10-1001P4_AF_3052_Ktor.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
Repair Overhead Electrical Distribution System Phase 4 Federal contract opportunity
Solicitation number
FA5575-15-B-0012
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 5 Cost Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Repair Overhead Electrical Distribution System Phase 4, newest first.
File Type Posted
FA5575-15-B-0012-0001.pdf PDF
R-705-02-PH4-AMEND_1.pdf PDF
R-705-03-PH4-AMEND_1.pdf PDF
10-1001-P4_01_of_02.pdf PDF
10-1001P4_Especificaciones_Espaol.pdf PDF
10-1001P4_AF66.xlsx XLSX spreadsheet
10-1001-P4_02_of_02.pdf PDF
10-1001P4_Specifications_English.pdf PDF
FA5575-15-B-0012.pdf PDF
PP_reference_list.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ktor

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORON AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR. OVERHEAD ELECTRICAL DISTRIBUTION SYSTEM, Ph 4
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 10-1001P4MORON AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINEITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
EXISTING FEEDER #1 LINE
LÍNEA EXISTENTE FEEDER #1
1Remove & dispose existing crossarm hardware
Desmontar y tratar aparellaje existente en crucetasLs
2Install/Re-install new/existing crossarms hardware
Instalar/Reinstalar herraje nuevo/existenteEa
3Install new warning signs & pole identification plates
Instalar nuevas señales de peligro y placas identificación postesEa
4Grounding
Puestas a tierraEa
5High voltage neutral grounding
Puesta a tierra de neutro de ATEa
6New AWG 6 hard drawn copper cable
Nuevo cable de cobre estirado AWG 6Lm
7Fuse cutouts
Seccionadores fusiblesEa
8Surge arrester kits for existing SF6 switches
Kits de pararrayos para seccionadores SF6 existentesEa
9Install re-inforced vibrated concrete pole, 400 daN, 11m height
Instalación poste de hormigón vibrado reforzado, 400 daN,11mEa
TOTAL EXISTING FEEDER #1 LINE
TOTAL LÍNEA EXISTENTE FEEDER #1
EXISTING FEEDER #2 LINE
LÍNEA EXISTENTE FEEDER #2
10Remove & dispose existing wooden crossarms and hardware
Desmontar y tratar crucetas de madera existentes y aparellajeLs
11Install/Re-install new/existing crossarms hardware
Instalar/Reinstalar herraje nuevo/existenteEa
12Install new galv. steel crossarms & associated hardware
Instalar nuevas crucetas de acero galvanizado y material aux.Ea
13Install new warning signs & pole identification plates
Instalar nuevas señales de peligro y placas identificación postesEa
14Grounding
Puestas a tierraEa
15High voltage neutral grounding
Puesta a tierra de neutro de ATEa
16New AWG 6 hard drawn copper cable
Nuevo cable de cobre estirado AWG 6Lm
17Surge arresters
AutoválvulasEa
18Fuse cutouts
Seccionadores fusiblesEa
19New galv. steel transformer support
Nuevos soportes transformador acero galvanizadoEa
20SF6 outdoor switch breaker type IA-780 w/surge arrester
Int. seccionador SF6 servicio ext. tipo IA-780 con pararrayosEa
21Surge arrester kits for existing SF6 switches
Kits de pararrayos para seccionadores SF6 existentesEa
22Install re-inforced vibrated concrete pole, 1000 daN, 13m height
Instalación poste de hormigón vibrado reforzado, 1000 daN,13mEa
23Install re-inforced vibrated concrete pole, 800 daN, 13m height
Instalación poste de hormigón vibrado reforzado, 800 daN,13mEa
24Install re-inforced vibrated concrete pole, 800 daN, 11m height
Instalación poste de hormigón vibrado reforzado, 800 daN,11mEa
