10-1001P4_AF66.xlsx
XLSX spreadsheet 45 KB Posted
- Attached to
- Repair Overhead Electrical Distribution System Phase 4 Federal contract opportunity
- Solicitation number
- FA5575-15-B-0012
About this file
Attachment 4 Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R-705-02-PH4-AMEND_1.pdf | ||
| R-705-03-PH4-AMEND_1.pdf | ||
| FA5575-15-B-0012-0001.pdf | ||
| 10-1001P4_Especificaciones_Espaol.pdf | ||
| PP_reference_list.doc | DOC document | |
| 10-1001P4_AF_3052_Ktor.xlsx | XLSX spreadsheet | |
| 10-1001-P4_01_of_02.pdf | ||
| 10-1001-P4_02_of_02.pdf | ||
| 10-1001P4_Specifications_English.pdf | ||
| FA5575-15-B-0012.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 10-1001 Ph IV | PROJECT TITLE |
RPR OVERHEAD ELECTRICAL DISTRIBUTION SYSTEM PHASE IV
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | |||||||||||
| 1 | Construction Schedule | NTP+5 | |||||||||
| 2 | Work Plan | NTP+5 | |||||||||
| SECTION 01 11 01 | |||||||||||
| 3 | Progress Schedule | 4 | NTP+5 | ||||||||
| 4 | Mobility Plan | 4 | NTP+5 | ||||||||
| 5 | Quality Control Plan | 4 | NTP+10 | ||||||||
| 6 | Waste & construction debris management | 4 | Final Inspection | ||||||||
| 7 | As-Built drawings | 4 | FI+15 | ||||||||
| 8 | Spatial Data | 4 | FI+15 | ||||||||
| 9 | Key Personnel | 4 | NTP+15 | ||||||||
| 10 | Safety Program | 4 | Before any work execution | ||||||||
| 11 | Warranty letter | 4 | Acceptance+15 | ||||||||
| SECTION 33 71 00 | |||||||||||
| 12 | High Voltage Conductors | 4 | |||||||||
| 13 | Insulators | 4 | 4 | ||||||||
| 14 | Concrete poles | 4 | 4 | ||||||||
| 15 | Nameplates | 4 | |||||||||
| 16 | SF6 circuit breaker | 4 | 4 | 4 | |||||||
| 17 | Cutouts | 4 | 4 | 4 | |||||||
| 18 | Surge arresters | 4 | 4 | 4 | 4 | ||||||
| 19 | Crossarm hardware | 4 | |||||||||
| 20 | Ground rod | 4 | |||||||||
| 21 | Ground wires | 4 | |||||||||
| 22 | Exothermic welding | 4 | |||||||||
| 23 | Warning signs | 4 | |||||||||
| 24 | Rigid steel conduit | 4 | |||||||||
| 25 | Insulated low voltage conductors | 4 | |||||||||
| 26 | Transformer | 4 | 4 | ||||||||
| 27 | Adhesive for identification plates | 4 | |||||||||
| 28 | Galvanized steel crossarms and supports | 4 | |||||||||
| 29 | Transformer supports | 4 | |||||||||
| 30 | Sag and Tension Tables | 4 | |||||||||
| 31 | Elevation Drawings | 4 | |||||||||
| 32 | Field test plan | 4 | 10 days before testing execution | ||||||||
| 33 | Field quality control | 4 | 10 days after testing completion | ||||||||
| 34 | Ground resistance test reports | 4 | 10 days after testing completion | ||||||||
| 35 | Operation and Maintenance Manuals | 4 | FI+15 | ||||||||
| 36 | Installation of high voltage lines - company LAT1 | 4 | NTP+15 | ||||||||
| 37 | Installer of high voltage lines - Individual | 4 | NTP+30 | ||||||||
| 38 | Manufacturer approval | 4 | NTP+15 | ||||||||
| 39 | Transformer losses report | 4 | |||||||||
