13-1008_CONSTRUCTION_COST_ESTIMATE_BREAKDOWN_KTOR.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- Toddler Swimming Pool Repair Federal contract opportunity
- Solicitation number
- FA5575-17-R-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 13-1008_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| FA5575-17-R-0004.pdf | ||
| 13-1008_English_Spec01.pdf | ||
| 13-1008_Spanish_Spec01.pdf | ||
| DRAWINGS_13-1008.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KTOR
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||
| CONTRACTOR | ADDRESS | |
| MORÓN AIR BASE, SPAIN | ||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE |
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 13-1008 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ARCHITECTURAL WORKS | ||||||||||
| TRABAJOS DE ARQUITECTURA |
| Demolition Work | ||
| Trabajos de Demolición | ||
| 1 | Utilities disconnection | |
| Desconexión de sistemas | JOB | |
| 2 | Remove ceramic tile from the swimming pool basin/deck | |
| Eliminar plaquetas cerámicas del vaso y plataforma | m² | |
| 3 | Remove cement mortar and adhsive layer to concrete | |
| Eliminar mortero y adhesivo hasta el hormigón | m² | |
| 4 | Remove sealant from swimming pool basin & deck | |
| Eliminar sellantes del vaso y plataforma de piscina | JOB | |
| 5 | Remove floor drains and swimming pool accessories | |
| Eliminar drenajes y accesorios de la piscina | EA | |
| 6 | Demolish concrete floor slab from the pool deck | |
| Demoler solera hormigón de la plataforma | m² | |
| 7 | Separate, load and transport the waste to authorized dump | |
| Separar, cargar y transportar residuos a vertedero autor | JOB | |
| Total Demoliton Work | ||
| Total Trabajos de Demolición |
| Concrete Works | ||
| Trabajos de Hormigón | ||
| 8 | Apply repair mortar to concrete surfaces | |
| Aplicar mortero de reparación a sup. de hormigón | m² | |
| 9 | Repair and seal the holes around the intake pipes | |
| Reparar y sellar perforaciones de tubos de entrada | EA | |
| 10 | Clean and repair cracks in concrete surfaces | |
| Limpiar y reparar grietas en superficie de hormigón | JOB | |
| 11 | Pour concrete to convert the step into a slope | |
| Convertir escalón en rampa con hormigón | EA | |
| 12 | Pour concrete for pool deck floor slab | |
| Puesta en obra hormigón para plataforma de piscina | m² | |
| 13 | Install profiles & concrete for a new manhole cover | |
| Instalar perfiles y hormigón para nueva tapa de arqueta | EA | |
| 14 | Install screed coat of high mortar floor and top wall | |
| Instalar mortero de recrecido para suelo y muretes | m² | |
| Total Concrete Works | ||
| Total Trabajos de Hormigón |
| Sealants | ||
| Sellantes | ||
| 15 | Install elastic sealant band in basin joints | |
| Instalar banda sellante elástica en juntas del vaso | Lm | |
| 16 | Install sealant material in basin and deck joints | |
| Instalar sellante en juntas del vaso y plataforma | Lm | |
| Total Sealants | ||
| Total sellantes |
| Finishes Works | ||
| Trabajos de Acabados | ||
| 17 | Apply fast dry time mortar for rendering wall surfaces | |
| Instalar mortero de secado rápido maestreado en muros | EA | |
| 18 | Apply two coasts of waterproof mortar to pool and deck | |
| Aplicar dos capas mortero impermeabil. Piscina y plataf | Lm | |
| 19 | Fix ceramic tile to swimming pool wall surfaces | |
| Fijar plaquetas en superficies de muros de la piscina | m² | |
| 20 | Fix ceramic non-skid tile to swimming pool floor surfaces | |
| Fijar plaquetas antideslizante en suelo de piscina | m² | |
| 20 | Fix special tile to the top of the front walls of the basin | |
| Fijar piezas especiales en coronación de muretes | Lm | |
| 21 | Fix non-skid ceramic floor tiles and baseboards | |
| Fijar rodapiés y solería antideslizante en suelo | m² | |
| 22 | Install caution and depth sign on basin and deck | |
| Instalar señales de precaución y profund en pisc y plataf. | JOB | |
| Total Finishes | ||
| Total Trabajos de Acabados |
| Miscellaneous | ||
| Trabajos Varios | ||
| 23 | Replace pvc pipes for filtering end-pipes as needed | |
| Reemplazar extremos de tuberias PVC de filtrado | EA | |
| 24 | Install new inlet jet and suction nozzles | |
| Instalar nuevas boquillas de impulsion y retorno | EA | |
| 25 | Install new stainless steel floor drainage | |
| Instalar nuevos sumideros de acero inox en plataforma | EA | |
| Replace PVC filtering-inlet-drainage lines | ||
| Reemplazar lineas de filtrado-llenado-drenaje de PVC | EA | |
| Provide a pressure test in the filtering-inlet PVC lines | ||
| Realizar test de estanqueidad linea filtrado-llenado PVC | JOB | |
| Total Miscellaneous | ||
| Total Trabajos Varios |
| ARCHITECTURAL WORK |
| RESUMEN TRABAJOS DE ARQUITECTURA |
| Demolition Works |
| Trabajos de Demolición |
| Concrete Works |
| Trabajos de Hormigón |
| Sealants |
| Sellantes |
| Finishes Works |
| Trabajos de Acabados |
| Miscellaneous Works |
| Trabajos varios |
| TOTAL ARCHITECTURAL |
| TOTAL TRABAJOS DE ARQUITECTURA |
| SUMMARY |
| RESUMEN |
| TOTAL ARCHITECTURAL WORK |
| TOTAL TRABAJOS ARQUITECTURA |
| GRAND TOTAL |
| GRAN TOTAL |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD
SUBTOTAL
PROFIT
TOTAL PROJECT EUROS
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N