25Install re-inforced vibrated concrete pole, 400 daN, 11m height
Instalación poste de hormigón vibrado reforzado, 400 daN,11mEa
26Install re-inforced vibrated concrete pole, 250 daN, 11m height
Instalación poste de hormigón vibrado reforzado, 250 daN,11mEa
TOTAL EXISTING FEEDER #2 LINE
TOTAL LÍNEA EXISTENTE FEEDER #2
EXISTING FEEDER #3 LINE
LÍNEA EXISTENTE FEEDER #3
27Remove & dispose existing wooden crossarms and hardware
Desmontar y tratar crucetas de madera existentes y aparellajeLs
28Install new galv. steel crossarms & associated hardware
Instalar nuevas crucetas de acero galvanizado y material aux.Ea
29Install new warning signs & pole identification plates
Instalar nuevas señales de peligro y placas identificación postesEa
30Grounding
Puestas a tierraEa
31High voltage neutral grounding
Puesta a tierra de neutro de ATEa
32New AWG 6 hard drawn copper cable
Nuevo cable de cobre estirado AWG 6Lm
33Surge arresters
AutoválvulasEa
34Fuse cutouts
Seccionadores fusiblesEa
35New 3x50 KVA pole-mounted transformer
Nuevo transformador en poste 3x50KVAEa
36New galv. steel transformer support
Nuevos soportes transformador acero galvanizadoEa
37Surge arrester kits for existing SF6 switches
Kits de pararrayos para seccionadores SF6 existentesEa
38Install re-inforced vibrated concrete pole, 1000 daN, 13m height
Instalación poste de hormigón vibrado reforzado, 1000 daN,13mEa
39Install re-inforced vibrated concrete pole, 800 daN, 13m height
Instalación poste de hormigón vibrado reforzado, 800 daN,13mEa
40Install re-inforced vibrated concrete pole, 800 daN, 11m height
Instalación poste de hormigón vibrado reforzado, 800 daN,11mEa
41Install re-inforced vibrated concrete pole, 400 daN, 11m height
Instalación poste de hormigón vibrado reforzado, 400 daN,11mEa
42Install re-inforced vibrated concrete pole, 250 daN, 11m height
Instalación poste de hormigón vibrado reforzado, 250 daN,11mEa
TOTAL EXISTING FEEDER #3 LINE
TOTAL LÍNEA EXISTENTE FEEDER #3
EXISTING FEEDER #4 LINE
LÍNEA EXISTENTE FEEDER #4
43Remove & dispose existing wooden crossarms and hardware
Desmontar y tratar crucetas de madera existentes y aparellajeLs
44Install new galv. steel crossarms & associated hardware
Instalar nuevas crucetas de acero galvanizado y material aux.Ea
45Install new warning signs & pole identification plates
Instalar nuevas señales de peligro y placas identificación postesEa
46Grounding
Puestas a tierraEa
47High voltage neutral grounding
Puesta a tierra de neutro de ATEa
48New AWG 6 hard drawn copper cable
Nuevo cable de cobre estirado AWG 6Lm
49SF6 outdoor switch breaker type IA-780 w/surge arrester
Int. seccionador SF6 servicio ext. tipo IA-780 con pararrayosEa
50Install re-inforced vibrated concrete pole, 800 daN, 13m height
Instalación poste de hormigón vibrado reforzado, 800 daN,13mEa
51Install re-inforced vibrated concrete pole, 400 daN, 11m height
Instalación poste de hormigón vibrado reforzado, 400 daN,11mEa
TOTAL EXISTING FEEDER #4 LINE
TOTAL LÍNEA EXISTENTE FEEDER #4
SUMMARY
RESÚMEN
EXISTING FEEDER #1 LINE
LÍNEA EXISTENTE FEEDER #1
EXISTING FEEDER #2 LINE
LÍNEA EXISTENTE FEEDER #2
EXISTING FEEDER #3 LINE
LÍNEA EXISTENTE FEEDER #3
EXISTING FEEDER #4 LINE
LÍNEA EXISTENTE FEEDER #4
TOTAL
TOTAL

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD % 0.00

SUBTOTAL 0.00

PROFIT % 0.00

TOTAL PROJECT (EUROS) 0.00

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N