16_15-1016_AF66.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- Mill & Overlay CE Pavements Federal contract opportunity
- Solicitation number
- FA5575-17-B-0002
About this file
AF 66 Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Specifications_Spanish.pdf | ||
| Drawings.pdf | ||
| FA5575-17-B-0002.pdf | ||
| Specifications_English.pdf | ||
| Construction_Cost_Estimate_Breakdown,_Contractor.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 15-1016 | PROJECT TITLE |
RPR WATER DISTRIBUTION MAINS, 2001
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | |||||||
| 1 | Construction Schedule | 1 | NTP+5 | ||||
| 2 | Work Plan | 1 | NTP+5 | ||||
| SECTION 01 11 01 | |||||||
| 3 | Progress Schedule | 1 | NTP+5 | ||||
| 4 | Mobility Plan | 1 | NTP+5 | ||||
| 5 | Quality Control Plan | 1 | NTP+10 | ||||
| 6 | Waste & construction debris management | 1 | Final Inspection | ||||
| 7 | As-Built drawings | 1 | FI+15 | ||||
| 8 | Spatial Data | 1 | FI+15 | ||||
| 9 | Key Personnel | 1 | NTP+15 | ||||
| 10 | Safety Program | 1 | Before any work execution | ||||
| 11 | Warranty letter | 1 | Acceptance+15 | ||||
| SECTION 03 30 00 | |||||||
| 12 | Inspection of the concrete batch plant | 4 | |||||
| 13 | Concrete control test program | 4 | |||||
| 14 | Results of the concrete control tests | 4 | |||||
| SECTION 09 90 00 | |||||||
| 15 | Each type of coating and/or product furnished | 4 | |||||
| SECTION 22 00 00 | |||||||
| 16 | High-density polyethylene piping PE 100 | 4 | |||||
| 17 | Accessories for polyethylene pipe connections | 4 | |||||
| 18 | DIN 2440 galvanized steel pipe | 4 | |||||
| 19 | Barrel type fire hydrant | 4 | |||||
| 20 | Quick connection for hydrant | 4 | |||||
| 21 | Gate valve | 4 | |||||
| 22 | Valve box | 4 | |||||
| 23 | Flanged Tee | 4 | |||||
| 24 | Universal flange adapter and coupling | 4 | |||||
| 25 | Hose bibb | 4 | |||||
| 26 | Hose connection vacuum breaker | 4 | |||||
| 27 | Water flow meter | 4 | |||||
| 28 | Leak Detection Survey Company | 4 | |||||
| 29 | Leak Detection Report | 4 | Prior to FI |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 15-1016 | TÍTULO DE PROYECTO: | |||
| REPARAR TUBERÍAS PRINCIPALES DE AGUA, 2001 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | |||||||
| 1 | Programa de obra | 1 | NTP+5 | ||||
| 2 | Plan de obra | 1 | NTP+5 | ||||
| SECCIÓN 01 11 01 | |||||||
| 3 | Programa de ejecución | 1 | NTP+5 | ||||
| 4 | Plan de movilización | 1 | NTP+5 | ||||
| 5 | Plan de control de calidad | 1 | NTP+10 | ||||
| 6 | Gestión de residuos y escombros | 1 | Inspección final | ||||
| 7 | Planos As-Builts | 1 | IF+15 | ||||
| 8 | Datos espaciales | 1 | IF+15 | ||||
| 9 | Personal clave | 1 | NTP+15 | ||||
| 10 | Plan de seguridad | 1 | Antes de cualquier trabajo | ||||
| 11 | Carta de garantía | 1 | Aceptación + 15 | ||||
| SECCIÓN 03 30 00 | |||||||
| 12 | Central de fabricación | 4 | |||||
| 13 | Programa de ensayos de control del hormigón | 4 | |||||
| 14 | Resultado de los ensayos de control del hormigón | 4 | |||||
| SECCIÓN 09 90 00 | |||||||
| 15 | Cada tipo de recubrimiento y/o producto suministrado | 4 | |||||
| SECCIÓN 22 00 00 | |||||||
| 16 | Tubos de polietileno de alta densidad PE100 | 4 | |||||
| 17 | Accesorios de conexión para tuberías de polietileno | 4 | |||||
| 18 | Tubería de acero galvanizado DIN 2440 | 4 | |||||
| 19 | Hidrante contraincendios tipo barril | 4 | |||||
| 20 | Conexión rápida para hidrante | 4 | |||||
| 21 | Válvula de compuerta | 4 | |||||
| 22 | Caja de válvulas | 4 | |||||
| 23 | T de conexión con bridas | 4 | |||||
| 24 | Brida y manguito universal | 4 | |||||
| 25 | Grifo para conexión de manguera | 4 | |||||
| 26 | Rompedor de vacío atmosférico para grifo de manguera | 4 | |||||
| 27 | Caudalímetros de agua | 4 | |||||
| 28 | Empresa para estudio de fugas | 4 | |||||
| 29 | Informe de detección de fugas | 4 | Antes de la Inspección final |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N
File details come from the government source that posted it. Updated .