This is a solicitation for a construction project to repair and expand a security forces parking lot at a U.S. Air Force base in Spain. The project scope includes installing bollards, removing a sewage line, constructing storm drainage, culverts, rip-rap, concrete drainage channels and curbs, sidewalks, a concrete drainage ditch and parking row cover, wheel stop bumpers, traffic signs, power distribution, lighting and a grounding system, relocating trees and shrubs, and painting markings and seeding. The estimated value is between $250,000 and $500,000. A pre-proposal conference will be held on January 27, 2020, and bids must be received by February 13, 2020. In accordance with agreements between the U.S. and Spain, Spanish materials, labor and equipment must be used where feasible. The solicitation notes that funds are not presently available and no award will be made until funding is in place. The Department of the Air Force and United States Air Forces in Europe - Air Forces Africa are the contracting agencies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Solicitation Amendment FA557520B00010001- SF 30.pdf | ||
| Specifications, Revision 01, Spanish.pdf | ||
| Memorandum for Contractors.pdf | ||
| Drawings, Revision 01.pdf | ||
| Sepcifications, Revision 01, English.pdf | ||
| Drawings.pdf | ||
| Specifications, Spanish.pdf | ||
| Specifications, English.pdf | ||
| Solicitation FA557520B0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 1 of 12
APPROVED DISAPPROVED
SECTION 01 11 01
GENERAL CONDITIONS
01 Warranty letter 1 Acceptance+15
02 Construction Schedule 1 NTP+7
03 Progress Schedule 1 NTP+10
04 Work Plan 1 NTP+7
05 Mobility Plan 1 NTP+15
06 Project Sign 1 NTP+15
07 Quality Control Plan 1 NTP+15
08 Environmental Protection Plan 1 NTP+15
09 DD Form 1354 1 FI+15
10 Waste & construction debris management 1 Final Inspection
11 As-Built drawings 1 FI+15
12 Spatial Data 1 As Built+10
13 Key Staff 1 NTP+15
14 Health and safety Plan 1 NTP +15
SECTION 03 30 00
CAST-IN-PLACE CONCRETE AND WHEEL STOPS
15 Curing Materials 1 16 Reinforcing Steel 1 17 Vapor Barrier 1 18 Joint Sealants 1 19 Joint Filler 1 20 Admixture 1
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
C
AT
AL
O
G D
AT
A
C
ER
TI
FI
C
AT
E O
F C
O M
PL
IA
N C
E
SH
O
P D
R
AW
IN
G
S
FI
EL
D R
EP
O
R
TS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
C O
LO
R
S
EL
EC
TI
O N
SC
H
ED
U
LE
S, L
IS
TI
N
G S, R
EP
O R
TS
, P
LA
N
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N
TE
ST
R
EP
O R
TS
PROJECT TITLE
CNS PARKING LOT
PROJECT NUMBER
QUUG 03-1004
(To be completed by Contract Administrator)
SOLICITATION / CONTRACT NO.
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
TE
C
H N
IC
AL
D
AT
A
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 2 of 12
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
C
AT
AL
O
G D
AT
A
C
ER
TI
FI
C
AT
E O
F C
O M
PL
IA
N C
E
SH
O
P D
R
AW
IN
G
S
FI
EL
D R
EP
O
R
TS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
C O
LO
R
S
EL
EC
TI
O N
SC
H
ED
U
LE
S, L
IS
TI
N
G S, R
EP
O R
TS
, P
LA
N
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N
TE
ST
R
EP
O R
TS
PROJECT TITLE
CNS PARKING LOT
PROJECT NUMBER
QUUG 03-1004
(To be completed by Contract Administrator)
SOLICITATION / CONTRACT NO.
