4._Construction_Cost_Estimate_Breakdown.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
RPR Hanger Access Slabs Federal contract opportunity
Solicitation number
FA5575-16-B-0006
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Constructions Cost Estimate Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to RPR Hanger Access Slabs, newest first.
File Type Posted
5._Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
3._Especificaciones.pdf PDF
2._Specifications.pdf PDF
FA5575-16-B-0006_Repair_Hanger_Access_Slabs.pdf PDF
1._Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTR Cost Estimate

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED CONTRACT PRICE
RPRP HANGAR ACCESS SLABS / REPARAR LOSAS DE ACCESSOS A HANGARES
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 08-1045MORÓN AIR BASE, SPAIN
LINE
NO.ITEMQUANTITYMATERIAL COSTLABOR COSTTOTAL LINE COST
UNIT OF
MEASUREUNIT
NUMBERUNIT COSTTOTAL
COSTUNIT COSTTOTAL

COST

(1)(2)(3)(4)(5)(6)(7)(8)
CONSTRUCTION PHASE 1

FASE DE CONSTRUCCIÓN 1

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Remove apron edge, restricted area, entry control point line and entry control point markings.
Eliminar señal de borde de plataforma, área restringida, línea de punto de control de entrada y punto de control de entrada.m
3Pavement milling, thickness 5 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 5 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
4Shoulder base course excavation for the new shoulder, thickness 15 cm approximately, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base de arcén para el nuevo arcén, 15 cm espesor aproximadamente, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
5Base and subbase courses excavation at the existing shoulder for the rigid pavement extension, thickness 30 cm approximately, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base y subbase de arcén existente para la extensión del pavimento rígido, 30 cm espesor aproximadamente, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Ground excavation, thickness 36 cm approximately, at the existing shoulder for the rigid pavement extension including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de terreno, 36 cm espesor aproximadamente, en arcén existente para extensión del pavimento rígido, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
7Excavation, thickness 71 cm approximately, at the existing ground for the rigid pavement extension including clearing-up, load and transportation of demolished material to authorized dump.
Excavación, 15 cm espesor aproximadamente, en terreno existente para la extensión del pavimento rígido, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
8Ground excavation, thickness 35 cm approximately, for the grounding point slabs including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de terreno, 35 cm espesor aproximadamente, para losas de punto de puesta a tierra, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
9Plain concrete pavement removal, 36 cm thickness approximately including dowels.
Retirada de pavimento de hormigón en masa, 36 cm de espesor aproximadamente, incluso pasadores.m3
10Base course excavation, thickness 20 cm approximately, a the existing hangar access apron, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base de acceso, 20 cm espesor aproximadamente, en losas existentes de acceso a hangar, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
11Excavation, thickness 15 cm approximately, at the subgrade of the existing hangar access apron including clearing-up, load and transportation of demolished material to authorized dump.
Excavación, 15 cm espesor aproximadamente, en explanada de losas existentes de acceso a hangar, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
12Remove the abandonned underground water line.
