This document contains details for a federal contract opportunity to replace fire alarm reporting and mass notification systems at Moron Air Base in Spain. The scope of work includes demolishing the existing fire alarm reporting system in 49 buildings, installing a new system with radio transceivers and antennas in each building connected to the respective building's fire alarm control panel. Additional requirements are to install new dispatch stations, a client workstation, fiber optic communications, and to integrate existing mass notification systems. The certification requirements specify classification groups for electrical and communications work. The anticipated solicitation number is FA5575-20-R-0002 with an estimated value between $1-5 million and a 365-day period of performance. The pre-solicitation notice encourages potential offerors to monitor the website for release of the full solicitation on or after July 15, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Especificaciones Espanol.pdf | ||
| Solicitation - FA557520R0002.pdf | ||
| Attachment 3 Drawings.pdf | ||
| Attachment 1 Specifications English.pdf | ||
| Attachment 4 Construction Cost Breakdown BLANK.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 15-1010 | PROJECT TITLE |
RPR/ADD FIRE ALARM REPORTING & MASS NOTIFICATION SYSTEM, MULTI
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | |||||||||
| 1 | Construction Schedule | 1 | NTP+7 | ||||||
| 2 | Work Plan | 1 | NTP+7 | ||||||
| 3 | Warranty letter | 1 | Prior to Final Inspection (FI) | ||||||
| 4 | Progress Schedule | 1 | NTP+10 | ||||||
| 5 | Mobility Plan | 1 | NTP+15 | ||||||
| 6 | Project sign | 1 | NTP+15 | ||||||
| 7 | Quality Control Plan | 1 | NTP+15 | ||||||
| 8 | Environmental protection plan | 1 | NTP+15 | ||||||
| 9 | Waste & construction debris management certificate | 1 | Prior to FI | ||||||
| 10 | As-Built drawings | 1 | Prior to FI | ||||||
| 11 | Spatial Data | 1 | Prior to FI, after as-builts approval | ||||||
| 12 | Key Staff | 1 | NTP+15 | ||||||
| 13 | Health and safety program | 1 | NTP+15 | ||||||
| 14 | O&M Manuals | 1 | Prior to FI | ||||||
| SECTION 26 20 00 | |||||||||
| 15 | RMC Conduit and fittings, 1 x type | 1 | |||||||
| 16 | EMT Conduit and fittings, 1 x type | 1 | |||||||
| 17 | Junction and pull boxes | 1 | |||||||
| 18 | Wires and cables | 1 | |||||||
| 19 | Circuit breakers | 1 | |||||||
| 20 | Lock-on breaker kits | 1 | |||||||
| 21 | Surge Protective Device | 1 | |||||||
| 22 | Safety Switches | 1 | |||||||
| 23 | Labels | 1 | |||||||
| 24 | Devices subject to manual operation | 1 | Facility Acceptance -5 | ||||||
| 25 | 0,6/1 kV insulation test | 1 | Facility Acceptance -5 | ||||||
| 26 | Single line diagram of the "as-built" | 1 | |||||||
| 27 | Active electrical equipment O&M Manuals | 1 | |||||||
| SECTION 27 10 00 | |||||||||
| 28 | Telecommunications Cabling (backbone and horizontal) | 1 | |||||||
| 29 | Patch Panels | 1 | |||||||
| 30 | Telecommunications outlet/connecotr assemblies | 1 | |||||||
| 31 | Equipment Support Frame | 1 | |||||||
| 32 | Telecdommunications Drawings | 1 | |||||||
| 33 | Telecommunications Space Drawings | 1 | |||||||
| 34 | Telecommunications cabling testing | 1 | |||||||
| 35 | Telecommunications Contracotr | 1 | |||||||
| 36 | Key Personnel Qualifications | 1 | |||||||
| 37 | Manufacturer Qualifications | 1 | |||||||
| 38 | Test Plan | 1 | |||||||
| 39 | Factory Reel Test | 1 | |||||||
| SECTION 28 31 33.00 10 | |||||||||
| 40 | Fire Alarm Reporting System | 1 | |||||||
| 41 | Wiring for Systems | 1 | |||||||
| 42 | Radio Fire Alarm Transceiver | 1 | |||||||
| 43 | Radio Fire Alarm & MNS Monitoring Base Station | 1 | |||||||
| 44 | Antenna System | 1 | |||||||
| 45 | Battery | 1 | |||||||
| 46 | Spare Parts | 1 | |||||||
| 47 | Qualifications | 1 | |||||||
| 48 | Training | 1 | |||||||
| 49 | Test Procedures | 1 | |||||||
| 49 | Testing | 1 | |||||||
| 50 | Equipment | 1 | |||||||
| 51 | Fire Alarm Reporting System O&M Manuals | 1 | |||||||
| SECTION 28 31 76 | |||||||||
| 52 | Wiring Diagrams | 1 | |||||||
