Schedule of Material Submittals.pdf

PDF 161 KB Posted

Attached to
CNS PARKING LOT Federal contract opportunity
Solicitation number
FA557520B0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This is a solicitation for a construction project to repair and expand a security forces parking lot at a U.S. Air Force base in Spain. The project scope includes installing bollards, removing a sewage line, constructing storm drainage, culverts, rip-rap, concrete drainage channels and curbs, sidewalks, a concrete drainage ditch and parking row cover, wheel stop bumpers, traffic signs, power distribution, lighting and a grounding system, relocating trees and shrubs, and painting markings and seeding. The estimated value is between $250,000 and $500,000. A pre-proposal conference will be held on January 27, 2020, and bids must be received by February 13, 2020. In accordance with agreements between the U.S. and Spain, Spanish materials, labor and equipment must be used where feasible. The solicitation notes that funds are not presently available and no award will be made until funding is in place. The Department of the Air Force and United States Air Forces in Europe - Air Forces Africa are the contracting agencies.

View the file

Other files for this federal contract opportunity

Other files attached to CNS PARKING LOT, newest first.
File Type Posted
Questions and Answers.pdf PDF
Solicitation Amendment FA557520B00010001- SF 30.pdf PDF
Specifications, Revision 01, Spanish.pdf PDF
Memorandum for Contractors.pdf PDF
Drawings, Revision 01.pdf PDF
Sepcifications, Revision 01, English.pdf PDF
Drawings.pdf PDF
Specifications, Spanish.pdf PDF
Specifications, English.pdf PDF
Solicitation FA557520B0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 1 of 12

APPROVED DISAPPROVED

SECTION 01 11 01

GENERAL CONDITIONS

01 Warranty letter 1 Acceptance+15

02 Construction Schedule 1 NTP+7

03 Progress Schedule 1 NTP+10

04 Work Plan 1 NTP+7

05 Mobility Plan 1 NTP+15

06 Project Sign 1 NTP+15

07 Quality Control Plan 1 NTP+15

08 Environmental Protection Plan 1 NTP+15

09 DD Form 1354 1 FI+15

10 Waste & construction debris management 1 Final Inspection

11 As-Built drawings 1 FI+15

12 Spatial Data 1 As Built+10

13 Key Staff 1 NTP+15

14 Health and safety Plan 1 NTP +15

SECTION 03 30 00

CAST-IN-PLACE CONCRETE AND WHEEL STOPS

15 Curing Materials 1 16 Reinforcing Steel 1 17 Vapor Barrier 1 18 Joint Sealants 1 19 Joint Filler 1 20 Admixture 1

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

C

AT

AL

O

G D

AT

A

C

ER

TI

FI

C

AT

E O

F C

O M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

C O

LO

R

S

EL

EC

TI

O N

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

, P

LA

N

S

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

TE

ST

R

EP

O R

TS

PROJECT TITLE

CNS PARKING LOT

PROJECT NUMBER

QUUG 03-1004

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

TE

C

H N

IC

AL

D

AT

A

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

SA

M

PL

ES

Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 2 of 12

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

C

AT

AL

O

G D

AT

A

C

ER

TI

FI

C

AT

E O

F C

O M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

C O

LO

R

S

EL

EC

TI

O N

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

, P

LA

N

S

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

TE

ST

R

EP

O R

TS

PROJECT TITLE

CNS PARKING LOT

PROJECT NUMBER

QUUG 03-1004

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

TE

C

H N

IC

AL

D

AT

A

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

SA

M

PL

ES

21 Precast Concrete Curbs 1 22 Rubber Wheel Stops 1 23 Horizontal Drain Concrete Curb (Caz) 1 24 Compressive Strength Tests 1