Retirar la línea enterrada de agua abandonada.m
13Remove the underground electrical duct bank.
Retirar el banco de conductos eléctricos enterrado.m
14Load of demolished and excavated material.
Carga de material demolido y excavado.m3
15Transportation to dump of demolished & excavated material & dumping fee.
Transporte a vertedero de material demolido y excavado y canon de vertido.m3
16Construct the underground pipe Ø 400 mm.
Construir tubo enterrado de Ø 400 mm.m
17Construct the underground electrical duct bank 6-4".
Construir banco de conductos eléctricos enterrado 6-4".m
18Compaction of 15 cm of subgrade to 95% Modified Proctor, including grading.
Compactación de 15 cm de explanada al 95% Proctor Modificado, incluso nivelación.m2
19Base course placing and compaction, 35 cm at the new hangar access apron, included grading.
Colocación y compactación de capa base, 35 cm en losas nuevas de acceso a hangar, incluso nivelación.m3
20Base course placing and compaction, 15 cm at the new shoulder, included grading.
Colocación y compactación de capa base, 15 cm en nuevo arcén, incluso nivelación.m3
21Base course placing and compaction, 15 cm for the grounding point slabs included grading.
Colocación y compactación de capa base, 15 cm para losas de punto de puesta a tierra, incluso nivelación.m3
22Application of double curing coat at the new hangar access apron and grounding point slabs.
Aplicación de doble riego de curado en losas nuevas de acceso a hangar y losas de punto de puesta a tierra.kg
23Steel dowels placing for hangar access apron pavement.
Colocación de acero en barras lisas en losas de acceso a hangar.kg
24Placing of vibrated Portland Cement Concrete, 36 cm thicknes, for the new hangar access apron included curing compound.
Extendido de hormigón vibrado, 36 cm de espesor, en losas nuevas de acceso a hangar, incluso compuesto de curado.m3
25Joint and corner spalling repair.
Reparación de rotura de borde de junta y esquina de losas.m
26Construct concrete slabs for the grounding point.
Construir losas de punto de puesta a tierra.m3
27Install grounding points.
Instalar puntos de puesta a tierra.u
28Contraction joint saw cut.
Corte con disco de juntas de retracción.m
29Joint sealing.
Sellado de juntas.m
30Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
31Placing and setting up of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
32Paint danger markings close to the hangar doors.
Pintar señales de peligro cerca de las puertas del hangar.m2
33Paint hazardous area clear zone marking close to de hangar doors.
Pintar señal de zona libre de área peligrosa cerca de las puertas del hangar.m2
34Paint clear standoff zone marking.
Pintar señal de zona de distancia libre.m2
35Paint no parking area marking at the fire hydrant.
Pintar señal de área de prohibición de aparcamiento en hidrante de incendios.m2
36Paint fire hydrant markings.
Pintat señales de hidrante de incendios.m2
37Paint hangar access apron edge markings.
Pintar señales de borde de losas de acceso a hangar.m2
38Paint taxilane centerline marking.
Pintar señal de eje de calle de rodaje en plataforma.m2
39Paint Entry Control Point markings.
Pintar señales de Control de Entrada.m2
40Paint Entry Control Point line marking.
Pintar señal de línea de Control de Entrada.m2
41Paint road centerline marking.
Pintar señal de eje de vial.m2
42Paint road edge markings.
Pintar señales de borde de vial.m2
43Paint stop line marking.
Pintar señal de línea de detención.m2
44Paint aircraft traffic markings.
Pintar señales de tráfico de aeronaves.m2
45Paint stop markings.
Pintar señales de stop.m2
46Grade the ground area toward the existing drainage structures and/or swales.
Renivelar el área de terreno hacia las estructuras de drenaje y/o vaguadas existentes.m2
47Sow the ground area with grass.
Sembrar el área de terreno con césped.m2
TOTAL CONSTRUCTION PHASE 1

TOTAL FASE DE CONSTRUCCIÓN 1

CONSTRUCTION PHASE 2

FASE DE CONSTRUCCIÓN 2

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Remove apron edge marking.
Eliminar señal de borde de plataforma.m
3Remove slab for equipment, slab for structure and pipe and ramp.
Retirar losa para equipos, losa para estructura y tubo y rampa.m3
4Pavement milling, thickness 5 cm approximately, including load, sweeping, removal and transport to authorized waste manager.
Fresado de pavimento, 5 cm de espesor aproximadamente, incluyendo carga, barrido, retirada y transporte a gestor autorizado de residuos.m2 cm
5Shoulder base course excavation for the new shoulder, thickness 15 cm approximately, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base de arcén para el nuevo arcén, 15 cm espesor aproximadamente, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Base and subbase courses excavation at the existing shoulder for the rigid pavement extension, thickness 30 cm approximately, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base y subbase de arcén existente para la extensión del pavimento rígido, 30 cm espesor aproximadamente, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
7Ground excavation, thickness 36 cm approximately, at the existing shoulder for the rigid pavement extension including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de terreno, 36 cm espesor aproximadamente, en arcén existente para extensión del pavimento rígido, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
8Excavation, thickness 71 cm approximately, at the existing ground for the rigid pavement extension including clearing-up, load and transportation of demolished material to authorized dump.
Excavación, 15 cm espesor aproximadamente, en terreno existente para la extensión del pavimento rígido, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
9Ground excavation, thickness 35 cm approximately, for the grounding point slabs, slab for equipment, slab for structure and pipe and ramp including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de terreno, 35 cm espesor aproximadamente, para losas de punto de puesta a tierra, losa para equipos, losa para estructura y tubo y rampa, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
10Plain concrete pavement removal, 36 cm thickness approximately including dowels.
Retirada de pavimento de hormigón en masa, 36 cm de espesor aproximadamente, incluso pasadores.m3
11Base course excavation, thickness 20 cm approximately, a the existing hangar access apron, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base de acceso, 20 cm espesor aproximadamente, en losas existentes de acceso a hangar, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
12Excavation, thickness 15 cm approximately, at the subgrade of the existing hangar access apron including clearing-up, load and transportation of demolished material to authorized dump.
Excavación, 15 cm espesor aproximadamente, en explanada de losas existentes de acceso a hangar, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
13Remove the abandonned underground water line.
Retirar la línea enterrada de agua abandonada.m
14Remove the underground electrical duct bank.
Retirar el banco de conductos eléctricos enterrado.m
15Load of demolished and excavated material.
Carga de material demolido y excavado.m3
16Transportation to dump of demolished & excavated material & dumping fee.
Transporte a vertedero de material demolido y excavado y canon de vertido.m3
17Construct the underground pipe Ø 400 mm.
Construir tubo enterrado de Ø 400 mm.m
18Construct the underground electrical duct bank 6-4".
Construir banco de conductos eléctricos enterrado 6-4".m
19Compaction of 15 cm of subgrade to 95% Modified Proctor, including grading.
Compactación de 15 cm de explanada al 95% Proctor Modificado, incluso nivelación.m2
20Base course placing and compaction, 35 cm at the new hangar access apron, included grading.
Colocación y compactación de capa base, 35 cm en losas nuevas de acceso a hangar, incluso nivelación.m3
21Base course placing and compaction, 15 cm at the new shoulder, included grading.
Colocación y compactación de capa base, 15 cm en nuevo arcén, incluso nivelación.m3
22Base course placing and compaction, 15 cm for the grounding point slabs, slab for equipment, slab for structure and pipe and ramp included grading.
Colocación y compactación de capa base, 15 cm para losas de punto de puesta a tierra, losa para equipos, losa para estructura y tubo y rampa, incluso nivelación.m3
23Application of double curing coat at the new hangar access apron, grounding point slabs, slab for equipment, slab for structure and pipe and ramp.
Aplicación de doble riego de curado en losas nuevas de acceso a hangar, losas de punto de puesta a tierra, losa para equipos, losa para estructura y tubo y rampa.kg
24Steel dowels placing for hangar access apron pavement.
Colocación de acero en barras lisas en losas de acceso a hangar.kg
25Placing of vibrated Portland Cement Concrete, 36 cm thicknes, for the new hangar access apron included curing compound.
Extendido de hormigón vibrado, 36 cm de espesor, en losas nuevas de acceso a hangar, incluso compuesto de curado.m3
26Joint and corner spalling repair.
Reparación de rotura de borde de junta y esquina de losas.m
27Construct concrete slabs for the grounding point, slab for equipment, slab for structure and pipe and ramp included dowels.
Construir losas de punto de puesta a tierra, losa para equipos, losa para estructura y tubo y rampa, incluso pasadores.m3
28Install grounding points.
Instalar puntos de puesta a tierra.u
29Install structure and pipe.
Instalar estructura y tubo.u
30Contraction joint saw cut.
Corte con disco de juntas de retracción.m
31Joint sealing.
Sellado de juntas.m
32Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
33Placing and setting up of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
34Paint danger markings close to the hangar doors.
Pintar señales de peligro cerca de las puertas del hangar.m2
35Paint hazardous area clear zone marking close to de hangar doors.
Pintar señal de zona libre de área peligrosa cerca de las puertas del hangar.m2
36Paint clear standoff zone marking.
Pintar señal de zona de distancia libre.m2
37Paint no parking area marking at the fire hydrant.
Pintar señal de área de prohibición de aparcamiento en hidrante de incendios.m2
38Paint fire hydrant markings.
Pintat señales de hidrante de incendios.m2
39Paint hangar access apron edge markings.
Pintar señales de borde de losas de acceso a hangar.m2
40Paint taxilane centerline marking.
Pintar señal de eje de calle de rodaje en plataforma.m2
41Paint towway centerline marking.
Pintar señal de guía para tractor.m2
42Paint road centerline marking.
Pintar señal de eje de vial.m2
43Paint road edge markings.
Pintar señales de borde de vial.m2
44Paint stop line marking.
Pintar señal de línea de detención.m2
45Paint aircraft traffic markings.
Pintar señales de tráfico de aeronaves.m2
46Paint stop markings.
Pintar señales de stop.m2
47Grade the ground area toward the existing drainage structures and/or swales.
Renivelar el área de terreno hacia las estructuras de drenaje y/o vaguadas existentes.m2
48Sow the ground area with grass.
Sembrar el área de terreno con césped.m2
TOTAL CONSTRUCTION PHASE 2

TOTAL FASE DE CONSTRUCCIÓN 2

CONSTRUCTION PHASE 3

FASE DE CONSTRUCCIÓN 3

1Pavement perimeter sawcut.
Corte con disco del perimetro del pavimento.m
2Plain concrete pavement removal, 25 cm thickness approximately, included dowels at zone 1.
Retirada de pavimento de hormigón en masa, 25 cm de espesor aproximadamente, incluso pasadores en zona 1.m3
3Plain concrete pavement removal, 21 cm thickness approximately, included reinforcement and dowels at zone 2.
Retirada de pavimento de hormigón en masa, 21 cm de espesor aproximadamente, incluso armadura y pasadores en zona 2.m3
4Plain concrete pavement removal, 20 cm thickness approximately,included reinforcement and dowels and wash rack at zone 3.
Retirada de pavimento de hormigón en masa, 20 cm de espesor aproximadamente, incluso armaduras, pasadores y lavadero en zona 3.m3
5Base and subbase courses excavation, thickness 30 cm approximately, a the existing access apron at zone 1, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base y subbase de acceso, 30 cm espesor aproximadamente, en losas existentes de plataforma de acceso en zona 1, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
6Base course excavation, thickness 18 cm approximately, a the existing access apron at zone 2, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base de acceso, 18 cm espesor aproximadamente, en losas existentes de plataforma de acceso en zona 2, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
7Base course excavation, thickness 40 cm approximately, a the existing access apron at zone 3, including clearing-up, load and transportation of demolished material to authorized dump.
Excavación de capa base de acceso, 40 cm espesor aproximadamente, en losas existentes de plataforma de acceso en zona 3, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
8Excavation, thickness 16 cm approximately, at the subgrade of the existing access apron at zone 1 including clearing-up, load and transportation of demolished material to authorized dump.
Excavación, 16 cm espesor aproximadamente, en explanada de plataforma existente de acceso en zona 1, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
9Excavation, thickness 32 cm approximately, at the subgrade of the existing access apron at zone 2 including clearing-up, load and transportation of demolished material to authorized dump.
Excavación, 32 cm espesor aproximadamente, en explanada de plataforma existente de acceso en zona 2, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
10Excavation, thickness 11 cm approximately, at the subgrade of the existing access apron at zone 3 including clearing-up, load and transportation of demolished material to authorized dump.
Excavación, 11 cm espesor aproximadamente, en explanada de plataforma existente de acceso en zona 3, incluso desescombro, carga y transporte a gestor autorizado de residuo.m3
11Load of demolished and excavated material.
Carga de material demolido y excavado.m3
12Transportation to dump of demolished & excavated material & dumping fee.
Transporte a vertedero de material demolido y excavado y canon de vertido.m3
13Compaction of 15 cm of subgrade to 95% Modified Proctor, including grading.
Compactación de 15 cm de explanada al 95% Proctor Modificado, incluso nivelación.m2
14Base course placing and compaction, 35 cm at the new access apron, included grading.
Colocación y compactación de capa base, 35 cm enplataforma de acceso, incluso nivelación.m3
15Base course placing and compaction, 33 cm at the new shoulder, included grading.
Colocación y compactación de capa base, 33 cm en nuevo arcén, incluso nivelación.m3
16Application of double curing coat at the new access apron.
Aplicación de doble riego de curado en plataforma de acceso.kg
17Construct drainage for the wash rack.
Construir drenaje para lavadero.u
18Steel dowels placing for access apron.
Colocación de acero en barras lisas en plataforma de acceso.kg
19Placing of vibrated Portland Cement Concrete, 36 cm, included curing compound and wash rack.
Extendido de hormigón vibrado, 36 cm, incluso compuesto de curado y lavadero.m3
20Joint and corner spalling repair.
Reparación de rotura de borde de junta y esquina de losas.m
21Contraction joint saw cut.
Corte con disco de juntas de retracción.m
22Joint sealing.
Sellado de juntas.m
23Application of prime coat C60BF4 IMP type, including sweeping and surface preparation.
Aplicación de riego de imprimación tipo C60BF4 IMP, incluyendo barrido y preparación de superficie.t
24Placing and setting up of 5 centimeters of hot mix asphalt AC16 SURF 35/50 D type.
Extensión y compactación de 5 cm de espesor de asfalto en caliente tipo AC16 SURF 35/50 D.t
25Paint access apron edge markings.
Pintar señales de borde de plataforma de acceso.m2
26Paint road centerline marking.
Pintar señal de eje de vial.m2
27Paint stop line marking.
Pintar señal de línea de detención.m2
28Paint stop markings.
Pintar señales de stop.m2
29Paint parking stall line markings.
Pintar señales de línea de plaza de aparcamiento.m2
30Grade the ground area toward the existing drainage structures and/or swales.
Renivelar el área de terreno hacia las estructuras de drenaje y/o vaguadas existentes.m2
31Sow the ground area with grass.
Sembrar el área de terreno con césped.m2
TOTAL CONSTRUCTION PHASE 3

