| File | Type | Posted |
|---|---|---|
| 3._Especificaciones.pdf | ||
| 4._Construction_Cost_Estimate_Breakdown.xlsx | XLSX spreadsheet | |
| 2._Specifications.pdf | ||
| FA5575-16-B-0006_Repair_Hanger_Access_Slabs.pdf | ||
| 1._Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 08-1045 | PROJECT TITLE |
RPR Hangar Access Apron
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||||||||||
| CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | |||||||||||
| APPROVED |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
| SECTION 01 11 00 | ||||||||
| 01 | Construction Schedule | 3 | NTP+5 | |||||
| 02 | Work Plan | 3 | NTP+5 | |||||
| 03 | Request of training about vehicle operations on the aerodrome | 3 | NTP+15 | |||||
| 04 | Laboratory | 3 | NTP+30 | |||||
| SECTION 01 11 01 | ||||||||
| 05 | Warranty letter | 3 | Prior to FI | |||||
| 06 | Work Clearance Request | 3 | NTP+5 | |||||
| 07 | Base utility connection request | 3 | NTP+15 | |||||
| 08 | Base utility outage request | 3 | NTP+15 | |||||
| 09 | Welding work request | 3 | Work-10 | |||||
| 10 | Transit control plan | 3 | Work-15 | |||||
| 11 | Access route plan | 3 | NTP+15 | |||||
| 12 | Progress Schedule | 3 | NTP+10 | |||||
| 13 | Mobility Plan | 3 | NTP+15 | |||||
| 14 | Project sign | 3 | NTP+15 | |||||
| 15 | Quality Control Plan | 3 | NTP+15 | |||||
| 16 | Pre-final inspection request | 3 | ||||||
| 17 | Final inspection request | 3 | ||||||
| 18 | Environmental protection plan | 3 | NTP+15 | |||||
| 19 | Waste & construction debris management certificate | 3 | Prior to FI | |||||
| 20 | As-Built drawings | 3 | Prior to FI | |||||
| 21 | Spatial Data | 3 | Prior to FI | |||||
| 22 | Key Personnel | 3 | NTP+15 | |||||
| 23 | Personel listing | 3 | NTP+15 | |||||
| 24 | Health and safety program | 3 | NTP+15 | |||||
| SECTION 32 05 10 | ||||||||
| 25 | CE certification of the aggregates | 3 | NTP+30 | |||||
| 26 | Job mix formula | 3 | NTP+30 | |||||
| 27 | Quality and shape of the underlayed course | 3 | Work-10 | |||||
| 28 | Tests of the test section | 3 | Work+10 | |||||
| 29 | Tests of acceptance control | 3 | Work+10 | |||||
| SECTION 32 05 30 | ||||||||
| 30 | CE certification of the prime coat | 3 | NTP+30 | |||||
| 31 | Ce certificatiopn of the coverage aggregate | 3 | NTP+30 | |||||
| 32 | Tests of execution control | 3 | Work+10 | |||||
| SECTION 32 05 42 | ||||||||
| 33 | CE certification of the aggregates | 3 | NTP+30 | |||||
| 34 | Ce certification of the filler | 3 | NTP+30 | |||||
| 35 | Ce certification of the bitumen | 3 | NTP+30 | |||||
| 36 | Ce certification of the asphalt mnixes | 3 | NTP+30 | |||||
| 37 | Job mix formula | 3 | NTP+30 | |||||
| 38 | Density of the combined aggregates | 3 | NTP+30 | |||||
| 39 | Tests of the test section | 3 | Work+10 | |||||
| 40 | Tests of the production of the bituminous mixes | 3 | Work+10 | |||||
| 41 | Tests of placing of bituminous mixes | 3 | Work+10 | |||||
| 42 | Compaction tests | 3 | Work+10 | |||||
| 43 | Tests of acceptance control | 3 | Work+10 | |||||
| SECTION 32 07 05 | ||||||||
| 44 | Laboratory | 3 | NTP+30 | |||||
| 45 | Equipment | 3 | NTP+30 | |||||
| 46 | Insurance | 3 | NTP+30 | |||||
| 47 | Waste identification and disposal plan | 3 | NTP+30 | |||||
| 48 | Quality control | 3 | NTP+45 | |||||
| SECTION 32 07 06 | ||||||||
| 49 | Paint | 3 | 3 | NTP+45 | ||||
| 50 | Glass spheres | 3 | 3 | 3 | NTP+45 | |||
| SECTION 32 08 01 | ||||||||
