14-1006_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Repair/Survey Sewer Sanitary Lines Federal contract opportunity
Solicitation number
FA5575-15-B-0006
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 3 AF 66 Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Survey Sewer Sanitary Lines, newest first.
File Type Posted
FA5575-15-B-0006-001.doc DOC document
FA5575-15-B-0006 _RPR_Sewer_Lines.pdf PDF
14-1006_Drawings.pdf PDF
14-1006_Specifications.pdf PDF
Attachment_5_-_PPI_reference_list.doc DOC document
14-1006_Especificaciones.pdf PDF
14-1006_AF3052_KTR.xlsx XLSX spreadsheet
FA5575-15-B-0006 _Synopsis.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 14-1006PROJECT TITLE
RPR/SURVEY SEWER SANITARY LINESSOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 01 11 00
1Construction Schedule4NTP+15
SECTION 01 11 01
2Progress Schedule4NTP+10
3Mobility Plan4NTP+15
4Quality Control Plan4NTP+15
5Environmental Protection Plan4NTP+15
6Waste & construction debris management4Final Inspection
7As-Built drawings4FI+15
8Spatial Data4FI+15
9Key Personnel4NTP+15
10Personel listing4NTP+15
11Safety Program4NTP+15
12Warranty letter4FI+30
SECTION 33 30 00
13PVC pipe and fittings4
14Round manhole (less than 1.2 m depth)4
15Round manhole (more than 1.2 m depth)4
16Round manhole frame and cover4
17Sewer pipe protection film and sealant4
18Pipe Cleaning and Inspection Procedures4
19Plan and topographic profile for new pipe installation4NTP+20
20Color coding pipe condition drawings4Final Inspection
21CCTV Recordings and Report Logs4Final Inspection
22Contractor Qualifications for CCTV inspection4

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 14-1006TÍTULO DE PROYECTO:
REPARAR/INSPECCIONAR LÍNEAS DE SANEAMIENTOSOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 01 11 00
1Programa de de obra4NTP+15
SECCIÓN 01 11 01
2Programa de avance de obras4NTP+10
3Plan de movilización4NTP+15
4Plan de control de calidad4NTP+15
5Plan de protección medioambiental4NTP+15
6Gestión de residuos y escombros4Inspección final
7Planos As-Builts4IF+15
8Datos espaciales4IF+15
9Personal clave4NTP+15
10Listado de personal4NTP+15
11Plan de seguridad4NTP+15
12Carta de garantía4IF+30
SECCIÓN 33 30 00
13Tubería y accesorios4
14Arquetas de registro circulares menores de 1.2 m de profundidad4
15Pozos de registro circulares mayores de 1.2 m de profundidad4
16Marcos y tapas de pozos de registro circulares4
17Lámina de protección y sellante para tubería de saneamiento4
18Procedimientos de limpieza e inspección de tubería4
19Planta y perfil topográfico para instalación de nueva tubería4NTP+20
20Planos del estado de tuberías con código de colores4Inspección final
21Grabaciones e informes de inspección CCTV4Inspección final
22Cualificación de empresa de inspección CCTV4