Attachment 5 Schedule of Material Submittals.xlsx

XLSX spreadsheet 42 KB Posted

Attached to
RPR/ADD Fire Alarm Reporting & Mass Notification Systems Federal contract opportunity
Solicitation number
FA557520R0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This document contains details for a federal contract opportunity to replace fire alarm reporting and mass notification systems at Moron Air Base in Spain. The scope of work includes demolishing the existing fire alarm reporting system in 49 buildings, installing a new system with radio transceivers and antennas in each building connected to the respective building's fire alarm control panel. Additional requirements are to install new dispatch stations, a client workstation, fiber optic communications, and to integrate existing mass notification systems. The certification requirements specify classification groups for electrical and communications work. The anticipated solicitation number is FA5575-20-R-0002 with an estimated value between $1-5 million and a 365-day period of performance. The pre-solicitation notice encourages potential offerors to monitor the website for release of the full solicitation on or after July 15, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to RPR/ADD Fire Alarm Reporting & Mass Notification Systems, newest first.
File Type Posted
Attachment 2 Especificaciones Espanol.pdf PDF
Solicitation - FA557520R0002.pdf PDF
Attachment 3 Drawings.pdf PDF
Attachment 1 Specifications English.pdf PDF
Attachment 4 Construction Cost Breakdown BLANK.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 15-1010PROJECT TITLE

RPR/ADD FIRE ALARM REPORTING & MASS NOTIFICATION SYSTEM, MULTI

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 01
1Construction Schedule1NTP+7
2Work Plan1NTP+7
3Warranty letter1Prior to Final Inspection (FI)
4Progress Schedule1NTP+10
5Mobility Plan1NTP+15
6Project sign1NTP+15
7Quality Control Plan1NTP+15
8Environmental protection plan1NTP+15
9Waste & construction debris management certificate1Prior to FI
10As-Built drawings1Prior to FI
11Spatial Data1Prior to FI, after as-builts approval
12Key Staff1NTP+15
13Health and safety program1NTP+15
14O&M Manuals1Prior to FI
SECTION 26 20 00
15RMC Conduit and fittings, 1 x type1
16EMT Conduit and fittings, 1 x type1
17Junction and pull boxes1
18Wires and cables1
19Circuit breakers1
20Lock-on breaker kits1
21Surge Protective Device1
22Safety Switches1
23Labels1
24Devices subject to manual operation1Facility Acceptance -5
250,6/1 kV insulation test1Facility Acceptance -5
26Single line diagram of the "as-built"1
27Active electrical equipment O&M Manuals1
SECTION 27 10 00
28Telecommunications Cabling (backbone and horizontal)1
29Patch Panels1
30Telecommunications outlet/connecotr assemblies1
31Equipment Support Frame1
32Telecdommunications Drawings1
33Telecommunications Space Drawings1
34Telecommunications cabling testing1
35Telecommunications Contracotr1
36Key Personnel Qualifications1
37Manufacturer Qualifications1
38Test Plan1
39Factory Reel Test1
SECTION 28 31 33.00 10
40Fire Alarm Reporting System1
41Wiring for Systems1
42Radio Fire Alarm Transceiver1
43Radio Fire Alarm & MNS Monitoring Base Station1
44Antenna System1
45Battery1
46Spare Parts1
47Qualifications1
48Training1
49Test Procedures1
49Testing1
50Equipment1
51Fire Alarm Reporting System O&M Manuals1
SECTION 28 31 76
52Wiring Diagrams1
53Wide-Area Mass Notification Speaker Stations1
54Lightning Protection System Components1
55Wide-Area Mass Notification Speaker Stations1
56Wide-Area Mass Notification Speaker Stations1

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 15-1010TÍTULO DE PROYECTO:
REPARAR/ AÑADIR SISTEMA DE TRANSMISION DE ALARMAS DE INCENDIO Y MNS, MULTISOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMERO DE COPIAS REQUERIDAS
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 01
1Programa de obra1NTP+7
2Plan de obra1NTP+7
3Carta de garantía1Antes de Inspección final (IF)
4Programa de avance de obras1NTP+10
5Plan de movilización1NTP+15
6Cartel de proyecto1NTP+15
7Plan de control de calidad1NTP+15
8Plan de protección medioambiental1NTP+15
9Certificado de gestión de residuos y escombros1Antes de Inspección final (IF)
10Planos As-Builts1Antes de Inspección final (IF)
11Datos espaciales1Antes de Inspección final (IF), tras la aprobación de as-builts
12Personal Clave1NTP+15
13Plan de salud y seguridad1NTP+15
14Manuales de Funcionamiento y Mantenimiento1Antes de Inspección final (IF)
SECCIÓN 26 20 00
15Tubo RMC y accesorios, 1 x tipo1
16Tubo EMT y accesorios, 1 x tipo1
17Cajas de conexión y paso1
18Conductores y cables1
19Interruptores automáticos1
20Dispositivos de bloqueo en circuito cerrado1
21Descargadores de sobretensiones1
22Desconectadores Fusibles1
23Etiquetas1
24Dispositivos sujetos a operación manual1Aceptación Edificio -5
25Ensayo de aislamiento del cableado de 0,6/1 kV1Aceptación Edificio -5
26Esquema unifialr del sistema eléctrico del edificio1
27Manuales Uso y Mto de equipo eléctrico activo1
SECCIÓN 27 10 00
28Cableado de Telecomunicaciones (principal y horizontal)1
29Paneles de Parcheo1
30Conjuntos de Tomas/Conectores de Telecomunicaciones1
31Estructura de Soporte de Equipo1
32Planos de Telecomunicaciones1
33Planos de Espacios de Telecomunicaciones1
34Pruebas de Cableado de Telecomunicaciones1
35Contratista de Telecomunicaciones1
36Cualificaciones del Personal1
37Cualificaciones del Fabricante1
38Plan de Pruebas1
39Pruebas de bobinas en fábrica1
SECCIÓN 28 31 33.00 10
40Sistema de Transmisión de Alarmas de Incendio1
41Cableado de Sistemas1
42Transmisor/Receptor de Alarmas de incendio por Radio1
43Estación Base de Monitorización de Alarmas de Incendio y Notificación Masiva por Radio1
44Sistema de Antena1
45Batería1
46Suministros1
47Cualificaciones1
48Formación1
49Procedimientos de Pruebas1
49Pruebas1
50Certificado de equipos1
51Manuales de Operación y Mantenimiento de Sistema de Transmisión de Alarmas de Incendio1
SECCIÓN 28 31 76
52Diagramas de Cableado1
53Estaciones de Altavoces Sistema Notificatión Masiva Exterior1
54Componentes Sist. Protección Contra el Rayo1
55Estaciones de Altavoces Sistema Notificatión Masiva Exterior1
56Estaciones de Altavoces Sistema Notificatión Masiva Exterior1

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

File details come from the government source that posted it. Updated .