| 51 | Concrete Mix Design | 3 | NTP+45 | |||||
| 52 | Laboratory Test Results | 3 | Work+30 | |||||
| 53 | Aggregates | 3 | NTP+45 | |||||
| 54 | Cement | 3 | 3 | 3 | NTP+45 | |||
| 55 | Concrete slump | 3 | NTP+45 | |||||
| 56 | Concrete air content | 3 | NTP+45 | |||||
| 57 | Concrete strength (cylinder) | 3 | NTP+75 | |||||
| 58 | Admixtures | 3 | 3 | NTP+45 | ||||
| 59 | Absorbent curing material | 3 | 3 | NTP+45 | ||||
| 60 | Liquid membrane-forming compound | 3 | 3 | NTP+45 | ||||
| 61 | Sheet curing material | 3 | 3 | NTP+45 | ||||
| 62 | Joint filler | 3 | 3 | NTP+45 | ||||
| 63 | Joint sealant | 3 | 3 | NTP+45 | ||||
| SECTION 32 25 32 | ||||||||
| 64 | Laboratory | 3 | NTP+30 | |||||
| 65 | Bituminous emulsion | 3 | 3 | NTP+45 | ||||
| SECTION 32 25 50 | ||||||||
| 66 | Laboratory | 3 | NTP+30 | |||||
| 67 | Job mix formula for concrete | 3 | NTP+45 | |||||
| 68 | Dowels | 3 | NTP+45 | |||||
| 69 | Sheet material for concrete curing | 3 | NTP+30 | |||||
| 70 | Film-producing curing compound | 3 | NTP+30 | |||||
| 71 | Joint filler material for expansion joints | 3 | NTP+30 | |||||
| 72 | Joint sealant material | 3 | NTP+30 | |||||
| 73 | Product of dowel bond breaker | 3 | NTP+30 | |||||
| 74 | Concrete plant | 3 | NTP+30 | |||||
| 75 | Cement storage | 3 | NTP+30 | |||||
| 76 | Aggregate storage | 3 | NTP+30 | |||||
| 77 | Pavers | 3 | NTP+30 | |||||
| 78 | Film-producing product distributor | 3 | NTP+30 | |||||
| 79 | Concrete | 3 | NTP+45 | |||||
| SECTION 32 92 19 | ||||||||
| 80 | Seed | 4 | NTP+30 | |||||
| 81 | Fertilizer | 4 | NTP+30 | |||||
| 82 | Topsoil | 4 | NTP+30 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 08-1045 | TÍTULO DE PROYECTO: | |||
| Reparar Losas de Acceso de Hangares | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | |||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | NUMBER OF COPIES REQUIRED | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |||||||||||
| CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | |||||||||||
| APROBADO |
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
| SECCIÓN 01 11 00 | ||||||||
| 01 | Programa de obra | 3 | NTP+5 | |||||
| 02 | Plan de obra | 3 | NTP+5 | |||||
| 03 | Solicitud de entrenamiento de operaciones de vehículos en el aeródromo | 3 | NTP+15 | |||||
| 03 | Laboratory | 3 | NTP+30 | |||||
| SECCIÓN 01 11 01 | ||||||||
| 04 | Carta de garantía | 3 | Antes de IF | |||||
| 05 | Permiso de excavación | 3 | NTP+5 | |||||
| 06 | Petición de conexión a servicios de la base | 3 | NTP+15 | |||||
| 07 | Solicitud de cortes de servicios de la base | 3 | NTP+15 | |||||
| 08 | Solicitud de trabajo de soldadura | 3 | Trabajo-10 | |||||
| 09 | Plan de control de tránsito | 3 | Trabajo-15 | |||||
| 10 | Plan de rutas de acceso | 3 | NTP+15 | |||||
| 11 | Programa de avance de obras | 3 | NTP+10 | |||||
| 12 | Plan de movilización | 3 | NTP+15 | |||||
| 13 | Cartel de proyecto | 3 | NTP+15 | |||||
| 14 | Plan de control de calidad | 3 | NTP+15 | |||||
| 15 | Solicitud de inspección pre-final | 3 | ||||||
| 16 | Solicitud de inspección final | 3 | ||||||
| 17 | Plan de protección medioambiental | 3 | NTP+15 | |||||
| 18 | Certificado de gestión de residuos y escombros | 3 | Antes de IF | |||||
| 19 | Planos As-Builts | 3 | Antes de IF | |||||
| 20 | Datos espaciales | 3 | Antes de IF | |||||
| 21 | Personal clave | 3 | NTP+15 | |||||
| 22 | Listado de personal | 3 | NTP+15 | |||||