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
TE
C
H N
IC
AL
D
AT
A
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
21 Precast Concrete Curbs 1 22 Rubber Wheel Stops 1 23 Horizontal Drain Concrete Curb (Caz) 1 24 Compressive Strength Tests 1
SECTION 05 12 00
STRUCTURAL STEEL
25 Pre-engineered Steel System Structural Calculation 1 26 Fabrication Drawings 1 27 Shop Primer Product Data 1 28 Steel Certificate 1 29 Bolts, Nuts, and Washers Certificates 1 30 Shop Primer Certificate 1 31 Welding Electrodes and Rods Certificates 1 32 Nonshrink Grout Certificate 1 33 Assembly Plan 1 34 Welding Procedures and Qualifications 1 35 Manufacturer's Shed Steel Plate Cover 1
SECTION 09 90 00
PAINTS AND COATINGS
36 Coating 1 37 Color Samples 1 38 Paint Application Instructions 1 39 Paint Mixing 1 40 Coating, Solvent or Potentially Hazardous Materials
Safety Data Sheet 1
Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 3 of 12
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
C
AT
AL
O
G D
AT
A
C
ER
TI
FI
C
AT
E O
F C
O M
PL
IA
N C
E
SH
O
P D
R
AW
IN
G
S
FI
EL
D R
EP
O
R
TS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
C O
LO
R
S
EL
EC
TI
O N
SC
H
ED
U
LE
S, L
IS
TI
N
G S, R
EP
O R
TS
, P
LA
N
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N
TE
ST
R
EP
O R
TS
PROJECT TITLE
CNS PARKING LOT
PROJECT NUMBER
QUUG 03-1004
(To be completed by Contract Administrator)
SOLICITATION / CONTRACT NO.
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
TE
C
H N
IC
AL
D
AT
A
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
41 Coatings 1
SECTION 26 56 00
EXTERIOR LIGHTING
42 Conduits and fittings 1 1 43 Wires and cables 1 1 44 Fluorescent Lighting Fixtures 1 1 45 Fluorescent Electronic Ballasts 1 1 46 Fluorescent Lamps 1 1 47 Lighting Contactor 1 1 48 Photocell switch 1 1 49 Circuit breaker 1 1 50 Electrical Panel 1 1 51 Operating Tests 1
SECTION 31 11 00
CLEARING AND GRUBBING
52 "Gestor Autorizado de Residuos" RDC Certificate 1 53 Landfill Certificate 1
SECTION 32 03 30
EMBANKMENTS
54 Tolerable soil identification 1 1 55 Selected soil origin control 1 1 56 Tolerable soil test section 1 57 Selected soil test section 1 58 Plan 1 59 Tolerable soil acceptance control 1 60 Selected soil acceptance control 1
Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 4 of 12
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
C
AT
AL
O
G D
AT
A
C
ER
TI
FI
C
AT
E O
F C
O M
PL
IA
N C
E
SH
O
P D
R
AW
IN
G
S
FI
EL
D R
EP
O
R
TS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
C O
LO
R
S
EL
EC
TI
O N
SC
H
ED
U
LE
S, L
IS
TI
N
G S, R
EP
O R
TS
, P
LA
N
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N
TE
ST
R
EP
O R
TS
PROJECT TITLE
CNS PARKING LOT
PROJECT NUMBER
QUUG 03-1004
(To be completed by Contract Administrator)
SOLICITATION / CONTRACT NO.
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
TE
C
H N
IC
AL
D
AT
A
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
SECTION 32 04 22
GEOTEXTILES AS SEPARATION AND FILTER
ELEMENTS
61 Geotextile 1 1 62 Execution control 1
SECTION 32 05 10
AGGREGATES
63 Aggregates origin control 1 1 64 Job mix formula 1 65 Test section 1 1 1 66 Acceptance control 1
SECTION 32 05 12
SOILS STABILIZED IN SITU
67 Underlaying surface 1 68 Water 1 1 69 Cement origin control 1 1 70 Soil origin control 1 1 71 Job Mix Formula 1 72 Test section 1 1 1 73 Execution control 1 74 Acceptance control 1
SECTION 32 05 30
PRIME COAT
75 Existing surface 1 76 Prime coat origin control 1 1 77 Coverage aggregate origin control 1 1 78 Prime coat application rate to be applied 1
Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 5 of 12
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
C
AT
AL
O
G D
AT
A
C
ER
TI
FI
C
AT
E O
F C
O M
PL
IA
N C
E
SH
O
P D
R
AW
IN
G
S
FI
EL
D R
EP
O
R
TS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
C O
LO
R
S
EL
EC
TI
O N
SC
H
ED
U
LE
S, L
IS
TI
N
G S, R
EP
O R
TS
, P
LA
N
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N
TE
ST
R
EP
O R
TS
PROJECT TITLE
CNS PARKING LOT
PROJECT NUMBER
QUUG 03-1004
(To be completed by Contract Administrator)
SOLICITATION / CONTRACT NO.
