Submittal_Schedule.xls
XLS spreadsheet 191 KB Posted
- Attached to
- Rpr Storm Grates Federal contract opportunity
- Solicitation number
- FA5575-16-B-0002
About this file
Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5575-16-B-0002.pdf | ||
| 08-1024_SPANISH_SPEC_R1.pdf | ||
| 08-1024_Construction_Cost_Estimate_Breakdown_Ktor.xls | XLS spreadsheet | |
| 08-1024_DWG.pdf | ||
| 08-1024_ENGLISH_SPEC_R1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||||||||||||||||||||||
| QUUG 08-1024 | PROJECT TITLE | |||||||||||||||||||||||
| RPR STORM GRATES | SOLICITATION / CONTRACT NO. | |||||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||
| APPROVED | DISAPPROVED | |||||||||||||||||||||||
| SECTION 01 11 00 | ||||||||||||||||||||||||
| 01 | Construction Schedule | 3 | NTP+5 | |||||||||||||||||||||
| 02 | Work Plan | 3 | NTP+5 | |||||||||||||||||||||
| SECTION 01 11 01 | ||||||||||||||||||||||||
| 03 | Warranty letter | 3 | Prior to FI | |||||||||||||||||||||
| 04 | Work Clearance Request | 3 | NTP+15 | |||||||||||||||||||||
| 05 | Base utility connection request | 3 | NTP+15 | |||||||||||||||||||||
| 06 | Base utility outage request | 3 | NTP+15 | |||||||||||||||||||||
| 07 | Welding work request | 3 | Work-10 | |||||||||||||||||||||
| 08 | Transit control plan | 3 | Work-15 | |||||||||||||||||||||
| 09 | Access route plan | 3 | NTP+15 | |||||||||||||||||||||
| 10 | Progress Schedule | 3 | NTP+10 | |||||||||||||||||||||
| 11 | Mobility Plan | 3 | NTP+15 | |||||||||||||||||||||
| 12 | Project sign | 3 | NTP+15 | |||||||||||||||||||||
| 13 | Quality Control Plan | 3 | NTP+15 | |||||||||||||||||||||
| 14 | Pre-final inspection request | 3 | ||||||||||||||||||||||
| 15 | Final inspection request | 3 | ||||||||||||||||||||||
| 16 | Environmental protection plan | 3 | NTP+15 | |||||||||||||||||||||
| 17 | Waste & construction debris management certificate | 3 | Prior to FI | |||||||||||||||||||||
| 18 | As-Built drawings | 3 | Prior to FI | |||||||||||||||||||||
| 19 | Spatial Data | 3 | Prior to FI | |||||||||||||||||||||
| 20 | Key Personnel | 3 | NTP+15 | |||||||||||||||||||||
| 21 | Personel listing | 3 | NTP+15 | |||||||||||||||||||||
| 22 | Health and safety program | 3 | NTP+15 | |||||||||||||||||||||
| SECTION 02 41 10 | ||||||||||||||||||||||||
| 23 | Program and schedule of the works | 1 | ||||||||||||||||||||||
| 24 | Demolition plan | 1 | ||||||||||||||||||||||
| 25 | Management and disposal plan of the waste | 1 | ||||||||||||||||||||||
| 26 | Manager of waste from demolition and construction | 1 | ||||||||||||||||||||||
| 27 | Authorized dump or treatment and recovery plant | 1 | ||||||||||||||||||||||
| 28 | Delivery and disposal certicate of waste | 1 | ||||||||||||||||||||||
| SECTION 03 30 00 | ||||||||||||||||||||||||
| 29 | Concrete batch plant | 4 | ||||||||||||||||||||||
| 30 | Concrete Control Test Program | 4 | ||||||||||||||||||||||
| 31 | Results of the Concrete Control Tests | 4 | ||||||||||||||||||||||
| 32 | Assembly of ironworks | 4 | ||||||||||||||||||||||
| 33 | Polypropylene fiber | 4 | ||||||||||||||||||||||
| 34 | Geotextil | 4 | ||||||||||||||||||||||
| SECTION 05 12 00 | ||||||||||||||||||||||||
| 35 | Erection Plan | 1 | ||||||||||||||||||||||
| 36 | Welding procedures and qualifications | 1 | ||||||||||||||||||||||
| SECTION 31 00 10 | ||||||||||||||||||||||||
| 37 | Backfill material | 4 | ||||||||||||||||||||||
| SECTION 32 31 31.13 | ||||||||||||||||||||||||
| 38 | Posts, rod and chain link fabric | 1 | 1 |
&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||||||||||||||||||||||
