Attachment_7_-_Cost_Breakdown.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Replace Base Generators Federal contract opportunity
- Solicitation number
- FA5575-14-R-0005
About this file
Attachment 7
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_Spanish_Specifications.pdf | ||
| FA5575-14-R-0005 _Base_Generators.pdf | ||
| Attachment_5_-_PPI_Questionnaire.doc | DOC document | |
| Attachment_1_-_English_Specifications.pdf | ||
| Attachment_6_-_Schedule_of_Material_Submittals.xlsx | XLSX spreadsheet | |
| Attachment_4_-_PPI_reference_list.doc | DOC document | |
| Attachment_3_-_Project_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktor
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPL. BASE GENERATORS | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1042 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Bldg #165 | ||||||||||
| Edif #165 | ||||||||||
| 1 | Demoler generador, accesorios y transporte a vertedero | |||||||||
| Demolish and dispose of generator and accessories | JOB | |||||||||
| 2 | Grupo electrógeno 80 kW, cableado, conductos y acc. | |||||||||
| Generator 80 kW, wiring, conduits & acc. | Ea | |||||||||
| 3 | Conmutador automático, cableado y acc. | |||||||||
| Automatic Transfer Switch, wiring and acc. | Ea | |||||||||
| 4 | Seccionador de by-pass, cableado y acc. | |||||||||
| By-pass/Isolation Switch, wiring and acc. | Ea | |||||||||
| 5 | Tubería de escape de gases | |||||||||
| Exhaust pipe | Lm | |||||||||
| 6 | Modificaciones paneles eléctricos existentes | |||||||||
| Existing panelboards modifications | Ea | |||||||||
| 7 | Puesta a tierra | |||||||||
| Grounding System | Ea | |||||||||
| Total Bldg #165 | ||||||||||
| Total Edif #165 |
| Bldg #1401 | ||
| Edif #1401 | ||
| 8 | Demoler generador, accesorios y transporte a vertedero | |
| Demolish and dispose of generator and accessories | JOB | |
| 9 | Grupo electrógeno 60 kW, cableado, conductos y acc. | |
| Generator 60 kW, wiring, conduits & acc. | Ea | |
| 10 | Conmutador automático, cableado y acc. | |
| Automatic Transfer Switch, wiring and acc. | Ea | |
| 11 | Seccionador de by-pass, cableado y acc. | |
| By-pass/Isolation Switch, wiring and acc. | Ea | |
| 12 | Copper cable 1x95 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x95 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 13 | Copper cable 1x50 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x50 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 14 | LED power indicator lights, wiring and conduit from ATS | |
| Luces piloto LED, cableado y conducto desde conmut. | Ea | |
| 15 | Puesta a tierra | |
| Grounding System | Ea | |
| Total Bldg #1401 | ||
| Total Edif #1401 |
| Bldg #215 | ||
| Edif #215 | ||
| 16 | Demoler generador, accesorios y transporte a vertedero | |
| Demolish and dispose of generator and accessories | JOB | |
| 17 | Grupo electrógeno 60 kW, cableado, conductos y acc. | |
| Generator 60 kW, wiring, conduits & acc. | Ea | |
| 18 | Conmutador automático, cableado y acc. | |
| Automatic Transfer Switch, wiring and acc. | Ea | |
| 19 | Seccionador de by-pass, cableado y acc. | |
| By-pass/Isolation Switch, wiring and acc. | Ea | |
| 20 | Copper cable 1x95 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x95 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 21 | Copper cable 1x50 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x50 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 22 | 2 1/2" RMC including couplings & accessories | |
| Conducto ac. rígido galv. 2 1/2", incl. manguitos y acc. | Lm | |
| 23 | Puesta a tierra | |
| Grounding System | Ea | |
| Total Bldg #215 | ||
| Total Edif #215 |
| Bldg #901 | ||
| Edif #901 | ||
| 24 | Demoler generador, accesorios y transporte a vertedero | |
| Demolish and dispose of generator and accessories | JOB | |
| 25 | Grupo electrógeno 60 kW, cableado, conductos y acc. | |
| Generator 60 kW, wiring, conduits & acc. | Ea | |
| 26 | Conmutador automático, cableado y acc. | |
| Automatic Transfer Switch, wiring and acc. | Ea | |
| 27 | Seccionador de by-pass, cableado y acc. | |
| By-pass/Isolation Switch, wiring and acc. | Ea | |
| 28 | Copper cable 1x95 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x95 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 29 | Copper cable 1x50 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x50 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 30 | 2 1/2" RMC including couplings & accessories | |
| Conducto ac. rígido galv. 2 1/2", incl. manguitos y acc. | Lm | |
| 31 | Puesta a tierra | |
| Grounding System | Ea | |
| Total Bldg #901 | ||
| Total Edif #901 |
| Bldg #1427 | ||
| Edif #1427 | ||
| 32 | Demoler generador, accesorios y transporte a vertedero | |
| Demolish and dispose of generator and accessories | JOB | |
| 33 | Grupo electrógeno 100 kW, cableado, conductos y acc. | |
| Generator 100 kW, wiring, conduits & acc. | Ea | |
| 34 | Conmutador automático, cableado y acc. | |
| Automatic Transfer Switch, wiring and acc. | Ea | |
| 35 | Seccionador de by-pass, cableado y acc. | |
| By-pass/Isolation Switch, wiring and acc. | Ea | |
| 36 | Copper cable 1x150 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x150 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 37 | Copper cable 1x95 mm2 RZ1-K (AS) 0.6/1 kV | |
| Cable de cobre 1x95 mm2 RZ1-K (AS) 0.6/1 kV | Lm | |
| 38 | 6" RMC including couplings & accessories | |
| Conducto ac. rígido galv. 6", incl. manguitos y acc. | Lm | |
| 39 | Puesta a tierra | |
| Grounding System | Ea | |
| Total Bldg #1427 | ||
| Total Edif #1427 |
| WORK SUMMARY |
| RESUMEN TRABAJOS |
| Building #165 |
| Edificio #165 |
| Building #1401 |
| Edificio #1401 |
| Building #215 |
| Edificio #215 |
| Building #901 |
| Edificio #901 |
| Building #1427 |
| Edificio #21427 |
| GRAND TOTAL |
| GRAN TOTAL |
| ` | |
| TOTAL MATERIAL COSTS |
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
TOTAL PROJECT EUROS
DATE: FIRM NAME:
TITLE: BY:
&"Times New Roman,Regular"AF 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N
File details come from the government source that posted it. Updated .