10-1001P4_AF_3052_Ktor.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Repair Overhead Electrical Distribution System Phase 4 Federal contract opportunity
- Solicitation number
- FA5575-15-B-0012
About this file
Attachment 5 Cost Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5575-15-B-0012-0001.pdf | ||
| R-705-02-PH4-AMEND_1.pdf | ||
| R-705-03-PH4-AMEND_1.pdf | ||
| 10-1001-P4_01_of_02.pdf | ||
| 10-1001P4_Especificaciones_Espaol.pdf | ||
| 10-1001P4_AF66.xlsx | XLSX spreadsheet | |
| 10-1001-P4_02_of_02.pdf | ||
| 10-1001P4_Specifications_English.pdf | ||
| FA5575-15-B-0012.pdf | ||
| PP_reference_list.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktor
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORON AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR. OVERHEAD ELECTRICAL DISTRIBUTION SYSTEM, Ph 4 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1001P4 | MORON AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LINE | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| EXISTING FEEDER #1 LINE | ||||||||||
| LÍNEA EXISTENTE FEEDER #1 | ||||||||||
| 1 | Remove & dispose existing crossarm hardware | |||||||||
| Desmontar y tratar aparellaje existente en crucetas | Ls | |||||||||
| 2 | Install/Re-install new/existing crossarms hardware | |||||||||
| Instalar/Reinstalar herraje nuevo/existente | Ea | |||||||||
| 3 | Install new warning signs & pole identification plates | |||||||||
| Instalar nuevas señales de peligro y placas identificación postes | Ea | |||||||||
| 4 | Grounding | |||||||||
| Puestas a tierra | Ea | |||||||||
| 5 | High voltage neutral grounding | |||||||||
| Puesta a tierra de neutro de AT | Ea | |||||||||
| 6 | New AWG 6 hard drawn copper cable | |||||||||
| Nuevo cable de cobre estirado AWG 6 | Lm | |||||||||
| 7 | Fuse cutouts | |||||||||
| Seccionadores fusibles | Ea | |||||||||
| 8 | Surge arrester kits for existing SF6 switches | |||||||||
| Kits de pararrayos para seccionadores SF6 existentes | Ea | |||||||||
| 9 | Install re-inforced vibrated concrete pole, 400 daN, 11m height | |||||||||
| Instalación poste de hormigón vibrado reforzado, 400 daN,11m | Ea | |||||||||
| TOTAL EXISTING FEEDER #1 LINE | ||||||||||
| TOTAL LÍNEA EXISTENTE FEEDER #1 |
| EXISTING FEEDER #2 LINE | ||
| LÍNEA EXISTENTE FEEDER #2 | ||
| 10 | Remove & dispose existing wooden crossarms and hardware | |
| Desmontar y tratar crucetas de madera existentes y aparellaje | Ls | |
| 11 | Install/Re-install new/existing crossarms hardware | |
| Instalar/Reinstalar herraje nuevo/existente | Ea | |
| 12 | Install new galv. steel crossarms & associated hardware | |
| Instalar nuevas crucetas de acero galvanizado y material aux. | Ea | |
| 13 | Install new warning signs & pole identification plates | |
| Instalar nuevas señales de peligro y placas identificación postes | Ea | |
| 14 | Grounding | |
| Puestas a tierra | Ea | |
| 15 | High voltage neutral grounding | |
| Puesta a tierra de neutro de AT | Ea | |
| 16 | New AWG 6 hard drawn copper cable | |
| Nuevo cable de cobre estirado AWG 6 | Lm | |
| 17 | Surge arresters | |
| Autoválvulas | Ea | |
| 18 | Fuse cutouts | |
| Seccionadores fusibles | Ea | |
| 19 | New galv. steel transformer support | |
| Nuevos soportes transformador acero galvanizado | Ea | |
| 20 | SF6 outdoor switch breaker type IA-780 w/surge arrester | |
| Int. seccionador SF6 servicio ext. tipo IA-780 con pararrayos | Ea | |
| 21 | Surge arrester kits for existing SF6 switches | |
| Kits de pararrayos para seccionadores SF6 existentes | Ea | |
| 22 | Install re-inforced vibrated concrete pole, 1000 daN, 13m height | |
| Instalación poste de hormigón vibrado reforzado, 1000 daN,13m | Ea | |
| 23 | Install re-inforced vibrated concrete pole, 800 daN, 13m height | |
| Instalación poste de hormigón vibrado reforzado, 800 daN,13m | Ea | |
| 24 | Install re-inforced vibrated concrete pole, 800 daN, 11m height | |
| Instalación poste de hormigón vibrado reforzado, 800 daN,11m | Ea | |