| QUUG 08-1024 | TÍTULO DE PROYECTO: | |||||||||||||||||||||||
| REPARAR REJILLAS DE DRENAJE | SOLICITACIÓN / CONTRATO NO. | |||||||||||||||||||||||
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | |||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | NUMBER OF COPIES REQUIRED | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |||||||||||||
| CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | |||||||||||||
| APROBADO | DESAPROBADO | |||||||||||||||||||||||
| SECCIÓN 01 11 00 | ||||||||||||||||||||||||
| 01 | Programa de obra | 3 | NTP+5 | |||||||||||||||||||||
| 02 | Plan de obra | 3 | NTP+5 | |||||||||||||||||||||
| SECCIÓN 01 11 01 | ||||||||||||||||||||||||
| 03 | Carta de garantía | 3 | Antes de IF | |||||||||||||||||||||
| 04 | Permiso de excavación | 3 | NTP+15 | |||||||||||||||||||||
| 05 | Petición de conexión a servicios de la base | 3 | NTP+15 | |||||||||||||||||||||
| 06 | Solicitud de cortes de servicios de la base | 3 | NTP+15 | |||||||||||||||||||||
| 07 | Solicitud de trabajo de soldadura | 3 | Trabajo-10 | |||||||||||||||||||||
| 08 | Plan de control de tránsito | 3 | Trabajo-15 | |||||||||||||||||||||
| 09 | Plan de rutas de acceso | 3 | NTP+15 | |||||||||||||||||||||
| 10 | Programa de avance de obras | 3 | NTP+10 | |||||||||||||||||||||
| 11 | Plan de movilización | 3 | NTP+15 | |||||||||||||||||||||
| 12 | Cartel de proyecto | 3 | NTP+15 | |||||||||||||||||||||
| 13 | Plan de control de calidad | 3 | NTP+15 | |||||||||||||||||||||
| 14 | Solicitud de inspección pre-final | 3 | ||||||||||||||||||||||
| 15 | Solicitud de inspección final | 3 | ||||||||||||||||||||||
| 16 | Plan de protección medioambiental | 3 | NTP+15 | |||||||||||||||||||||
| 17 | Certificado de gestión de residuos y escombros | 3 | Antes de IF | |||||||||||||||||||||
| 18 | Planos As-Builts | 3 | Antes de IF | |||||||||||||||||||||
| 19 | Datos espaciales | 3 | Antes de IF | |||||||||||||||||||||
| 20 | Personal clave | 3 | NTP+15 | |||||||||||||||||||||
| 21 | Listado de personal | 3 | NTP+15 | |||||||||||||||||||||
| 22 | Plan de salud y seguridad | 3 | NTP+15 | |||||||||||||||||||||
| SECCIÓN 02 41 10 | ||||||||||||||||||||||||
| 23 | Programa y plan de las obras | 1 | ||||||||||||||||||||||
| 24 | Plan de demolición | 1 | ||||||||||||||||||||||
| 25 | Plan de gestión y eliminación de residuos | 1 | ||||||||||||||||||||||
| 26 | Gestor de residuos | 1 | ||||||||||||||||||||||
| 27 | Vertedero autorizado o planta de tratamiento y valorización de residuos | 1 | ||||||||||||||||||||||
| 28 | Depósitos de residuos | 1 | ||||||||||||||||||||||
| SECTION 03 30 00 | ||||||||||||||||||||||||
| 29 | Inspección de la central de fabricación del hormigón | 4 | ||||||||||||||||||||||
| 30 | Programa ensayos control del hormigón | 4 | ||||||||||||||||||||||
| 31 | Resultado de los ensayos de control del hormigón | 4 | ||||||||||||||||||||||
| 32 | Plano de montaje de ferralla | 4 | ||||||||||||||||||||||
| 33 | Fibra de polipropileno | 4 | ||||||||||||||||||||||
| 34 | Geotextil | 4 | ||||||||||||||||||||||
| SECCIÓN 05 12 00 | ||||||||||||||||||||||||
| 35 | Plano de montaje | 1 | ||||||||||||||||||||||
| 36 | Procedimiento y culaificaciones para soldadura | 1 | ||||||||||||||||||||||
| SECCIÓN 31 00 10 | ||||||||||||||||||||||||
| 37 | Ensayos de material de relleno | 4 | ||||||||||||||||||||||
| SECCIÓN 32 31 13.53 | ||||||||||||||||||||||||
| 38 | Postes, tirantes y malla | 1 | 1 |
&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
File details come from the government source that posted it. Updated .