SECTION 05 12 00

STRUCTURAL STEEL

25 Pre-engineered Steel System Structural Calculation 1 26 Fabrication Drawings 1 27 Shop Primer Product Data 1 28 Steel Certificate 1 29 Bolts, Nuts, and Washers Certificates 1 30 Shop Primer Certificate 1 31 Welding Electrodes and Rods Certificates 1 32 Nonshrink Grout Certificate 1 33 Assembly Plan 1 34 Welding Procedures and Qualifications 1 35 Manufacturer's Shed Steel Plate Cover 1

SECTION 09 90 00

PAINTS AND COATINGS

36 Coating 1 37 Color Samples 1 38 Paint Application Instructions 1 39 Paint Mixing 1 40 Coating, Solvent or Potentially Hazardous Materials

Safety Data Sheet 1

Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 3 of 12

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

C

AT

AL

O

G D

AT

A

C

ER

TI

FI

C

AT

E O

F C

O M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

C O

LO

R

S

EL

EC

TI

O N

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

, P

LA

N

S

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

TE

ST

R

EP

O R

TS

PROJECT TITLE

CNS PARKING LOT

PROJECT NUMBER

QUUG 03-1004

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

TE

C

H N

IC

AL

D

AT

A

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

SA

M

PL

ES

41 Coatings 1

SECTION 26 56 00

EXTERIOR LIGHTING

42 Conduits and fittings 1 1 43 Wires and cables 1 1 44 Fluorescent Lighting Fixtures 1 1 45 Fluorescent Electronic Ballasts 1 1 46 Fluorescent Lamps 1 1 47 Lighting Contactor 1 1 48 Photocell switch 1 1 49 Circuit breaker 1 1 50 Electrical Panel 1 1 51 Operating Tests 1

SECTION 31 11 00

CLEARING AND GRUBBING

52 "Gestor Autorizado de Residuos" RDC Certificate 1 53 Landfill Certificate 1

SECTION 32 03 30

EMBANKMENTS

54 Tolerable soil identification 1 1 55 Selected soil origin control 1 1 56 Tolerable soil test section 1 57 Selected soil test section 1 58 Plan 1 59 Tolerable soil acceptance control 1 60 Selected soil acceptance control 1

Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 4 of 12

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

C

AT

AL

O

G D

AT

A

C

ER

TI

FI

C

AT

E O

F C

O M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

C O

LO

R

S

EL

EC

TI

O N

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

, P

LA

N

S

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

TE

ST

R

EP

O R

TS

PROJECT TITLE

CNS PARKING LOT

PROJECT NUMBER

QUUG 03-1004

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

TE

C

H N

IC

AL

D

AT

A

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

SA

M

PL

ES

SECTION 32 04 22

GEOTEXTILES AS SEPARATION AND FILTER

ELEMENTS

61 Geotextile 1 1 62 Execution control 1

SECTION 32 05 10

AGGREGATES

63 Aggregates origin control 1 1 64 Job mix formula 1 65 Test section 1 1 1 66 Acceptance control 1

SECTION 32 05 12

SOILS STABILIZED IN SITU

67 Underlaying surface 1 68 Water 1 1 69 Cement origin control 1 1 70 Soil origin control 1 1 71 Job Mix Formula 1 72 Test section 1 1 1 73 Execution control 1 74 Acceptance control 1

SECTION 32 05 30

PRIME COAT

75 Existing surface 1 76 Prime coat origin control 1 1 77 Coverage aggregate origin control 1 1 78 Prime coat application rate to be applied 1

Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 5 of 12

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

C

AT

AL

O

G D

AT

A

C

ER

TI

FI

C

AT

E O

F C

O M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

C O

LO

R

S

EL

EC

TI

O N

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

, P

LA

N

S

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

TE

ST

R

EP

O R

TS

PROJECT TITLE

CNS PARKING LOT

PROJECT NUMBER

QUUG 03-1004

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

TE

C

H N

IC

AL

D

AT

A

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

SA

M

PL

ES

79 Coverage aggregate application rate to be placed 1 80 Execution control 1

SECTION 32 05 31

TACK COAT

81 Tack coat origin control 1 1 82 Tack coat application rate to be applied 1 83 Execution control 1 84 Acceptance control after the placing of the next layer on top 1