| 25 | Install re-inforced vibrated concrete pole, 400 daN, 11m height | |
| Instalación poste de hormigón vibrado reforzado, 400 daN,11m | Ea | |
| 26 | Install re-inforced vibrated concrete pole, 250 daN, 11m height | |
| Instalación poste de hormigón vibrado reforzado, 250 daN,11m | Ea | |
| TOTAL EXISTING FEEDER #2 LINE | ||
| TOTAL LÍNEA EXISTENTE FEEDER #2 |
| EXISTING FEEDER #3 LINE | ||
| LÍNEA EXISTENTE FEEDER #3 | ||
| 27 | Remove & dispose existing wooden crossarms and hardware | |
| Desmontar y tratar crucetas de madera existentes y aparellaje | Ls | |
| 28 | Install new galv. steel crossarms & associated hardware | |
| Instalar nuevas crucetas de acero galvanizado y material aux. | Ea | |
| 29 | Install new warning signs & pole identification plates | |
| Instalar nuevas señales de peligro y placas identificación postes | Ea | |
| 30 | Grounding | |
| Puestas a tierra | Ea | |
| 31 | High voltage neutral grounding | |
| Puesta a tierra de neutro de AT | Ea | |
| 32 | New AWG 6 hard drawn copper cable | |
| Nuevo cable de cobre estirado AWG 6 | Lm | |
| 33 | Surge arresters | |
| Autoválvulas | Ea | |
| 34 | Fuse cutouts | |
| Seccionadores fusibles | Ea | |
| 35 | New 3x50 KVA pole-mounted transformer | |
| Nuevo transformador en poste 3x50KVA | Ea | |
| 36 | New galv. steel transformer support | |
| Nuevos soportes transformador acero galvanizado | Ea | |
| 37 | Surge arrester kits for existing SF6 switches | |
| Kits de pararrayos para seccionadores SF6 existentes | Ea | |
| 38 | Install re-inforced vibrated concrete pole, 1000 daN, 13m height | |
| Instalación poste de hormigón vibrado reforzado, 1000 daN,13m | Ea | |
| 39 | Install re-inforced vibrated concrete pole, 800 daN, 13m height | |
| Instalación poste de hormigón vibrado reforzado, 800 daN,13m | Ea | |
| 40 | Install re-inforced vibrated concrete pole, 800 daN, 11m height | |
| Instalación poste de hormigón vibrado reforzado, 800 daN,11m | Ea | |
| 41 | Install re-inforced vibrated concrete pole, 400 daN, 11m height | |
| Instalación poste de hormigón vibrado reforzado, 400 daN,11m | Ea | |
| 42 | Install re-inforced vibrated concrete pole, 250 daN, 11m height | |
| Instalación poste de hormigón vibrado reforzado, 250 daN,11m | Ea | |
| TOTAL EXISTING FEEDER #3 LINE | ||
| TOTAL LÍNEA EXISTENTE FEEDER #3 |
| EXISTING FEEDER #4 LINE | ||
| LÍNEA EXISTENTE FEEDER #4 | ||
| 43 | Remove & dispose existing wooden crossarms and hardware | |
| Desmontar y tratar crucetas de madera existentes y aparellaje | Ls | |
| 44 | Install new galv. steel crossarms & associated hardware | |
| Instalar nuevas crucetas de acero galvanizado y material aux. | Ea | |
| 45 | Install new warning signs & pole identification plates | |
| Instalar nuevas señales de peligro y placas identificación postes | Ea | |
| 46 | Grounding | |
| Puestas a tierra | Ea | |
| 47 | High voltage neutral grounding | |
| Puesta a tierra de neutro de AT | Ea | |
| 48 | New AWG 6 hard drawn copper cable | |
| Nuevo cable de cobre estirado AWG 6 | Lm | |
| 49 | SF6 outdoor switch breaker type IA-780 w/surge arrester | |
| Int. seccionador SF6 servicio ext. tipo IA-780 con pararrayos | Ea | |
| 50 | Install re-inforced vibrated concrete pole, 800 daN, 13m height | |
| Instalación poste de hormigón vibrado reforzado, 800 daN,13m | Ea | |
| 51 | Install re-inforced vibrated concrete pole, 400 daN, 11m height | |
| Instalación poste de hormigón vibrado reforzado, 400 daN,11m | Ea | |
| TOTAL EXISTING FEEDER #4 LINE | ||
| TOTAL LÍNEA EXISTENTE FEEDER #4 |
| SUMMARY |
| RESÚMEN |
| EXISTING FEEDER #1 LINE |
| LÍNEA EXISTENTE FEEDER #1 |
| EXISTING FEEDER #2 LINE |
| LÍNEA EXISTENTE FEEDER #2 |
| EXISTING FEEDER #3 LINE |
| LÍNEA EXISTENTE FEEDER #3 |
| EXISTING FEEDER #4 LINE |
| LÍNEA EXISTENTE FEEDER #4 |
| TOTAL |
| TOTAL |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD % 0.00
SUBTOTAL 0.00
PROFIT % 0.00
TOTAL PROJECT (EUROS) 0.00
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N