14-1006_AF3052_KTR.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Repair/Survey Sewer Sanitary Lines Federal contract opportunity
Solicitation number
FA5575-15-B-0006
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 2 AF 3052

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Survey Sewer Sanitary Lines, newest first.
File Type Posted
FA5575-15-B-0006-001.doc DOC document
14-1006_Specifications.pdf PDF
14-1006_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
Attachment_5_-_PPI_reference_list.doc DOC document
14-1006_Especificaciones.pdf PDF
FA5575-15-B-0006 _RPR_Sewer_Lines.pdf PDF
14-1006_Drawings.pdf PDF
FA5575-15-B-0006 _Synopsis.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KTR

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR/SURVEY SEWER SANITARY LINES
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 14-1006MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Topographic Survey
Replanteamiento topográficoJOB
2Removal of existing installation
Demolición de instalaciones existentesJOB
3PVC corrugated pipe UNE 53332 RCE 8 DN 315 mm
Tubo de PVC corrugado UNE 53332 RCE 8 DN 315 mmLm
4PVC corrugated pipe UNE 53332 RCE 8 DN 250 mm
Tubo de PVC corrugado UNE 53332 RCE 8 DN 250 mmLm
5PVC corrugated pipe UNE 53332 RCE 8 DN 200 mm
Tubo de PVC corrugado UNE 53332 RCE 8 DN 200 mmLm
6PVC corrugated pipe UNE 53332 RCE 8 DN 160 mm
Tubo de PVC corrugado UNE 53332 RCE 8 DN 160 mmLm
7New complete sewer manhole
Nueva arqueta de saneamiento completaEa
8Repair existing sewer manhole
Reparar arqueta de saneamiento existenteEa
9Drilled road crossing for DN 315 mm pipe
Paso de carretera con topo para tubería DN 315 mmEa
10Drilled road crossing for DN 250 mm pipe
Paso de carretera con topo para tubería DN 250 mmEa
11Drilled road crossing for DN 200 mm pipe
Paso de carretera con topo para tubería DN 200 mmEa
12Drilled road crossing for DN 160 mm pipe
Paso de carretera con topo para tubería DN 160 mmEa
13Repair areas Affected by the Execution of the Project
Reparar zonas afectadas por la ejecución del proyectoJOB
14Cleaning, inspection and final report of sewer system
Limpieza, inspección e informe final sistema de saneamientoJOB
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT EUROS

DATE: FIRM NAME:

TITLE: PREPARED BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it. Updated .