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
TE
C
H N
IC
AL
D
AT
A
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
79 Coverage aggregate application rate to be placed 1 80 Execution control 1
SECTION 32 05 31
TACK COAT
81 Tack coat origin control 1 1 82 Tack coat application rate to be applied 1 83 Execution control 1 84 Acceptance control after the placing of the next layer on top 1
SECTION 32 05 32
CURING COAT
85 Curing coat origin control 1 1 86 Coverage aggregate origin control 1 1 87 Curing coat application rate to be applied 1 88 Coverage aggregate application rate to be placed 1 89 Execution control 1
SECTION 32 05 42
BITUMINOUS CONCRETE TYPE BITUMINOUS
MIXES
90 Control of origin of the bitumen 1 1 91 Control of origin of the aggregates 1 1 92 Control of origin of the filler 1 1 93 Production plant 1 1 94 Job mix formula 1 1 95 Test section 1 1 1 96 Paving plan 1 97 Production control 1 1
Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 6 of 12
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
C
AT
AL
O
G D
AT
A
C
ER
TI
FI
C
AT
E O
F C
O M
PL
IA
N C
E
SH
O
P D
R
AW
IN
G
S
FI
EL
D R
EP
O
R
TS
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
C O
LO
R
S
EL
EC
TI
O N
SC
H
ED
U
LE
S, L
IS
TI
N
G S, R
EP
O R
TS
, P
LA
N
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N
TE
ST
R
EP
O R
TS
PROJECT TITLE
CNS PARKING LOT
PROJECT NUMBER
QUUG 03-1004
(To be completed by Contract Administrator)
SOLICITATION / CONTRACT NO.
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
TE
C
H N
IC
AL
D
AT
A
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
98 Placing and compaction control 1 99 Acceptance control 1
SECTION 32 07 00
PAVEMENT MARKINGS
100 CE cetification of the paint 1 101 CE cetification of the glass microspheres 1 102 Signing system during the painting 1 103 Tests of verification 1
SECTION 32 07 01
RETROREFELCTIVE TRAFFIC SIGNS
104 CE certification of the sign 1 105 Signing system during the installation 1
SECTION 33 30 00
SANITARY SEWAGE
106 Manufacturer Drawings and Datasheets for Tubes and Fittings 1 1
107 Pipes and Fittings 1 108 Pipe Joints Materials 1 109 Precast concrete manhole sections 1 110 Cast iron frame covers 1
SECTION 33 71 02
UNDERGROUND ELECTRICAL DISTRIBUTION
111 600 Volt Wires and Cables, Conduit 1 1 112 Grounding Electrodes and Systems Field Acceptance
Checks and Tests 1 1 113 Hand hole for Ground Readings with Cover 1 1 114 Electrical Hand hole for Cabling with Cover 1 1
Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 7 de 12
APROBADO DESAPROBADO
SECCIÓN 01 11 01
CONDICIONES GENERALES
01 Warranty letter 1 Recepción+15 Acceptance+15
02 Construction Schedule 1 NTP+7 NTP+7
03 Progress Schedule 1 NTP+10 NTP+10
04 Work Plan 1 NTP+7 NTP+7
05 Mobility Plan 1 NTP+15 NTP+15
06 Project Sign 1 NTP+15 NTP+15
07 Quality Control Plan 1 NTP+15 NTP+15
08 Environmental Protection Plan 1 NTP+15 NTP+15
09 DD Form 1354 1 IF+15 FI+15
10 Waste & construction debris management 1 Inspección Final Final Inspection
11 As-Built drawings 1 IF+15 FI+15
12 Spatial Data 1 As-Built+10 As Built+10
13 Key Staff 1 NTP+15 NTP+15
14 Health and safety Plan 1 NTP+15 NTP +15
SECCIÓN 03 30 00
HORMIGÓN VERTIDO IN SITU Y TOPES DE
RUEDA
15 Materiales de Curado 1 16 Acero para Armaduras 1 17 Barrera de Vapor 1 18 Selladores de Juntas 1 19 Relleno de Juntas 1 20 Aditivos 1
C
ER
TI
FI
C
AD
O D
E C
U M
PL
IM
IE
N
TO
PL
AN
O S
D E
TA
LL
ER
G
AR
AN
TÍ
A D
EL
F
AB
R
IC
AN
TE
D
AT
O S
D E
C
AT
ÁL
O
G O
M U
ES
TR
AS
SE
LE
C C
IÓ
N
D E
C O
LO
R
PR
O
G R
AM
AS
, L
IS
TA
D
O S, IN
FO
R M
ES
, P
LA
N
ES
R
EC
O M
EN
D
AC
IO
N
ES
D
EL
F
AB
R
IC
AN
TE
TÍTULO DE PROYECTO:
CONSTRUCCIÓN DE APARCAMIENTO
NÚMERO PROYECTO:
QUUG 03-1004
(A cumplimentar por administrador del contrato)
SOLICITACIÓN / CONTRATO NO.
FE
C
H A
LÍ
M
IT
E
D E
D
EV
O
LU
C
IÓ
N
N Ú
M
ER
O D
E M
U
ES
TR
A
FECHA NOTIFICACIÓN A
CONTRATISTA
SE
G
U N
D A
PR
ES
EN
TA
C
IÓ
N D
EL
C
O N
TR
AT
IS
TA
AP
R
O
BA
C
IÓ
N F
IN
AL
OBSERVACIONES
FE
C
H A
D E
EN
TR
EG
A
FE
C
H A
R
EC
EP
C
IÓ
N
E N
C O
N
TR
AT
AC
IÓ
N
FE
C
H A
EN
IN
G
EN
IE
R íA C
IV
IL
RESUMEN MUESTRAS DE MATERIAL
(A cumplimentar por el ingeniero del proyecto)
NUMBER OF COPIES REQUIRED
IN
FO
R M
ES
D
E
TR
AB
AJ
O S
D E
C
AM
PO
IN
ST
R U
C C
IO
N
ES
D
E
FU
N C
IO
N
AM
IE
N
TO
D
AT
O S
TÉ
C
N
IC
O S
PR
U
EB
AS
LÍ
N
EA
N
Ú M
ER
O
PARTIDA O DESCRIPCIÓN DE PARTIDA,
REFERENCIA DEL CONTRATO, TIPO DE
PRESENTACIÓN
Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 8 de 12
C
ER
TI
FI
C
AD
O D
E C
U M
PL
IM
IE
N
TO
PL
AN
O S
D E
TA
LL
ER
G
AR
AN
TÍ
A D
EL
F
AB
R
IC
AN
TE
D
AT
O S
D E
C
AT
ÁL
O
G O
M U
ES
TR
AS
SE
LE
C C
IÓ
N
D E
C O
LO
R
PR
O
G R
AM
AS
, L
IS
TA
D
O S, IN
FO
R M
ES
, P
LA
N
ES
R
EC
O M
EN
D
AC
IO
N
ES
D
EL
F
AB
R
IC
AN
TE
TÍTULO DE PROYECTO:
CONSTRUCCIÓN DE APARCAMIENTO
NÚMERO PROYECTO:
QUUG 03-1004
(A cumplimentar por administrador del contrato)
SOLICITACIÓN / CONTRATO NO.