| 23 | Plan de salud y seguridad | 3 | NTP+15 | |||||
| SECCIÓN 32 05 10 | ||||||||
| 24 | Marcado CE de los áridos | 3 | NTP+30 | |||||
| 25 | Fórmula de trabajo | 3 | NTP+30 | |||||
| 26 | Calidad y forma de la superficie de asiento | 3 | Trabajo-10 | |||||
| 27 | Ensayos del tramo de prueba | 3 | Trabajo+10 | |||||
| 28 | Ensayos de control de recepción | 3 | Trabajo+10 | |||||
| SECCIÓN 32 05 30 | ||||||||
| 29 | Marcado CE del riego de imprimación | 3 | NTP+30 | |||||
| 30 | Marcado CE del árido de cobertura | 3 | NTP+30 | |||||
| 31 | Ensayos de control de recepción | 3 | Trabajo+10 | |||||
| SECCIÓN 32 05 42 | ||||||||
| 32 | Marcado CE de los áridos | 3 | NTP+30 | |||||
| 33 | Marcado CE del polvo mineral | 3 | NTP+30 | |||||
| 34 | Marcado CE del betún | 3 | NTP+30 | |||||
| 35 | Marcado CE de las mezclas bituminosas | 3 | NTP+30 | |||||
| 36 | Formula de Trabajo | 3 | NTP+30 | |||||
| 37 | Densidad del los áridos combinados | 3 | NTP+30 | |||||
| 38 | Ensayos de tramos de prueba | 3 | Trabajo+10 | |||||
| 39 | Ensayos de fabricación de mezclas bituminosas | 3 | Trabajo+10 | |||||
| 40 | Ensayos de extensión de mezclas bituminosas | 3 | Trabajo+10 | |||||
| 41 | Ensayos de compactación | 3 | Trabajo+10 | |||||
| 42 | Ensayos de control de recepción | 3 | Trabajo+10 | |||||
| SECCIÓN 32 07 05 | ||||||||
| 43 | Laboratorio | 3 | NTP+30 | |||||
| 44 | Equipos | 3 | NTP+30 | |||||
| 45 | Seguro | 3 | NTP+30 | |||||
| 46 | Plan de identificación y retirada de residuos | 3 | NTP+30 | |||||
| 47 | Control de calidad | 3 | NTP+45 | |||||
| SECCIÓN 32 07 06 | ||||||||
| 48 | Pintura | 3 | 3 | NTP+45 | ||||
| 49 | Reflectorizador | 3 | 3 | 3 | NTP+45 | |||
| SECCIÓN 32 08 01 | ||||||||
| 50 | Fórmula de Trabajo del hormigón | 3 | NTP+45 | |||||
| 51 | Informes de ensayo de laboratorio | 3 | Trabajo+30 | |||||
| 52 | Áridos | 3 | NTP+45 | |||||
| 53 | Cemento | 3 | 3 | 3 | NTP+45 | |||
| 54 | Asiento de hormigón | 3 | NTP+45 | |||||
| 55 | Contenido de aire en hormigón | 3 | NTP+45 | |||||
| 56 | Resistencia del hormigón (cilindro) | 3 | NTP+75 | |||||
| 57 | Aditivos | 3 | 3 | NTP+45 | ||||
| 58 | Material absorbente de curado | 3 | 3 | NTP+45 | ||||
| 59 | Producto filmógeno de curado | 3 | 3 | NTP+45 | ||||
| 60 | Lámina de curado | 3 | 3 | NTP+45 | ||||
| 61 | Material de relleno de junta | 3 | 3 | NTP+45 | ||||
| 62 | Sellante de junta | 3 | 3 | NTP+45 | ||||
| SECCIÓN 32 25 32 | ||||||||
| 63 | Laboratorio | 3 | NTP+30 | |||||
| 64 | Emulsión bituminosa | 3 | 3 | NTP+45 | ||||
| SECCIÓN 32 25 50 | ||||||||
| 65 | Laboratorio | 3 | NTP+30 | |||||
| 66 | Fómula de Trabajo del hormigón | 3 | NTP+45 | |||||
| 67 | Pasadores | 3 | NTP+45 | |||||
| 68 | Membranas para curado del pavimento | 3 | NTP+30 | |||||
| 69 | Producto filmógeno de curado | 3 | NTP+30 | |||||
| 70 | Material de relleno de junta de dilatación | 3 | NTP+30 | |||||
| 71 | Material para sellado de junta | 3 | NTP+30 | |||||
| 72 | Producto antiadherente para pasadores | 3 | NTP+30 | |||||
| 73 | Planta de hormigon | 3 | NTP+30 | |||||
| 74 | Almacenamiento de cemento | 3 | NTP+30 | |||||
| 75 | Almacenamiento de áridos | 3 | NTP+30 | |||||
| 76 | Extendedoras | 3 | NTP+30 | |||||
| 77 | Distribuidor de producto filmógeno | 3 | NTP+30 | |||||
| 78 | Hormigón | 3 | NTP+45 | |||||
| SECTION 32 92 19 | ||||||||
| 79 | Semilla | 4 | NTP+30 | |||||
| 80 | Fertilizante | 4 | NTP+30 | |||||
| 81 | Capa Vegetal | 4 | NTP+30 |