14-1006_AF3052_KTR.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Repair/Survey Sewer Sanitary Lines Federal contract opportunity
- Solicitation number
- FA5575-15-B-0006
About this file
Attachment 2 AF 3052
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5575-15-B-0006-001.doc | DOC document | |
| 14-1006_Specifications.pdf | ||
| 14-1006_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| Attachment_5_-_PPI_reference_list.doc | DOC document | |
| 14-1006_Especificaciones.pdf | ||
| FA5575-15-B-0006 _RPR_Sewer_Lines.pdf | ||
| 14-1006_Drawings.pdf | ||
| FA5575-15-B-0006 _Synopsis.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KTR
| COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR/SURVEY SEWER SANITARY LINES | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 14-1006 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Topographic Survey | |||||||||
| Replanteamiento topográfico | JOB | |||||||||
| 2 | Removal of existing installation | |||||||||
| Demolición de instalaciones existentes | JOB | |||||||||
| 3 | PVC corrugated pipe UNE 53332 RCE 8 DN 315 mm | |||||||||
| Tubo de PVC corrugado UNE 53332 RCE 8 DN 315 mm | Lm | |||||||||
| 4 | PVC corrugated pipe UNE 53332 RCE 8 DN 250 mm | |||||||||
| Tubo de PVC corrugado UNE 53332 RCE 8 DN 250 mm | Lm | |||||||||
| 5 | PVC corrugated pipe UNE 53332 RCE 8 DN 200 mm | |||||||||
| Tubo de PVC corrugado UNE 53332 RCE 8 DN 200 mm | Lm | |||||||||
| 6 | PVC corrugated pipe UNE 53332 RCE 8 DN 160 mm | |||||||||
| Tubo de PVC corrugado UNE 53332 RCE 8 DN 160 mm | Lm | |||||||||
| 7 | New complete sewer manhole | |||||||||
| Nueva arqueta de saneamiento completa | Ea | |||||||||
| 8 | Repair existing sewer manhole | |||||||||
| Reparar arqueta de saneamiento existente | Ea | |||||||||
| 9 | Drilled road crossing for DN 315 mm pipe | |||||||||
| Paso de carretera con topo para tubería DN 315 mm | Ea | |||||||||
| 10 | Drilled road crossing for DN 250 mm pipe | |||||||||
| Paso de carretera con topo para tubería DN 250 mm | Ea | |||||||||
| 11 | Drilled road crossing for DN 200 mm pipe | |||||||||
| Paso de carretera con topo para tubería DN 200 mm | Ea | |||||||||
| 12 | Drilled road crossing for DN 160 mm pipe | |||||||||
| Paso de carretera con topo para tubería DN 160 mm | Ea | |||||||||
| 13 | Repair areas Affected by the Execution of the Project | |||||||||
| Reparar zonas afectadas por la ejecución del proyecto | JOB | |||||||||
| 14 | Cleaning, inspection and final report of sewer system | |||||||||
| Limpieza, inspección e informe final sistema de saneamiento | JOB | |||||||||
| TOTAL | ||||||||||
| TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
TOTAL PROJECT EUROS
DATE: FIRM NAME:
TITLE: PREPARED BY:
&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .