AF 66 Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Mill & Overlay CE Pavements, newest first.
File Type Posted
Specifications_Spanish.pdf PDF
Drawings.pdf PDF
FA5575-17-B-0002.pdf PDF
Specifications_English.pdf PDF
Construction_Cost_Estimate_Breakdown,_Contractor.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 15-1016PROJECT TITLE

RPR WATER DISTRIBUTION MAINS, 2001

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule1NTP+5
2Work Plan1NTP+5
SECTION 01 11 01
3Progress Schedule1NTP+5
4Mobility Plan1NTP+5
5Quality Control Plan1NTP+10
6Waste & construction debris management1Final Inspection
7As-Built drawings1FI+15
8Spatial Data1FI+15
9Key Personnel1NTP+15
10Safety Program1Before any work execution
11Warranty letter1Acceptance+15
SECTION 03 30 00
12Inspection of the concrete batch plant4
13Concrete control test program4
14Results of the concrete control tests4
SECTION 09 90 00
15Each type of coating and/or product furnished4
SECTION 22 00 00
16High-density polyethylene piping PE 1004
17Accessories for polyethylene pipe connections4
18DIN 2440 galvanized steel pipe4
19Barrel type fire hydrant4
20Quick connection for hydrant4
21Gate valve4
22Valve box4
23Flanged Tee4
24Universal flange adapter and coupling4
25Hose bibb4
26Hose connection vacuum breaker4
27Water flow meter4
28Leak Detection Survey Company4
29Leak Detection Report4Prior to FI

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 15-1016TÍTULO DE PROYECTO:
REPARAR TUBERÍAS PRINCIPALES DE AGUA, 2001SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Programa de obra1NTP+5
2Plan de obra1NTP+5
SECCIÓN 01 11 01
3Programa de ejecución1NTP+5
4Plan de movilización1NTP+5
5Plan de control de calidad1NTP+10
6Gestión de residuos y escombros1Inspección final
7Planos As-Builts1IF+15
8Datos espaciales1IF+15
9Personal clave1NTP+15
10Plan de seguridad1Antes de cualquier trabajo
11Carta de garantía1Aceptación + 15
SECCIÓN 03 30 00
12Central de fabricación4
13Programa de ensayos de control del hormigón4
14Resultado de los ensayos de control del hormigón4
SECCIÓN 09 90 00
15Cada tipo de recubrimiento y/o producto suministrado4
SECCIÓN 22 00 00
16Tubos de polietileno de alta densidad PE1004
17Accesorios de conexión para tuberías de polietileno4
18Tubería de acero galvanizado DIN 24404
19Hidrante contraincendios tipo barril4
20Conexión rápida para hidrante4
21Válvula de compuerta4
22Caja de válvulas4
23T de conexión con bridas4
24Brida y manguito universal4
25Grifo para conexión de manguera4
26Rompedor de vacío atmosférico para grifo de manguera4
27Caudalímetros de agua4
28Empresa para estudio de fugas4
29Informe de detección de fugas4Antes de la Inspección final

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N