SECTION 32 05 32

CURING COAT

85 Curing coat origin control 1 1 86 Coverage aggregate origin control 1 1 87 Curing coat application rate to be applied 1 88 Coverage aggregate application rate to be placed 1 89 Execution control 1

SECTION 32 05 42

BITUMINOUS CONCRETE TYPE BITUMINOUS

MIXES

90 Control of origin of the bitumen 1 1 91 Control of origin of the aggregates 1 1 92 Control of origin of the filler 1 1 93 Production plant 1 1 94 Job mix formula 1 1 95 Test section 1 1 1 96 Paving plan 1 97 Production control 1 1

Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page 6 of 12

SCHEDULE OF MATERIAL SUBMITTALS

(To be completed by Project Engineer)

NUMBER OF COPIES REQUIRED

C

AT

AL

O

G D

AT

A

C

ER

TI

FI

C

AT

E O

F C

O M

PL

IA

N C

E

SH

O

P D

R

AW

IN

G

S

FI

EL

D R

EP

O

R

TS

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

C O

LO

R

S

EL

EC

TI

O N

SC

H

ED

U

LE

S, L

IS

TI

N

G S, R

EP

O R

TS

, P

LA

N

S

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N

TE

ST

R

EP

O R

TS

PROJECT TITLE

CNS PARKING LOT

PROJECT NUMBER

QUUG 03-1004

(To be completed by Contract Administrator)

SOLICITATION / CONTRACT NO.

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

REMARKS

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

TE

C

H N

IC

AL

D

AT

A

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

SA

M

PL

ES

98 Placing and compaction control 1 99 Acceptance control 1

SECTION 32 07 00

PAVEMENT MARKINGS

100 CE cetification of the paint 1 101 CE cetification of the glass microspheres 1 102 Signing system during the painting 1 103 Tests of verification 1

SECTION 32 07 01

RETROREFELCTIVE TRAFFIC SIGNS

104 CE certification of the sign 1 105 Signing system during the installation 1

SECTION 33 30 00

SANITARY SEWAGE

106 Manufacturer Drawings and Datasheets for Tubes and Fittings 1 1

107 Pipes and Fittings 1 108 Pipe Joints Materials 1 109 Precast concrete manhole sections 1 110 Cast iron frame covers 1

SECTION 33 71 02

UNDERGROUND ELECTRICAL DISTRIBUTION

111 600 Volt Wires and Cables, Conduit 1 1 112 Grounding Electrodes and Systems Field Acceptance

Checks and Tests 1 1 113 Hand hole for Ground Readings with Cover 1 1 114 Electrical Hand hole for Cabling with Cover 1 1

Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 7 de 12

APROBADO DESAPROBADO

SECCIÓN 01 11 01

CONDICIONES GENERALES

01 Warranty letter 1 Recepción+15 Acceptance+15

02 Construction Schedule 1 NTP+7 NTP+7

03 Progress Schedule 1 NTP+10 NTP+10

04 Work Plan 1 NTP+7 NTP+7

05 Mobility Plan 1 NTP+15 NTP+15

06 Project Sign 1 NTP+15 NTP+15

07 Quality Control Plan 1 NTP+15 NTP+15

08 Environmental Protection Plan 1 NTP+15 NTP+15

09 DD Form 1354 1 IF+15 FI+15

10 Waste & construction debris management 1 Inspección Final Final Inspection

11 As-Built drawings 1 IF+15 FI+15

12 Spatial Data 1 As-Built+10 As Built+10

13 Key Staff 1 NTP+15 NTP+15

14 Health and safety Plan 1 NTP+15 NTP +15

SECCIÓN 03 30 00

HORMIGÓN VERTIDO IN SITU Y TOPES DE

RUEDA

15 Materiales de Curado 1 16 Acero para Armaduras 1 17 Barrera de Vapor 1 18 Selladores de Juntas 1 19 Relleno de Juntas 1 20 Aditivos 1

