Attachment_3_-_Pricing_Schedule.xls
XLS spreadsheet 34 KB Posted
- Attached to
- DFAC Boiler Replace Federal contract opportunity
- Solicitation number
- FA5575-18-Q-0002
About this file
Attachment 3 - Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_18-Q-0002_-__DFAC_Boiler_Replace.pdf | ||
| FA5575-18-Q-0002_-__DFAC_Boiler_Replace_-_RFQ.pdf | ||
| Attachment_1_-_PWS_18116_Replace_DFAC_Boilers.pdf | ||
| Attachment_2_-_ROT_18116_Sustituir_DFAC_Calderas.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor
| Attachment 3 - Pricing Schedule | ||||||||||
| CONTRACTOR: | ADDRESS: | |||||||||
| CONTRACT FOR (Work to be performed): | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPL BOILERS AT DFAC | 0.00 € | |||||||||
| PERIOD OF PERFORMANCE: | WORK ORDER NUMBER: | WORK LOCATION: | ||||||||
| QUOTE EXPIRATION: | 18116 | MORON AIR BASE, SPAIN | ||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Removal existing Boilers | |||||||||
| Ls | ||||||||||
| 2 | Removal existing Water Softener | |||||||||
| Ls | ||||||||||
| 3 | Boiler OMNIVAP 2.00, Pressure body, Thermal Isolation | |||||||||
| and cleaning handtools | Ea | |||||||||
| 4 | Electric Panelboard 3x208x60 Hz | |||||||||
| Ea | ||||||||||
| 5 | CE Labeled according Air Force Instruction 32-1068 | |||||||||
| Ls | ||||||||||
| 6 | Globe Valves PN16/40 ARI (Water/Steam/Aeration/Draining) | |||||||||
| Ls | ||||||||||
| 7 | Automatic Bottom Mud Blowdown (Safety Integrity Level: Sil 3) GESTRA MPA | |||||||||
| Ls | ||||||||||
| 8 | Check Valves RK 86 DN-32 GESTRA | |||||||||
| Ls | ||||||||||
| 9 | Safety level & Control Level System SIL 3 | |||||||||
| Ls | ||||||||||
| 10 | Pressure Gauges Manifold including: Manometer, pressure transmitter, safety PS, operating PS, needle valve | |||||||||
| Ls | ||||||||||
| 11 | Pump 3x208V 60Hz, on boiler frame including accessories: transducers, valves and manometers | |||||||||
| Ls | ||||||||||
| 12 | Automatic Bottom Salt Blowdown PN40 DN20 (Safety Integrity Level: Sil 3) GESTRA | |||||||||
| Ls | ||||||||||
| 13 | Sampling Cooler Gestra PK-40 NS | |||||||||
| Ls | ||||||||||
| 14 | Burner TK7/150 60 Hz Modulated by Tekener. Fuel consumption 150 Kg/h | |||||||||
| Ls | ||||||||||
| 15 | Water Softener Twin Version, 2 resine bottles 125 liters each, plus 250 liters of cationic resin | |||||||||
| Ea | ||||||||||
| 16 | Water Softener Twin Version, 2 resine bottles 125 liters each, plus 250 liters of cationic resin & electronic devices | |||||||||
| Ea | ||||||||||
| 17 | Start up | |||||||||
| OCA Revision type C | Ea | |||||||||
| 18 | Documents, as-builts and miscellaneous | |||||||||
| Ls | ||||||||||
| TOTAL | ||||||||||
| DATE: | FIRM NAME: | DUNS: | ||||||||
| TITLE: | BY: | |||||||||
| NOTE: The individual signing must be a signatory official for this Entity; signature constitutes agreement to all terms/conditions contained within this solicitation. Please provide quotes in Euros. |
&L&"Times New Roman,Regular"AF Form 3052 (Computer Generated)&C&"Times New Roman,Bold"FOR OFFICIAL USE ONLY&R&"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it.