FE
C
H A
LÍ
M
IT
E
D E
D
EV
O
LU
C
IÓ
N
N Ú
M
ER
O D
E M
U
ES
TR
A
FECHA NOTIFICACIÓN A
CONTRATISTA
SE
G
U N
D A
PR
ES
EN
TA
C
IÓ
N D
EL
C
O N
TR
AT
IS
TA
AP
R
O
BA
C
IÓ
N F
IN
AL
OBSERVACIONES
FE
C
H A
D E
EN
TR
EG
A
FE
C
H A
R
EC
EP
C
IÓ
N
E N
C O
N
TR
AT
AC
IÓ
N
FE
C
H A
EN
IN
G
EN
IE
R íA C
IV
IL
RESUMEN MUESTRAS DE MATERIAL
(A cumplimentar por el ingeniero del proyecto)
NUMBER OF COPIES REQUIRED
IN
FO
R M
ES
D
E
TR
AB
AJ
O S
D E
C
AM
PO
IN
ST
R U
C C
IO
N
ES
D
E
FU
N C
IO
N
AM
IE
N
TO
D
AT
O S
TÉ
C
N
IC
O S
PR
U
EB
AS
LÍ
N
EA
N
Ú M
ER
O
PARTIDA O DESCRIPCIÓN DE PARTIDA,
REFERENCIA DEL CONTRATO, TIPO DE
PRESENTACIÓN
21 Bordillos de Hormigón Pre-moldeado 1 22 Topes de Rueda de Goma Reciclada 1 23 Caz de Drenaje de Hormigón 1 24 Ensayos de Resistencia a la Compresión 1
SECCIÓN 05 12 00
ACERO ESTRUCTURAL
25 Cálculos justificativos de la estructura pre-dimensionada 1
26 Planos de Fabricación 1 27 Imprimación de Taller 1 28 Certificado de Acero 1 29 Certificado de Pernos, Tuercas y Arandelas 1 30 Certificado de Imprimación de Taller 1 31 Certificado de Electrodos de Soldadura 1 32 Certificado de Mortero sin Retracción 1 33 Plan de Montaje 1 34 Procedimientos y cualificaciones de soldadura 1 35 Fabricación de Cubierta de Chapa Metálica 1
SECCIÓN 09 90 00
PINTURAS Y REVESTIMIENTOS
36 Recubrimiento 1 37 Color 1 38 Instrucciones de Aplicación de la Pintura 1 39 Mezclado de Pintura 1 40 Hojas de Datos de Seguridad de los Materiales 1 41 Recubrimientos 1
Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 9 de 12
C
ER
TI
FI
C
AD
O D
E C
U M
PL
IM
IE
N
TO
PL
AN
O S
D E
TA
LL
ER
G
AR
AN
TÍ
A D
EL
F
AB
R
IC
AN
TE
D
AT
O S
D E
C
AT
ÁL
O
G O
M U
ES
TR
AS
SE
LE
C C
IÓ
N
D E
C O
LO
R
PR
O
G R
AM
AS
, L
IS
TA
D
O S, IN
FO
R M
ES
, P
LA
N
ES
R
EC
O M
EN
D
AC
IO
N
ES
D
EL
F
AB
R
IC
AN
TE
TÍTULO DE PROYECTO:
CONSTRUCCIÓN DE APARCAMIENTO
NÚMERO PROYECTO:
QUUG 03-1004
(A cumplimentar por administrador del contrato)
SOLICITACIÓN / CONTRATO NO.
FE
C
H A
LÍ
M
IT
E
D E
D
EV
O
LU
C
IÓ
N
N Ú
M
ER
O D
E M
U
ES
TR
A
FECHA NOTIFICACIÓN A
CONTRATISTA
SE
G
U N
D A
PR
ES
EN
TA
C
IÓ
N D
EL
C
O N
TR
AT
IS
TA
AP
R
O
BA
C
IÓ
N F
IN
AL
OBSERVACIONES
FE
C
H A
D E
EN
TR
EG
A
FE
C
H A
R
EC
EP
C
IÓ
N
E N
C O
N
TR
AT
AC
IÓ
N
FE
C
H A
EN
IN
G
EN
IE
R íA C
IV
IL
RESUMEN MUESTRAS DE MATERIAL
(A cumplimentar por el ingeniero del proyecto)
NUMBER OF COPIES REQUIRED
IN
FO
R M
ES
D
E
TR
AB
AJ
O S
D E
C
AM
PO
IN
ST
R U
C C
IO
N
ES
D
E
FU
N C
IO
N
AM
IE
N
TO
D
AT
O S
TÉ
C
N
IC
O S
PR
U
EB
AS
LÍ
N
EA
N
Ú M
ER
O
PARTIDA O DESCRIPCIÓN DE PARTIDA,
REFERENCIA DEL CONTRATO, TIPO DE
PRESENTACIÓN
SECCIÓN 26 56 00
ILUMINACIÓN EXTERIOR
42 Tubos y Accesorios 1 1 43 Hilos y Cables 1 1 44 Luminarias de Alumbrado Fluorescente 1 1 45 Reactancias Fluorescentes Electrónicas 1 1 46 Lámparas Fluorescentes 1 1 47 Contactor 1 1 48 Interruptor Fotoeléctrico 1 1 49 Interruptores Automáticos 1 1 50 Panel Eléctrico 1 1 51 Prueba de Funcionamiento 1
SECCIÓN 31 11 00
DESPEJE Y DESBROCE
52 Gestor Autorizado de Residuos RDC Certificate 1 53 Deposito Finalista Certificate 1
SECCIÓN 32 03 30
TERRAPLENES
54 Identificación de suelo tolerable 1 1 55 Control de procedencia del suelo seleccionado 1 1 56 Tramo de prueba del suelo tolerable 1 57 Tramo de prueba del suelo seleccionado 1 58 Plantas 1 59 Control de recepción de suelo tolerable 1 60 Control de recepción de suelo seleccionado 1
Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 10 de 12
C
ER
TI
FI
C
AD
O D
E C
U M
PL
IM
IE
N
TO
PL
AN
O S
D E
TA
LL
ER
G
AR
AN
TÍ
A D
EL
F
AB
R
IC
AN
TE
D
AT
O S
D E
C
AT
ÁL
O
G O
M U
ES
TR
AS
SE
LE
C C
IÓ
N
D E
C O
LO
R
PR
O
G R
AM
AS
, L
IS
TA
D
O S, IN
FO
R M
ES
, P
LA
N
ES
R
EC
O M
EN
D
AC
IO
N
ES
D
EL
F
AB
R
IC
AN
TE
TÍTULO DE PROYECTO:
CONSTRUCCIÓN DE APARCAMIENTO
NÚMERO PROYECTO:
QUUG 03-1004
(A cumplimentar por administrador del contrato)
SOLICITACIÓN / CONTRATO NO.
FE
C
H A
LÍ
M
IT
E
D E
D
EV
O
LU
C
IÓ
N
N Ú
M
ER
O D
E M
U
ES
TR
A
FECHA NOTIFICACIÓN A
CONTRATISTA
SE
G
U N
D A
PR
ES
EN
TA
C
IÓ
N D
EL
C
O N
TR
AT
IS
TA
AP
R
O
BA
C
IÓ
N F
IN
AL
OBSERVACIONES
FE
C
H A
D E
EN
TR
EG
A
FE
C
H A
R
EC
EP
C
IÓ
N
E N
C O
N
TR
AT
AC
IÓ
N
FE
C
H A
EN
IN
G
EN
IE
R íA C
IV
IL
RESUMEN MUESTRAS DE MATERIAL
(A cumplimentar por el ingeniero del proyecto)
NUMBER OF COPIES REQUIRED
IN
FO
R M
ES
D
E
TR
AB
AJ
O S
D E
C
AM
PO
IN
ST
R U
C C
IO
N
ES
D
E
FU
N C
IO
N
AM
IE
N
TO
D
AT
O S
TÉ
C
N
IC
O S
PR
U
EB
AS
LÍ
N
EA
N
Ú M
ER
O
PARTIDA O DESCRIPCIÓN DE PARTIDA,