C

ER

TI

FI

C

AD

O D

E C

U M

PL

IM

IE

N

TO

PL

AN

O S

D E

TA

LL

ER

G

AR

AN

TÍ

A D

EL

F

AB

R

IC

AN

TE

D

AT

O S

D E

C

AT

ÁL

O

G O

M U

ES

TR

AS

SE

LE

C C

IÓ

N

D E

C O

LO

R

PR

O

G R

AM

AS

, L

IS

TA

D

O S, IN

FO

R M

ES

, P

LA

N

ES

R

EC

O M

EN

D

AC

IO

N

ES

D

EL

F

AB

R

IC

AN

TE

TÍTULO DE PROYECTO:

CONSTRUCCIÓN DE APARCAMIENTO

NÚMERO PROYECTO:

QUUG 03-1004

(A cumplimentar por administrador del contrato)

SOLICITACIÓN / CONTRATO NO.

FE

C

H A

LÍ

M

IT

E

D E

D

EV

O

LU

C

IÓ

N

N Ú

M

ER

O D

E M

U

ES

TR

A

FECHA NOTIFICACIÓN A

CONTRATISTA

SE

G

U N

D A

PR

ES

EN

TA

C

IÓ

N D

EL

C

O N

TR

AT

IS

TA

AP

R

O

BA

C

IÓ

N F

IN

AL

OBSERVACIONES

FE

C

H A

D E

EN

TR

EG

A

FE

C

H A

R

EC

EP

C

IÓ

N

E N

C O

N

TR

AT

AC

IÓ

N

FE

C

H A

EN

IN

G

EN

IE

R íA C

IV

IL

RESUMEN MUESTRAS DE MATERIAL

(A cumplimentar por el ingeniero del proyecto)

NUMBER OF COPIES REQUIRED

IN

FO

R M

ES

D

E

TR

AB

AJ

O S

D E

C

AM

PO

IN

ST

R U

C C

IO

N

ES

D

E

FU

N C

IO

N

AM

IE

N

TO

D

AT

O S

TÉ

C

N

IC

O S

PR

U

EB

AS

LÍ

N

EA

N

Ú M

ER

O

PARTIDA O DESCRIPCIÓN DE PARTIDA,

REFERENCIA DEL CONTRATO, TIPO DE

PRESENTACIÓN

Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 8 de 12

C

ER

TI

FI

C

AD

O D

E C

U M

PL

IM

IE

N

TO

PL

AN

O S

D E

TA

LL

ER

G

AR

AN

TÍ

A D

EL

F

AB

R

IC

AN

TE

D

AT

O S

D E

C

AT

ÁL

O

G O

M U

ES

TR

AS

SE

LE

C C

IÓ

N

D E

C O

LO

R

PR

O

G R

AM

AS

, L

IS

TA

D

O S, IN

FO

R M

ES

, P

LA

N

ES

R

EC

O M

EN

D

AC

IO

N

ES

D

EL

F

AB

R

IC

AN

TE

TÍTULO DE PROYECTO:

CONSTRUCCIÓN DE APARCAMIENTO

NÚMERO PROYECTO:

QUUG 03-1004

(A cumplimentar por administrador del contrato)

SOLICITACIÓN / CONTRATO NO.

FE

C

H A

LÍ

M

IT

E

D E

D

EV

O

LU

C

IÓ

N

N Ú

M

ER

O D

E M

U

ES

TR

A

FECHA NOTIFICACIÓN A

CONTRATISTA

SE

G

U N

D A

PR

ES

EN

TA

C

IÓ

N D

EL

C

O N

TR

AT

IS

TA

AP

R

O

BA

C

IÓ

N F

IN

AL

OBSERVACIONES

FE

C

H A

D E

EN

TR

EG

A

FE

C

H A

R

EC

EP

C

IÓ

N

E N

C O

N

TR

AT

AC

IÓ

N

FE

C

H A

EN

IN

G

EN

IE

R íA C

IV

IL

RESUMEN MUESTRAS DE MATERIAL

(A cumplimentar por el ingeniero del proyecto)

