Construction Cost Estimate
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Submittal_Schedule.xls | XLS spreadsheet | |
| FA5575-16-B-0002.pdf | ||
| 08-1024_SPANISH_SPEC_R1.pdf | ||
| 08-1024_DWG.pdf | ||
| 08-1024_ENGLISH_SPEC_R1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktor
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR STORM GRATES | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| 08-1024 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| CIVIL WORKS | ||||||||||
| TRABAJOS DE OBRA CIVIL | ||||||||||
| Demolition & Disassemble Work | ||||||||||
| Trabajos de Demolición y Desmontaje | ||||||||||
| 1 | Remove existing Fence | |||||||||
| Desmontaje de valla existente | Lm | |||||||||
| 2 | Remove existing metal flap valves from culvert | |||||||||
| Desmontar válvulas antiretorno metál. del pasacunetas | Job | |||||||||
| 3 | Demolish existing footings, bases and columns F+B+C | |||||||||
| Demoler zapatas, pilas y pilares existentes Z+P+P | Job | |||||||||
| 4 | Demolish concrete dicht | |||||||||
| Demoler canal de hormigón | Job | |||||||||
| 5 | Separate, load and transport the waste to authorized dump | |||||||||
| Separar, cargar y transportar residuos a vertedero autor | Job | |||||||||
| Total Demoliton & Disassemble Works | ||||||||||
| Total Trabajos de Demolición y Desmontaje | ||||||||||
| Earth Movements | ||||||||||
| Movimientos de Tierra | ||||||||||
| 6 | Excavation for footing and base colums | |||||||||
| Excavacion en pozos para zapatas y pilas | m³ | |||||||||
| 7 | Base channel excavation | |||||||||
| Excavacion de lecho de canal | m³ | |||||||||
| 8 | Provide and compact basecourse for footings | |||||||||
| Proveer y compactar zahorra en fondo de zapatas | m³ | |||||||||
| 9 | Provide and compact basecourse for channel | |||||||||
| Proveer y compactar zahorra en fondo canal | m³ | |||||||||
| 10 | Clean and regrade of channel off the Base | |||||||||
| Limpieza y perfilado de canal en zona exterior Base | Lm | |||||||||
| 11 | Provide material & construct embarquement on riverside | |||||||||
| Proveer y construir escolleras en rivera final del canal | m³ | |||||||||
| 12 | Excavation & filling for comm pipe and manholes | |||||||||
| Excav. Y relleno para tubo comm y arquetas | Job | |||||||||
| 13 | Excavation & filling for SpAF pipe and manholes | |||||||||
| Excav. Y relleno para tubo y arquetas del EA | Job | |||||||||
| 14 | Load earth from excavation & transport to dump | |||||||||
| Carga y transporte de tierras excavadas a vertedero | m³ | |||||||||
| Total Earth Movements | ||||||||||
| Total Movimientos de Tierra | ||||||||||
| Concrete Works | ||||||||||
| Trabajos de Hormigón | ||||||||||
| 15 | Furnishing and pouring lean concrete HM20B40I | |||||||||
| Suministro y puesta en obra de hormigón HM20B40I | m³ | |||||||||
| 16 | Furnishing and pouring HA25B20IIa concrete F+TB+B+C | |||||||||
| Sumin. puesta de hormigón HA25B20IIa Z+VA+P+P | m³ | |||||||||
| 16 | Furnish+Pour HA25B20IIa concrete-stones for channel | |||||||||
| Sumin. puesta de hormigón HA25B20IIa-Rocas en canal | m³ | |||||||||
| 16 | Furnish+const comm duct encasement & stem wall | |||||||||
| Construir encapsulado linea y murete bajo arqueta Com | Job | |||||||||
| 17 | Furnish+const SpAF line encasement | |||||||||
| Sumin. Y construccion encapsulado linea EA | Job | |||||||||
| Total Concrete Works | ||||||||||
| Total Trabajos de Hormigón | ||||||||||
| Metal Works | ||||||||||
| Trabajos de Metalistería | ||||||||||
| 1 | Install-Remove temp. chain link fence and accessories | |||||||||
| Instal-desinstalar valla de malla de simple torsión temp | Lm | |||||||||
| 18 | Provide install hot rolled profiles grates | |||||||||
| Proveer instalar rejas de perfiles laminados en caliente | kg | |||||||||
| 19 | Provide install chain link fence and accessories | |||||||||
| Proveer installar valla de malla de simple torsión | Lm | |||||||||
| Total Metal Works | ||||||||||
| Total Trabajos de Metalistería | ||||||||||
| ARCHITECTURAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ARQUITECTURA | ||||||||||
| Total Demoliton & Disassemble Works | ||||||||||
| Total Trabajos de Demolición y Desmontaje | ||||||||||
| Earth Movements | ||||||||||
| Movimientos de Tierra | ||||||||||
| Concrete Works | ||||||||||
| Trabajos de Hormigón | ||||||||||
| Metal Works | ||||||||||
| Trabajos de Metalistería | ||||||||||
| TOTAL ARCHITECTURAL WORK | ||||||||||
| TOTAL TRABAJOS DE ARQUITECTURA | ||||||||||
| SUMMARY | ||||||||||
| RESUMEN | ||||||||||
| Total Civil Work | ||||||||||
| Total Trabajos de Obra Civil | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| ` | ||||||||||
| OVERHEAD BREAKDOWN | TOTAL MATERIAL COSTS | |||||||||
| Project Superintendent | TOTAL LABOR COSTS | |||||||||
| QC Manager | TOTAL OTHER DIRECT COSTS | |||||||||
| Safety Manager | TOTAL DIRECT COSTS | |||||||||
| English Speaking Representative | OVERHEAD (see breakdown | |||||||||
| include key personnel) | ||||||||||
| Other Overhead Costs | SUBTOTAL | |||||||||
| TOTAL OVERHEAD BREAKDOWN EUROS | PROFIT | |||||||||
| TOTAL PROJECT EUROS | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| These costs and overhead and profit percentages will be applied in any possible future modifications |