| 53 | Wide-Area Mass Notification Speaker Stations | 1 | |||||||
| 54 | Lightning Protection System Components | 1 | |||||||
| 55 | Wide-Area Mass Notification Speaker Stations | 1 | |||||||
| 56 | Wide-Area Mass Notification Speaker Stations | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 15-1010 | TÍTULO DE PROYECTO: | |||
| REPARAR/ AÑADIR SISTEMA DE TRANSMISION DE ALARMAS DE INCENDIO Y MNS, MULTI | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMERO DE COPIAS REQUERIDAS | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 01 | |||||||||
| 1 | Programa de obra | 1 | NTP+7 | ||||||
| 2 | Plan de obra | 1 | NTP+7 | ||||||
| 3 | Carta de garantía | 1 | Antes de Inspección final (IF) | ||||||
| 4 | Programa de avance de obras | 1 | NTP+10 | ||||||
| 5 | Plan de movilización | 1 | NTP+15 | ||||||
| 6 | Cartel de proyecto | 1 | NTP+15 | ||||||
| 7 | Plan de control de calidad | 1 | NTP+15 | ||||||
| 8 | Plan de protección medioambiental | 1 | NTP+15 | ||||||
| 9 | Certificado de gestión de residuos y escombros | 1 | Antes de Inspección final (IF) | ||||||
| 10 | Planos As-Builts | 1 | Antes de Inspección final (IF) | ||||||
| 11 | Datos espaciales | 1 | Antes de Inspección final (IF), tras la aprobación de as-builts | ||||||
| 12 | Personal Clave | 1 | NTP+15 | ||||||
| 13 | Plan de salud y seguridad | 1 | NTP+15 | ||||||
| 14 | Manuales de Funcionamiento y Mantenimiento | 1 | Antes de Inspección final (IF) | ||||||
| SECCIÓN 26 20 00 | |||||||||
| 15 | Tubo RMC y accesorios, 1 x tipo | 1 | |||||||
| 16 | Tubo EMT y accesorios, 1 x tipo | 1 | |||||||
| 17 | Cajas de conexión y paso | 1 | |||||||
| 18 | Conductores y cables | 1 | |||||||
| 19 | Interruptores automáticos | 1 | |||||||
| 20 | Dispositivos de bloqueo en circuito cerrado | 1 | |||||||
| 21 | Descargadores de sobretensiones | 1 | |||||||
| 22 | Desconectadores Fusibles | 1 | |||||||
| 23 | Etiquetas | 1 | |||||||
| 24 | Dispositivos sujetos a operación manual | 1 | Aceptación Edificio -5 | ||||||
| 25 | Ensayo de aislamiento del cableado de 0,6/1 kV | 1 | Aceptación Edificio -5 | ||||||
| 26 | Esquema unifialr del sistema eléctrico del edificio | 1 | |||||||
| 27 | Manuales Uso y Mto de equipo eléctrico activo | 1 | |||||||
| SECCIÓN 27 10 00 | |||||||||
| 28 | Cableado de Telecomunicaciones (principal y horizontal) | 1 | |||||||
| 29 | Paneles de Parcheo | 1 | |||||||
| 30 | Conjuntos de Tomas/Conectores de Telecomunicaciones | 1 | |||||||
| 31 | Estructura de Soporte de Equipo | 1 | |||||||
| 32 | Planos de Telecomunicaciones | 1 | |||||||
| 33 | Planos de Espacios de Telecomunicaciones | 1 | |||||||
| 34 | Pruebas de Cableado de Telecomunicaciones | 1 | |||||||
| 35 | Contratista de Telecomunicaciones | 1 | |||||||
| 36 | Cualificaciones del Personal | 1 | |||||||
| 37 | Cualificaciones del Fabricante | 1 | |||||||
| 38 | Plan de Pruebas | 1 | |||||||
| 39 | Pruebas de bobinas en fábrica | 1 | |||||||
| SECCIÓN 28 31 33.00 10 | |||||||||
| 40 | Sistema de Transmisión de Alarmas de Incendio | 1 | |||||||
| 41 | Cableado de Sistemas | 1 | |||||||
| 42 | Transmisor/Receptor de Alarmas de incendio por Radio | 1 | |||||||
| 43 | Estación Base de Monitorización de Alarmas de Incendio y Notificación Masiva por Radio | 1 | |||||||
| 44 | Sistema de Antena | 1 | |||||||
| 45 | Batería | 1 | |||||||
| 46 | Suministros | 1 | |||||||
| 47 | Cualificaciones | 1 | |||||||
| 48 | Formación | 1 | |||||||
| 49 | Procedimientos de Pruebas | 1 | |||||||
| 49 | Pruebas | 1 | |||||||
| 50 | Certificado de equipos | 1 | |||||||
| 51 | Manuales de Operación y Mantenimiento de Sistema de Transmisión de Alarmas de Incendio | 1 | |||||||
| SECCIÓN 28 31 76 | |||||||||
| 52 | Diagramas de Cableado | 1 | |||||||
| 53 | Estaciones de Altavoces Sistema Notificatión Masiva Exterior | 1 | |||||||
| 54 | Componentes Sist. Protección Contra el Rayo | 1 | |||||||
| 55 | Estaciones de Altavoces Sistema Notificatión Masiva Exterior | 1 | |||||||
| 56 | Estaciones de Altavoces Sistema Notificatión Masiva Exterior | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
File details come from the government source that posted it. Updated .