NUMBER OF COPIES REQUIRED

IN

FO

R M

ES

D

E

TR

AB

AJ

O S

D E

C

AM

PO

IN

ST

R U

C C

IO

N

ES

D

E

FU

N C

IO

N

AM

IE

N

TO

D

AT

O S

TÉ

C

N

IC

O S

PR

U

EB

AS

LÍ

N

EA

N

Ú M

ER

O

PARTIDA O DESCRIPCIÓN DE PARTIDA,

REFERENCIA DEL CONTRATO, TIPO DE

PRESENTACIÓN

21 Bordillos de Hormigón Pre-moldeado 1 22 Topes de Rueda de Goma Reciclada 1 23 Caz de Drenaje de Hormigón 1 24 Ensayos de Resistencia a la Compresión 1

SECCIÓN 05 12 00

ACERO ESTRUCTURAL

25 Cálculos justificativos de la estructura pre-dimensionada 1

26 Planos de Fabricación 1 27 Imprimación de Taller 1 28 Certificado de Acero 1 29 Certificado de Pernos, Tuercas y Arandelas 1 30 Certificado de Imprimación de Taller 1 31 Certificado de Electrodos de Soldadura 1 32 Certificado de Mortero sin Retracción 1 33 Plan de Montaje 1 34 Procedimientos y cualificaciones de soldadura 1 35 Fabricación de Cubierta de Chapa Metálica 1

SECCIÓN 09 90 00

PINTURAS Y REVESTIMIENTOS

36 Recubrimiento 1 37 Color 1 38 Instrucciones de Aplicación de la Pintura 1 39 Mezclado de Pintura 1 40 Hojas de Datos de Seguridad de los Materiales 1 41 Recubrimientos 1

Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 9 de 12

C

ER

TI

FI

C

AD

O D

E C

U M

PL

IM

IE

N

TO

PL

AN

O S

D E

TA

LL

ER

G

AR

AN

TÍ

A D

EL

F

AB

R

IC

AN

TE

D

AT

O S

D E

C

AT

ÁL

O

G O

M U

ES

TR

AS

SE

LE

C C

IÓ

N

D E

C O

LO

R

PR

O

G R

AM

AS

, L

IS

TA

D

O S, IN

FO

R M

ES

, P

LA

N

ES

R

EC

O M

EN

D

AC

IO

N

ES

D

EL

F

AB

R

IC

AN

TE

TÍTULO DE PROYECTO:

CONSTRUCCIÓN DE APARCAMIENTO

NÚMERO PROYECTO:

QUUG 03-1004

(A cumplimentar por administrador del contrato)

SOLICITACIÓN / CONTRATO NO.

FE

C

H A

LÍ

M

IT

E

D E

D

EV

O

LU

C

IÓ

N

N Ú

M

ER

O D

E M

U

ES

TR

A

FECHA NOTIFICACIÓN A

CONTRATISTA

SE

G

U N

D A

PR

ES

EN

TA

C

IÓ

N D

EL

C

O N

TR

AT

IS

TA

AP

R

O

BA

C

IÓ

N F

IN

AL

OBSERVACIONES

FE

C

H A

D E

EN

TR

EG

A

FE

C

H A

R

EC

EP

C

IÓ

N

E N

C O

N

TR

AT

AC

IÓ

N

FE

C

H A

EN

IN

G

EN

IE

R íA C

IV

IL

RESUMEN MUESTRAS DE MATERIAL

(A cumplimentar por el ingeniero del proyecto)

NUMBER OF COPIES REQUIRED

IN

FO

R M

ES

D

E

TR

AB

AJ

O S

D E

C

AM

PO

IN

ST

R U

C C

IO

N

ES

D

E

FU

N C

IO

N

AM

IE

N

TO

D

AT

O S

TÉ

C

N

IC

O S

PR

U

EB

AS

LÍ

N

EA

N

Ú M

ER

O

PARTIDA O DESCRIPCIÓN DE PARTIDA,

REFERENCIA DEL CONTRATO, TIPO DE

PRESENTACIÓN

SECCIÓN 26 56 00

ILUMINACIÓN EXTERIOR

42 Tubos y Accesorios 1 1 43 Hilos y Cables 1 1 44 Luminarias de Alumbrado Fluorescente 1 1 45 Reactancias Fluorescentes Electrónicas 1 1 46 Lámparas Fluorescentes 1 1 47 Contactor 1 1 48 Interruptor Fotoeléctrico 1 1 49 Interruptores Automáticos 1 1 50 Panel Eléctrico 1 1 51 Prueba de Funcionamiento 1

SECCIÓN 31 11 00

DESPEJE Y DESBROCE

52 Gestor Autorizado de Residuos RDC Certificate 1 53 Deposito Finalista Certificate 1

SECCIÓN 32 03 30

TERRAPLENES

54 Identificación de suelo tolerable 1 1 55 Control de procedencia del suelo seleccionado 1 1 56 Tramo de prueba del suelo tolerable 1 57 Tramo de prueba del suelo seleccionado 1 58 Plantas 1 59 Control de recepción de suelo tolerable 1 60 Control de recepción de suelo seleccionado 1

Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 10 de 12

C

ER

TI

FI

C

AD

O D

E C

U M

PL

IM

IE

N

TO

PL

AN

O S

D E

TA

LL

ER

G

AR

AN

TÍ

A D

EL

F

AB

R

IC

AN

TE

D

AT

O S

D E

C

AT

ÁL

O

G O

M U

ES

TR

AS

SE

LE

C C

IÓ

N

D E

C O

LO

R

PR

O

G R

AM

AS

, L

IS

TA

D

O S, IN

FO

R M

ES

, P

LA

N

ES

R

EC

O M

EN

D

AC

IO

N

ES

D

EL

F

AB

R

IC

AN

TE

TÍTULO DE PROYECTO:

CONSTRUCCIÓN DE APARCAMIENTO

NÚMERO PROYECTO:

QUUG 03-1004

(A cumplimentar por administrador del contrato)

SOLICITACIÓN / CONTRATO NO.

FE

C

H A

LÍ

M

IT

E

D E

D

EV

O

LU

C

IÓ

N

N Ú

M

ER

O D

E M

U

ES

TR

A

FECHA NOTIFICACIÓN A

CONTRATISTA

SE

G

U N

D A

PR

ES

EN

TA

C

IÓ

N D

EL

C

O N

TR

AT

IS

TA

AP

R

O

BA

C

IÓ

N F

IN

AL

OBSERVACIONES

FE

C

H A

D E

EN

TR

EG

A

FE

C

H A

R

EC

EP

C

IÓ

N

E N

C O

N

TR

AT

AC

IÓ

N

FE

C

H A

EN

IN

G

EN

IE

R íA C

IV

IL

RESUMEN MUESTRAS DE MATERIAL

(A cumplimentar por el ingeniero del proyecto)

NUMBER OF COPIES REQUIRED

IN

FO

R M

ES

D

E

TR

AB

AJ

O S

D E

C

AM

PO

IN

ST

R U

C C

IO

N

ES

D

E

FU

N C

IO

N

AM

IE

N

TO

D

AT

O S

TÉ

C

N

IC

O S

PR

U

EB

AS

LÍ

N

EA

N

Ú M

ER

O

PARTIDA O DESCRIPCIÓN DE PARTIDA,

REFERENCIA DEL CONTRATO, TIPO DE

PRESENTACIÓN

SECCIÓN 32 04 22

GEOTEXTILES COMO ELEMENTOS DE

SEPARACIÓN Y FILTRO

61 Geotextil 1 1 62 Control de ejecución 1

SECCIÓN 32 05 10

ZAHORRAS

63 Control de procedencia de los áridos 1 1 64 Fórmula de trabajo 1 65 Tramo de pruebas 1 1 1 66 Control de recepción 1

SECCIÓN 32 05 12

SUELOS ESTABILIZADOS IN SITU

67 Superficie subyacente 1 68 Agua 1 1 69 Control de procedencia del cemento 1 1 70 Control de procedencia del suelo 1 1 71 Fórmula de Trabajo 1 72 Tramo de prueba 1 1 1 73 Control de ejecución 1 74 Control de recepción 1

SECCIÓN 32 05 30

RIEGOS DE IMPRIMACIÓN

75 Superficie existente 1 76 Control de procedencia del riego de imprimación 1 1 77 Control de procedencia del árido de cobertura 1 1 78 Dotación del riego de imprimación a aplicar 1

Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 11 de 12

C

ER

TI

FI

C

AD

O D

E C

U M

PL

IM

IE

N

TO

PL

AN

O S

D E

TA

LL

ER

G

AR

AN

TÍ

A D

EL

F

AB

R

IC

AN

TE

D

AT

O S

D E

C

AT

ÁL

O

G O

M U

ES

TR

AS

SE

LE

C C

IÓ

N

D E

C O

LO

R

PR

O

G R

AM

AS

, L

IS

TA

D

O S, IN

FO

R M

ES

, P

LA

N

ES

R

EC

O M

EN

D

AC

IO

N

ES

D

EL

F

AB

R

IC

AN

TE

TÍTULO DE PROYECTO:

CONSTRUCCIÓN DE APARCAMIENTO

NÚMERO PROYECTO:

QUUG 03-1004

(A cumplimentar por administrador del contrato)

SOLICITACIÓN / CONTRATO NO.

FE

C

H A

LÍ

M

IT

E

D E

D

EV

O

LU

C

IÓ

N

N Ú

M

ER

O D

E M

U

ES

TR

A

FECHA NOTIFICACIÓN A

CONTRATISTA

SE

G

U N

D A

PR

ES

EN

TA

C

IÓ

N D

EL

C

O N

TR

AT

IS

TA

AP

R

O

BA

C

IÓ

N F

IN

AL

OBSERVACIONES

FE

C

H A

D E

EN

TR

EG

A

FE

C

H A

R

EC

EP

C

IÓ

N

E N

C O

N

TR

AT

AC

IÓ

N

FE

C

H A

EN

IN

G

EN

IE

R íA C

IV

IL

RESUMEN MUESTRAS DE MATERIAL

(A cumplimentar por el ingeniero del proyecto)

NUMBER OF COPIES REQUIRED

IN

FO

R M

ES

D

E

TR

AB

AJ

O S

D E

C

AM

PO

IN

ST

R U

C C

IO

N

ES

D

E

FU

N C

IO

N

AM

IE

N

TO

D

AT

O S

TÉ

C

N

IC

O S

PR

U

EB

AS

LÍ

N

EA

N

Ú M

ER

O

PARTIDA O DESCRIPCIÓN DE PARTIDA,

REFERENCIA DEL CONTRATO, TIPO DE

PRESENTACIÓN

79 Dotación de árido de cobertura a extender 1 80 Control de ejecución 1

SECCIÓN 32 05 31

RIEGOS DE ADHERENCIA

81 Control de procedencia del riego de adherencia 1 1 82 Dotación del riego de adherencia a aplicar 1 83 Control de ejecución 1 84 Control de recepción tras la colocación de la siguiente capa superior 1

SECCIÓN 32 05 32

RIEGOS DE CURADO

85 Control de procedencia del riego de curado 1 1 86 Control de procedencia del árido de cobertura 1 1 87 Dotación del riego de curado a aplicar 1 88 Dotación de árido de cobertura a extender 1 89 Control de ejecución 1

SECCIÓN 32 05 42

MEZCLAS BITUMINOSAS TIPO HORMIGÓN

BITUMINOSO

90 Control de procedencia del betún 1 1 91 Control de procedencia de los áridos 1 1 92 Control de procedencia del polvo mineral 1 1 93 Central de fabricación 1 1 94 Formula de trabajo 1 1 95 Tramo de prueba 1 1 1 96 Plan de pavimentación 1 97 Control de fabricación 1 1

