08-1024_Construction_Cost_Estimate_Breakdown_Ktor.xls

XLS spreadsheet 55 KB Posted

Attached to
Rpr Storm Grates Federal contract opportunity
Solicitation number
FA5575-16-B-0002
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Construction Cost Estimate

View the file

Other files for this federal contract opportunity

Other files attached to Rpr Storm Grates, newest first.
File Type Posted
Submittal_Schedule.xls XLS spreadsheet
FA5575-16-B-0002.pdf PDF
08-1024_SPANISH_SPEC_R1.pdf PDF
08-1024_DWG.pdf PDF
08-1024_ENGLISH_SPEC_R1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ktor

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR STORM GRATES
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
08-1024MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
CIVIL WORKS
TRABAJOS DE OBRA CIVIL
Demolition & Disassemble Work
Trabajos de Demolición y Desmontaje
1Remove existing Fence
Desmontaje de valla existenteLm
2Remove existing metal flap valves from culvert
Desmontar válvulas antiretorno metál. del pasacunetasJob
3Demolish existing footings, bases and columns F+B+C
Demoler zapatas, pilas y pilares existentes Z+P+PJob
4Demolish concrete dicht
Demoler canal de hormigónJob
5Separate, load and transport the waste to authorized dump
Separar, cargar y transportar residuos a vertedero autorJob
Total Demoliton & Disassemble Works
Total Trabajos de Demolición y Desmontaje
Earth Movements
Movimientos de Tierra
6Excavation for footing and base colums
Excavacion en pozos para zapatas y pilasm³
7Base channel excavation
Excavacion de lecho de canalm³
8Provide and compact basecourse for footings
Proveer y compactar zahorra en fondo de zapatasm³
9Provide and compact basecourse for channel
Proveer y compactar zahorra en fondo canalm³
10Clean and regrade of channel off the Base
Limpieza y perfilado de canal en zona exterior BaseLm
11Provide material & construct embarquement on riverside
Proveer y construir escolleras en rivera final del canalm³
12Excavation & filling for comm pipe and manholes
Excav. Y relleno para tubo comm y arquetasJob
13Excavation & filling for SpAF pipe and manholes
Excav. Y relleno para tubo y arquetas del EAJob
14Load earth from excavation & transport to dump
Carga y transporte de tierras excavadas a vertederom³
Total Earth Movements
Total Movimientos de Tierra
Concrete Works
Trabajos de Hormigón
15Furnishing and pouring lean concrete HM20B40I
Suministro y puesta en obra de hormigón HM20B40Im³
16Furnishing and pouring HA25B20IIa concrete F+TB+B+C
Sumin. puesta de hormigón HA25B20IIa Z+VA+P+Pm³
16Furnish+Pour HA25B20IIa concrete-stones for channel
Sumin. puesta de hormigón HA25B20IIa-Rocas en canalm³
16Furnish+const comm duct encasement & stem wall
Construir encapsulado linea y murete bajo arqueta ComJob
17Furnish+const SpAF line encasement
Sumin. Y construccion encapsulado linea EAJob
Total Concrete Works
Total Trabajos de Hormigón
Metal Works
Trabajos de Metalistería
1Install-Remove temp. chain link fence and accessories
Instal-desinstalar valla de malla de simple torsión tempLm
18Provide install hot rolled profiles grates
Proveer instalar rejas de perfiles laminados en calientekg
19Provide install chain link fence and accessories
Proveer installar valla de malla de simple torsiónLm
Total Metal Works
Total Trabajos de Metalistería
ARCHITECTURAL WORK SUMMARY
RESUMEN TRABAJOS DE ARQUITECTURA
Total Demoliton & Disassemble Works
Total Trabajos de Demolición y Desmontaje
Earth Movements
Movimientos de Tierra
Concrete Works
Trabajos de Hormigón
Metal Works
Trabajos de Metalistería
TOTAL ARCHITECTURAL WORK
TOTAL TRABAJOS DE ARQUITECTURA
SUMMARY
RESUMEN
Total Civil Work
Total Trabajos de Obra Civil
GRAND TOTAL
GRAN TOTAL
`
OVERHEAD BREAKDOWNTOTAL MATERIAL COSTS
Project SuperintendentTOTAL LABOR COSTS
QC ManagerTOTAL OTHER DIRECT COSTS
Safety ManagerTOTAL DIRECT COSTS
English Speaking RepresentativeOVERHEAD (see breakdown
include key personnel)
Other Overhead CostsSUBTOTAL
TOTAL OVERHEAD BREAKDOWN EUROSPROFIT
TOTAL PROJECT EUROS
DATE:FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications

&R&"Times New Roman,Regular"Page &P of &N