13-1008_CONSTRUCTION_COST_ESTIMATE_BREAKDOWN_KTOR.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Toddler Swimming Pool Repair Federal contract opportunity
Solicitation number
FA5575-17-R-0004
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Toddler Swimming Pool Repair, newest first.
File Type Posted
13-1008_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
FA5575-17-R-0004.pdf PDF
13-1008_English_Spec01.pdf PDF
13-1008_Spanish_Spec01.pdf PDF
DRAWINGS_13-1008.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTOR

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 13-1008MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ARCHITECTURAL WORKS
TRABAJOS DE ARQUITECTURA
Demolition Work
Trabajos de Demolición
1Utilities disconnection
Desconexión de sistemasJOB
2Remove ceramic tile from the swimming pool basin/deck
Eliminar plaquetas cerámicas del vaso y plataformam²
3Remove cement mortar and adhsive layer to concrete
Eliminar mortero y adhesivo hasta el hormigónm²
4Remove sealant from swimming pool basin & deck
Eliminar sellantes del vaso y plataforma de piscinaJOB
5Remove floor drains and swimming pool accessories
Eliminar drenajes y accesorios de la piscinaEA
6Demolish concrete floor slab from the pool deck
Demoler solera hormigón de la plataformam²
7Separate, load and transport the waste to authorized dump
Separar, cargar y transportar residuos a vertedero autorJOB
Total Demoliton Work
Total Trabajos de Demolición
Concrete Works
Trabajos de Hormigón
8Apply repair mortar to concrete surfaces
Aplicar mortero de reparación a sup. de hormigónm²
9Repair and seal the holes around the intake pipes
Reparar y sellar perforaciones de tubos de entradaEA
10Clean and repair cracks in concrete surfaces
Limpiar y reparar grietas en superficie de hormigónJOB
11Pour concrete to convert the step into a slope
Convertir escalón en rampa con hormigónEA
12Pour concrete for pool deck floor slab
Puesta en obra hormigón para plataforma de piscinam²
13Install profiles & concrete for a new manhole cover
Instalar perfiles y hormigón para nueva tapa de arquetaEA
14Install screed coat of high mortar floor and top wall
Instalar mortero de recrecido para suelo y muretesm²
Total Concrete Works
Total Trabajos de Hormigón
Sealants
Sellantes
15Install elastic sealant band in basin joints
Instalar banda sellante elástica en juntas del vasoLm
16Install sealant material in basin and deck joints
Instalar sellante en juntas del vaso y plataformaLm
Total Sealants
Total sellantes
Finishes Works
Trabajos de Acabados
17Apply fast dry time mortar for rendering wall surfaces
Instalar mortero de secado rápido maestreado en murosEA
18Apply two coasts of waterproof mortar to pool and deck
Aplicar dos capas mortero impermeabil. Piscina y platafLm
19Fix ceramic tile to swimming pool wall surfaces
Fijar plaquetas en superficies de muros de la piscinam²
20Fix ceramic non-skid tile to swimming pool floor surfaces
Fijar plaquetas antideslizante en suelo de piscinam²
20Fix special tile to the top of the front walls of the basin
Fijar piezas especiales en coronación de muretesLm
21Fix non-skid ceramic floor tiles and baseboards
Fijar rodapiés y solería antideslizante en suelom²
22Install caution and depth sign on basin and deck
Instalar señales de precaución y profund en pisc y plataf.JOB
Total Finishes
Total Trabajos de Acabados
Miscellaneous
Trabajos Varios
23Replace pvc pipes for filtering end-pipes as needed
Reemplazar extremos de tuberias PVC de filtradoEA
24Install new inlet jet and suction nozzles
Instalar nuevas boquillas de impulsion y retornoEA
25Install new stainless steel floor drainage
Instalar nuevos sumideros de acero inox en plataformaEA
Replace PVC filtering-inlet-drainage lines
Reemplazar lineas de filtrado-llenado-drenaje de PVCEA
Provide a pressure test in the filtering-inlet PVC lines
Realizar test de estanqueidad linea filtrado-llenado PVCJOB
Total Miscellaneous
Total Trabajos Varios
ARCHITECTURAL WORK
RESUMEN TRABAJOS DE ARQUITECTURA
Demolition Works
Trabajos de Demolición
Concrete Works
Trabajos de Hormigón
Sealants
Sellantes
Finishes Works
Trabajos de Acabados
Miscellaneous Works
Trabajos varios
TOTAL ARCHITECTURAL
TOTAL TRABAJOS DE ARQUITECTURA
SUMMARY
RESUMEN
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS ARQUITECTURA
GRAND TOTAL
GRAN TOTAL
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD

SUBTOTAL

PROFIT

TOTAL PROJECT EUROS

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Regular"CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"Page &P of &N