REFERENCIA DEL CONTRATO, TIPO DE
PRESENTACIÓN
SECCIÓN 32 04 22
GEOTEXTILES COMO ELEMENTOS DE
SEPARACIÓN Y FILTRO
61 Geotextil 1 1 62 Control de ejecución 1
SECCIÓN 32 05 10
ZAHORRAS
63 Control de procedencia de los áridos 1 1 64 Fórmula de trabajo 1 65 Tramo de pruebas 1 1 1 66 Control de recepción 1
SECCIÓN 32 05 12
SUELOS ESTABILIZADOS IN SITU
67 Superficie subyacente 1 68 Agua 1 1 69 Control de procedencia del cemento 1 1 70 Control de procedencia del suelo 1 1 71 Fórmula de Trabajo 1 72 Tramo de prueba 1 1 1 73 Control de ejecución 1 74 Control de recepción 1
SECCIÓN 32 05 30
RIEGOS DE IMPRIMACIÓN
75 Superficie existente 1 76 Control de procedencia del riego de imprimación 1 1 77 Control de procedencia del árido de cobertura 1 1 78 Dotación del riego de imprimación a aplicar 1
Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 11 de 12
C
ER
TI
FI
C
AD
O D
E C
U M
PL
IM
IE
N
TO
PL
AN
O S
D E
TA
LL
ER
G
AR
AN
TÍ
A D
EL
F
AB
R
IC
AN
TE
D
AT
O S
D E
C
AT
ÁL
O
G O
M U
ES
TR
AS
SE
LE
C C
IÓ
N
D E
C O
LO
R
PR
O
G R
AM
AS
, L
IS
TA
D
O S, IN
FO
R M
ES
, P
LA
N
ES
R
EC
O M
EN
D
AC
IO
N
ES
D
EL
F
AB
R
IC
AN
TE
TÍTULO DE PROYECTO:
CONSTRUCCIÓN DE APARCAMIENTO
NÚMERO PROYECTO:
QUUG 03-1004
(A cumplimentar por administrador del contrato)
SOLICITACIÓN / CONTRATO NO.
FE
C
H A
LÍ
M
IT
E
D E
D
EV
O
LU
C
IÓ
N
N Ú
M
ER
O D
E M
U
ES
TR
A
FECHA NOTIFICACIÓN A
CONTRATISTA
SE
G
U N
D A
PR
ES
EN
TA
C
IÓ
N D
EL
C
O N
TR
AT
IS
TA
AP
R
O
BA
C
IÓ
N F
IN
AL
OBSERVACIONES
FE
C
H A
D E
EN
TR
EG
A
FE
C
H A
R
EC
EP
C
IÓ
N
E N
C O
N
TR
AT
AC
IÓ
N
FE
C
H A
EN
IN
G
EN
IE
R íA C
IV
IL
RESUMEN MUESTRAS DE MATERIAL
(A cumplimentar por el ingeniero del proyecto)
NUMBER OF COPIES REQUIRED
IN
FO
R M
ES
D
E
TR
AB
AJ
O S
D E
C
AM
PO
IN
ST
R U
C C
IO
N
ES
D
E
FU
N C
IO
N
AM
IE
N
TO
D
AT
O S
TÉ
C
N
IC
O S
PR
U
EB
AS
LÍ
N
EA
N
Ú M
ER
O
PARTIDA O DESCRIPCIÓN DE PARTIDA,
REFERENCIA DEL CONTRATO, TIPO DE
PRESENTACIÓN
79 Dotación de árido de cobertura a extender 1 80 Control de ejecución 1
SECCIÓN 32 05 31
RIEGOS DE ADHERENCIA
81 Control de procedencia del riego de adherencia 1 1 82 Dotación del riego de adherencia a aplicar 1 83 Control de ejecución 1 84 Control de recepción tras la colocación de la siguiente capa superior 1
SECCIÓN 32 05 32
RIEGOS DE CURADO
85 Control de procedencia del riego de curado 1 1 86 Control de procedencia del árido de cobertura 1 1 87 Dotación del riego de curado a aplicar 1 88 Dotación de árido de cobertura a extender 1 89 Control de ejecución 1