Resumen de muestras de material, Feb 05 (SAF/AQCP) Página 12 de 12

C

ER

TI

FI

C

AD

O D

E C

U M

PL

IM

IE

N

TO

PL

AN

O S

D E

TA

LL

ER

G

AR

AN

TÍ

A D

EL

F

AB

R

IC

AN

TE

D

AT

O S

D E

C

AT

ÁL

O

G O

M U

ES

TR

AS

SE

LE

C C

IÓ

N

D E

C O

LO

R

PR

O

G R

AM

AS

, L

IS

TA

D

O S, IN

FO

R M

ES

, P

LA

N

ES

R

EC

O M

EN

D

AC

IO

N

ES

D

EL

F

AB

R

IC

AN

TE

TÍTULO DE PROYECTO:

CONSTRUCCIÓN DE APARCAMIENTO

NÚMERO PROYECTO:

QUUG 03-1004

(A cumplimentar por administrador del contrato)

SOLICITACIÓN / CONTRATO NO.

FE

C

H A

LÍ

M

IT

E

D E

D

EV

O

LU

C

IÓ

N

N Ú

M

ER

O D

E M

U

ES

TR

A

FECHA NOTIFICACIÓN A

CONTRATISTA

SE

G

U N

D A

PR

ES

EN

TA

C

IÓ

N D

EL

C

O N

TR

AT

IS

TA

AP

R

O

BA

C

IÓ

N F

IN

AL

OBSERVACIONES

FE

C

H A

D E

EN

TR

EG

A

FE

C

H A

R

EC

EP

C

IÓ

N

E N

C O

N

TR

AT

AC

IÓ

N

FE

C

H A

EN

IN

G

EN

IE

R íA C

IV

IL

RESUMEN MUESTRAS DE MATERIAL

(A cumplimentar por el ingeniero del proyecto)

NUMBER OF COPIES REQUIRED

IN

FO

R M

ES

D

E

TR

AB

AJ

O S

D E

C

AM

PO

IN

ST

R U

C C

IO

N

ES

D

E

FU

N C

IO

N

AM

IE

N

TO

D

AT

O S

TÉ

C

N

IC

O S

PR

U

EB

AS

LÍ

N

EA

N

Ú M

ER

O

PARTIDA O DESCRIPCIÓN DE PARTIDA,

REFERENCIA DEL CONTRATO, TIPO DE

PRESENTACIÓN

98 Control de extensión y compactación 1 99 Control de recepción 1

SECTION 32 07 00

MARCAS VIALES

100 Certificación CE de la pintura 1 101 Certificación CE de las microesferas 1 102 Systema de señaliuzación durante el pintado 1 103 Ensayos de verificación 1

SECTION 32 07 01

RETROREFELCTIVE TRAFFIC SIGNS

104 Certificado CE de la señal 1 105 Sistema de la señalización durante la instalación 1

SECTION 33 30 00

SANITARY SEWAGE

106 Planos Estándar u Hojas de Catalogo del Fabricante de Tuberías y Accesorios 1 1

107 Tuberías y Accesorios 1 108 Materiales de Junta de Tubería 1 109 Secciones de Arquetas de Hormigón Prefabricado 1 110 Tapa de Arqueta de Hierro Fundido 1

SECTION 33 71 02

UNDERGROUND ELECTRICAL DISTRIBUTION

111 Hilos y Cables de 600 voltios, y Tubos 1 1 112 Ensayos y Pruebas de Aceptación en Obra de

Sistemas y Picas de Puesta de Tierra 1 1 113 Arquetas para Lecturas de Tierra con Tapa 1 1 114 Arqueta Eléctrica para Paso de Cables con Tapa 1 1

Material Submittals Schedule
MSS Spanish

File details come from the government source that posted it. Updated .