| 40 | Surge Arrester Hardware for existing SF6 switch | 4 | |||||||||
| 41 | Pole identification plates | 4 | |||||||||
| 42 | Transformer routine test | 4 | |||||||||
| 43 | Certified landfill tickets | 4 | FI-15 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 10-1001 F4 | TÍTULO DE PROYECTO: | |||
| REPARAR SISTEMA DISTRIBUCIÓN ELÉCTRICO AÉREO FASE 4 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | |||||||||||
| 1 | Programa de obra | NTP+5 | |||||||||
| 2 | Plan de obra | NTP+5 | |||||||||
| SECCIÓN 01 11 01 | |||||||||||
| 3 | Programa de avance de obras | 4 | NTP+5 | ||||||||
| 4 | Plan de movilización | 4 | NTP+5 | ||||||||
| 5 | Plan de control de calidad | 4 | NTP+10 | ||||||||
| 6 | Gestión de residuos y escombros | 4 | Inspección final | ||||||||
| 7 | Planos As-Builts | 4 | IF+15 | ||||||||
| 8 | Datos espaciales | 4 | IF+15 | ||||||||
| 9 | Personal clave | 4 | NTP+15 | ||||||||
| 10 | Plan de seguridad | 4 | Antes de cualquier trabajo | ||||||||
| 11 | Carta de garantía | 4 | Aceptación + 15 | ||||||||
| SECCIÓN 33 71 00 | |||||||||||
| 12 | Conductores de alta tensión | 4 | |||||||||
| 13 | Aisladores | 4 | 4 | ||||||||
| 14 | Postes de hormigón | 4 | 4 | ||||||||
| 15 | Placas identificativas | 4 | |||||||||
| 16 | Interruptor SF6 | 4 | 4 | 4 | |||||||
| 17 | Seccionadores fusible | 4 | 4 | 4 | |||||||
| 18 | Autoválvulas | 4 | 4 | 4 | 4 | ||||||
| 19 | Herraje de armados | 4 | |||||||||
| 20 | Picas de tierra | 4 | |||||||||
| 21 | Cables de tierra | 4 | |||||||||
| 22 | Soldaduras exotérmicas | 4 | |||||||||
| 23 | Señalización de advertencia | 4 | |||||||||
| 24 | Conductos de acero rígido | 4 | |||||||||
| 25 | Cables aislados de baja tensión | 4 | |||||||||
| 26 | Transformadores | 4 | 4 | ||||||||
| 27 | Adhesivo para placas de identificación | 4 | |||||||||
| 28 | Armados de acero galvanizado y soportes | 4 | |||||||||
| 29 | Soportes para trnasformadores | 4 | |||||||||
| 30 | Tablas de Tendido | 4 | |||||||||
| 31 | Perfiles de Línea Eléctrica | 4 | |||||||||
| 32 | Plan de pruebas in-situ | 4 | 10 días antes ejecudión pruebas | ||||||||
| 33 | Control de calidad en obra | 4 | 10 días tras ejecudión pruebas | ||||||||
| 34 | Informes de pruebas de puesta a tierra | 4 | 10 días tras ejecudión pruebas | ||||||||
| 35 | Manuales de funcionamiento y mantenimiento | 4 | IF+15 | ||||||||
| 36 | Instalación línea alta tensión - empresa LAT1 | 4 | NTP+15 | ||||||||
| 37 | Instalador de líneas alta tensión - carnet instalador | 4 | NTP+30 | ||||||||
| 38 | Homologación del fabricante | 4 | NTP+15 | ||||||||
| 39 | Informe de pérdidas de transformadores | 4 | |||||||||
| 40 | Cjto. Pararrayos seccionadores existentes | 4 | |||||||||
| 41 | Placas de identificación de postes | 4 | |||||||||
| 42 | Pruebas rutinarias de transformadores | 4 | |||||||||
| 43 | Recibos de vertedero autorizado | 4 | FI-15 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N