SECCIÓN 32 05 42
MEZCLAS BITUMINOSAS TIPO HORMIGÓN
BITUMINOSO
90 Control de procedencia del betún 1 1 91 Control de procedencia de los áridos 1 1 92 Control de procedencia del polvo mineral 1 1 93 Central de fabricación 1 1 94 Formula de trabajo 1 1 95 Tramo de prueba 1 1 1 96 Plan de pavimentación 1 97 Control de fabricación 1 1
Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 12 de 12
C
ER
TI
FI
C
AD
O D
E C
U M
PL
IM
IE
N
TO
PL
AN
O S
D E
TA
LL
ER
G
AR
AN
TÍ
A D
EL
F
AB
R
IC
AN
TE
D
AT
O S
D E
C
AT
ÁL
O
G O
M U
ES
TR
AS
SE
LE
C C
IÓ
N
D E
C O
LO
R
PR
O
G R
AM
AS
, L
IS
TA
D
O S, IN
FO
R M
ES
, P
LA
N
ES
R
EC
O M
EN
D
AC
IO
N
ES
D
EL
F
AB
R
IC
AN
TE
TÍTULO DE PROYECTO:
CONSTRUCCIÓN DE APARCAMIENTO
NÚMERO PROYECTO:
QUUG 03-1004
(A cumplimentar por administrador del contrato)
SOLICITACIÓN / CONTRATO NO.
FE
C
H A
LÍ
M
IT
E
D E
D
EV
O
LU
C
IÓ
N
N Ú
M
ER
O D
E M
U
ES
TR
A
FECHA NOTIFICACIÓN A
CONTRATISTA
SE
G
U N
D A
PR
ES
EN
TA
C
IÓ
N D
EL
C
O N
TR
AT
IS
TA
AP
R
O
BA
C
IÓ
N F
IN
AL
OBSERVACIONES
FE
C
H A
D E
EN
TR
EG
A
FE
C
H A
R
EC
EP
C
IÓ
N
E N
C O
N
TR
AT
AC
IÓ
N
FE
C
H A
EN
IN
G
EN
IE
R íA C
IV
IL
RESUMEN MUESTRAS DE MATERIAL
(A cumplimentar por el ingeniero del proyecto)
NUMBER OF COPIES REQUIRED
IN
FO
R M
ES
D
E
TR
AB
AJ
O S
D E
C
AM
PO
IN
ST
R U
C C
IO
N
ES
D
E
FU
N C
IO
N
AM
IE
N
TO
D
AT
O S
TÉ
C
N
IC
O S
PR
U
EB
AS
LÍ
N
EA
N
Ú M
ER
O
PARTIDA O DESCRIPCIÓN DE PARTIDA,
REFERENCIA DEL CONTRATO, TIPO DE
PRESENTACIÓN
98 Control de extensión y compactación 1 99 Control de recepción 1
SECTION 32 07 00
MARCAS VIALES
100 Certificación CE de la pintura 1 101 Certificación CE de las microesferas 1 102 Systema de señaliuzación durante el pintado 1 103 Ensayos de verificación 1
SECTION 32 07 01
RETROREFELCTIVE TRAFFIC SIGNS
104 Certificado CE de la señal 1 105 Sistema de la señalización durante la instalación 1
SECTION 33 30 00
SANITARY SEWAGE
106 Planos Estándar u Hojas de Catalogo del Fabricante de Tuberías y Accesorios 1 1
107 Tuberías y Accesorios 1 108 Materiales de Junta de Tubería 1 109 Secciones de Arquetas de Hormigón Prefabricado 1 110 Tapa de Arqueta de Hierro Fundido 1
SECTION 33 71 02
UNDERGROUND ELECTRICAL DISTRIBUTION
111 Hilos y Cables de 600 voltios, y Tubos 1 1 112 Ensayos y Pruebas de Aceptación en Obra de
Sistemas y Picas de Puesta de Tierra 1 1 113 Arquetas para Lecturas de Tierra con Tapa 1 1 114 Arqueta Eléctrica para Paso de Cables con Tapa 1 1
| Material Submittals Schedule |
| MSS Spanish |