hrs EU *Labor rate per hour, Work on Sundays 0001-2400
EU *Labor rate per hour, Work on Holidays 0001-2400 EU
*Roundtrip to Spangdahlem EU
CLIN 1001
The CLIN extended description has changed from Quarterly preventive maintenance on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 1 September 2016 - 31 August 2017.* to Quarterly preventive maintenance on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77
(the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.*Performance Period: 1 September 2016 - 31 August 2017.*.
The pricing detail quantity has decreased by 4.00 from 40.00 to 36.00.
CLIN 1002
The CLIN extended description has changed from Annual TUEV Inspection on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Ai r Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: 1 September 2016 - 31 August 2017.* to Annual TUEV Inspection on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 1 September 2016 - 31 August 2017.*.
The pricing detail quantity has decreased by 1.00 from 10.00 to 9.00.
CLIN 1003
Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 1
September 2016 - 31 August 2017.* to Unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air
Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 1 September
2016 - 31 August 2017.*.
CLIN 1004
elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air
Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 1 September 2016 - 31 August 2017.* to Spare parts for unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 1 September 2016 - 31 August 2017.*.
CLIN 1011
The pricing detail quantity has increased by 6.00 from 2.00 to 8.00.
CLIN 1012
The pricing detail quantity has increased by 1.00 from 1.00 to 2.00.
CLIN 2001
elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 1 September 2017 - 31 August 2018.* to Quarterly preventive maintenance on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77
(the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.*Performance Period: 1 September 2017 - 31 August 2018.*.
CLIN 2002
in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: 1 September 2017 - 31 August 2018.* to Annual TUEV Inspection on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 1 September 2017 - 31 August 2018.*.
CLIN 2003
Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 1
September 2017 - 31 August 2018.* to Unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air
Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 1 September
2017 - 31 August 2018.*.
CLIN 2004
elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 1 September 2017 - 31 August 2018.* to Spare parts for unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Stateme nt dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 1 September 2017 - 31 August 2018.*.
CLIN 2011
The pricing detail quantity has increased by 7.00 from 1.00 to 8.00.
CLIN 2012
CLIN 3001
elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air
Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 1 September 2018 - 31 August 2019.* to Quarterly preventive maintenance on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77
(the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.*Performance Period: 1 September 2018 - 31 August 2019.*.
CLIN 3002
in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: 1 September 2018 - 31 August 2019.* to Annual TUEV Inspection on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 1 September 2018 - 31 August 2019.*.
CLIN 3003
Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance P eriod: 1
September 2018 - 31 August 2019.* to Unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air
Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 1 September
2018 - 31 August 2019.*.
CLIN 3004
elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 1 September 2018 - 31 August 2019.* to Spare parts for unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air
Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 1 September 2018 - 31 August 2019.*.
CLIN 3011
CLIN 3012
CLIN 4001
The CLIN extended description has changed from Quarterly preventive maintenance on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 1 September 2019 - 31 August 2020.* to Quarterly preventive maintenance on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77
(the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015.*Performance Period: 1 September 2019 - 31 August 2020.*.
CLIN 4002
The CLIN extended description has changed from Annual TUEV Inspection on each (10) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October
2015.*Performance Period: 1 September 2019 - 31 August 2020.* to Annual TUEV Inspection on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control
Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015.*Performance Period: 1 September 2019 - 31 August 2020.*.
CLIN 4003
Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 1
September 2019 - 31 August 2020.* to Unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new Air Control Tower, Spangdahlem Air
Base). In accordance with the attached Performance Work Statement dated 23 October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE). *Performance Period: 1 September
2019 - 31 August 2020.*.
CLIN 4004
elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 1 September 2019 - 31 August 2020.* to Spare parts for unscheduled repairs on each (9) elevators located in Bldg 38, 129, 216, 442, 454, 500, 520, 580 (the new Fitness Center)and Bldg 77 (the new
Air Control Tower, Spangdahlem Air Base). In accordance with the attached Performance Work Statement dated 23
October 2015. This amount is an estimate only and the amount shall be an estimate and Not to Exceed (NTE).
*Performance Period: 1 September 2019 - 31 August 2020.*.
CLIN 4008
This CLIN has been renumbered to CLIN 4010.
CLIN 4010
This CLIN has been renumbered to CLIN 4011.
CLIN 4011
This CLIN has been renumbered to CLIN 4012.
CLIN 4012
This CLIN has been renumbered to CLIN 4013.
CLIN 4013
This CLIN has been renumbered to CLIN 4014.
CLIN 4014
This CLIN has been renumbered to CLIN 4008.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
POP 25-APR-2016 TO
31-AUG-2016
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
FOB: Destination
F3W342
To:
POP 23-MAY-2016 TO
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 0002:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0003 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0004 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0005 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0006 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 0007:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0008 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0009 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0010 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0011 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 0012:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0013 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0014 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 0015 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 1001 has been changed from:
POP 01-SEP-2016 TO
31-AUG-2017
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 1002 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 1011 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 1012 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 2001 has been changed from:
POP 01-SEP-2017 TO
31-AUG-2018
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 2002 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 2011 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 2012 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 3001 has been changed from:
POP 01-SEP-2018 TO
31-AUG-2019
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 3002 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 3011 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 3012 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 4001 has been changed from:
POP 01-SEP-2019 TO
31-AUG-2020
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule item for CLIN 4002 has been changed from:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 4008:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 4010:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 4011:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 4012:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 4013:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
The following Delivery Schedule Item has been deleted from CLIN 4014:
N/A 52 CES/CEOM
AXEL EPPER
GEB. 115 (SPANGDAHLEM FLUGPLATZ)
SPANGDAHLEM 54529
06565-61-6183
(End of Summary of Changes)
File details come from the government source that posted it. Updated .