TOTAL FASE DE CONSTRUCCIÓN 3

SUMMARY

RESUMEN

TOTAL CONSTRUCTION PHASE 1

TOTAL FASE DE CONSTRUCCIÓN 1

TOTAL CONSTRUCTION PHASE 2

TOTAL FASE DE CONSTRUCCIÓN 2

TOTAL CONSTRUCTION PHASE 3

TOTAL FASE DE CONSTRUCCIÓN 3

TOTAL

TOTAL

OVERHEAD BREAKDOWNTOTAL MATERIAL COST
PROJECT SUPERINTENDENTTOTAL LABOR COST
QUALITY CONTROL MANAGERTOTAL MATERIAL EXECUTION COST
SAFETY MANAGEROVERHEAD
ENGLISH SPEAKING REPRESENTATIVEPROFIT
OTHER OVERHEAD COSTSTOTAL COST ESTIMATE
TOTAL OVERHEAD BREAKDOWN

DATE: FIRM NAME:

TITLE:BY:
(Signature)
These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Regular"Page &P of &N

Instructions for Completing

INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN

Column 1 - Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs. Items will be furnished by the Government.

Column 2 - Units of Measure. Description of the unit in which each item is to be estimated (examples: square meters - m2, cubic meters - m3, linear meters - m, unit - u, kilograms - kg, ton - t). Units of measure will be furnished by the Government.

Column 3 - Quantity. Quantity required for the item in terms of unit of measure shown on Column 2. Quantity will be furnished by the Government only for unit price contract. Otherwise, the contractor is responsible for determining the quantity.

Column 4 and 5 - Material Costs. Enter the unit cost of the material corresponding to the item to be supplied in Column 4 and the total material cost for that item in Column 5. Cost must be in euros.

Column 6 and 7 - Labor Costs. Enter the unit cost of the labor corresponding to the item to be performed in Column 6 and the total labor cost for that item in Column 7. Costs must be in euros.

Column 8 - Total Line Cost. Enter the sum of the total material cost and the total labor cost of the item to be performed. Cost must be in euros.

NOTE: In addition to other totals derived on various pages, the grand total of Column 5, 7 and 10, plus overhead and profit will be shown on the last page. Overhead and profit must be applied over the total material execution.

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror may be required to submit a certificate of current cost or pricing data.

2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), and made available to the contracting officer, or his authorized representative, upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

&"Times New Roman,Regular"Page 3 of 3