Attachment_6_-_Schedule_of_Material_Submittals.xlsx
XLSX spreadsheet 46 KB Posted
- Attached to
- Replace Base Generators Federal contract opportunity
- Solicitation number
- FA5575-14-R-0005
About this file
Attachment 6
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_2_-_Spanish_Specifications.pdf | ||
| FA5575-14-R-0005 _Base_Generators.pdf | ||
| Attachment_7_-_Cost_Breakdown.xlsx | XLSX spreadsheet | |
| Attachment_5_-_PPI_Questionnaire.doc | DOC document | |
| Attachment_1_-_English_Specifications.pdf | ||
| Attachment_4_-_PPI_reference_list.doc | DOC document | |
| Attachment_3_-_Project_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 10-1042 | PROJECT TITLE | |||
| RPL BASE GENERATORS | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | ||||||||||
| 1 | Construction Schedule | NTP+5 | ||||||||
| 2 | Work Plan | NTP+5 | ||||||||
| SECTION 01 11 01 | ||||||||||
| 3 | Progress Schedule | 4 | NTP+5 | |||||||
| 4 | Mobility Plan | 4 | NTP+5 | |||||||
| 5 | Quality Control Plan | 4 | NTP+5 | |||||||
| 6 | Waste & construction debris management | 4 | Final Inspection | |||||||
| 7 | As-Built drawings | 4 | FI+15 | |||||||
| 8 | Spatial Data | 4 | FI+15 | |||||||
| 9 | Key Personnel | 4 | NTP+5 | |||||||
| 10 | Personel listing | 4 | NTP+10 | |||||||
| 11 | Safety Program | 4 | NTP+5 | |||||||
| 12 | Warranty letter | 4 | FI+30 | |||||||
| SECTION 26 20 00 | ||||||||||
| 13 | Conduit and fittings, 1 x type | 4 | ||||||||
| 14 | Junction and pull boxes | 4 | ||||||||
| 15 | Wires and cables | 4 | ||||||||
| 16 | Circuit breakers | 4 | ||||||||
| 17 | LED Pilot Lights | 4 | ||||||||
| 18 | Labels | 4 | ||||||||
| 19 | Devices subject to manual operation | 4 | Facility Acceptance -5 | |||||||
| 20 | 1000-Volt wiring test | 4 | Facility Acceptance -5 | |||||||
| 21 | Single line diagram of the "as-built" | 4 | ||||||||
| 22 | Schematic diagram | 4 | ||||||||
| 23 | Active electrical equipment | 4 | ||||||||
| SECTION 26 32 13.00 20 | ||||||||||
| 24 | Engine-generator set and auxiliary equipment | 4 | ||||||||
| 25 | Auxiliary systems | 4 | ||||||||
| 26 | Engine generator set data | 4 | ||||||||
| 27 | Engine generator set efficiencies | 4 | ||||||||
| 28 | Diesel engine data | 4 | ||||||||
| 29 | Generator and exciter data | 4 | ||||||||
| 30 | Auxiliary systems and equipment | 4 | ||||||||
| 31 | Capacity calculations for engine-generator set | 4 | ||||||||
| 32 | Calculations for brake mean effective pressure | 4 | ||||||||
| 33 | Torsional vibration stress analysis computations | 4 | ||||||||
| 34 | Capacity calculations for batteries | 4 | ||||||||
| 35 | Acceptance checks and tests | 4 | Before Functional Tests | |||||||
| 36 | Functional acceptance tests | 4 | Facility Acceptance -15 | |||||||
| 37 | Functional acceptance tests procedure | 4 | ||||||||
| 38 | Vibration isolation system certification | 4 | ||||||||
| 39 | Fuel system certification | 4 | ||||||||
| 40 | Start-up technician qualification resume | 4 | ||||||||
| 41 | Instructor's qualification resume | 4 | ||||||||
| 42 | Engine tests | 4 | Before shipment | |||||||
| 43 | Generator set routine tests | 4 | Before shipment | |||||||
| 44 | Generator set design tests | 4 | ||||||||
| 45 | Diesel engine-generator set | 4 | ||||||||
| 46 | Auxiliary systems and equipment | 4 | ||||||||
| 47 | Preliminary assembled O&M manuals | 4 | ||||||||
| 48 | Posted operating instructions | 4 | ||||||||
| 49 | Training plan | 4 | ||||||||
| SECTION 26 36 00.00 10 | ||||||||||
| 50 | Detail drawings | 4 | ||||||||
| 51 | Equipment | 4 | 4 | 4 | ||||||
| 52 | Installation | 4 | ||||||||
| 53 | Material | 4 | 4 | |||||||
| 54 | Testing | 4 | Facility Acceptance -7 | |||||||
| 55 | Switching equipment | 4 | ||||||||
| 56 | Switching equipment | 4 | ||||||||
| 57 | Instructions | 4 | ||||||||
| SECTION 33 71 02.00 20 | ||||||||||
| 58 | Conduits | 4 | ||||||||
| 59 | Underground low voltage cables | 4 | ||||||||
| 60 | Buried warning and identification tape | 4 | ||||||||
| 61 | Ground wires | 4 | ||||||||
| 62 | Grounding test/Bar wells | 4 | ||||||||
| 63 | Grounding Bars | 4 | ||||||||
| 64 | Ground rods | 4 | ||||||||
| 65 | Exothermic welding | 4 | 4 | |||||||
| 66 | Field acceptance checks and tests | 4 | Facility Acceptance -5 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 10-1042 | TÍTULO DE PROYECTO: | |||
| REEMPLAZAR GRUPOS ELECTRÓGENOS | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | ||||||||||
| 1 | Programa de obra | NTP+5 | ||||||||
| 2 | Plan de obra | NTP+5 | ||||||||
| SECCIÓN 01 11 01 | ||||||||||
| 3 | Programa de avance de obras | 4 | NTP+5 | |||||||
| 4 | Plan de movilización | 4 | NTP+5 | |||||||
| 5 | Plan de control de calidad | 4 | NTP+5 | |||||||
| 6 | Gestión de residuos y escombros | 4 | Inspección final | |||||||
| 7 | Planos As-Builts | 4 | IF+15 | |||||||
| 8 | Datos espaciales | 4 | IF+15 | |||||||
| 9 | Personal clave | 4 | NTP+5 | |||||||
| 10 | Listado de personal | 4 | NTP+10 | |||||||
| 11 | Plan de seguridad | 4 | NTP+5 | |||||||
| 12 | Carta de garantía | 4 | IF+30 | |||||||
| SECCIÓN 26 20 00 | ||||||||||
| 13 | Tubos y accesorios, 1 x tipo | 4 | ||||||||
| 14 | Cajas de conexión y paso | 4 | ||||||||
| 15 | Conductores y cables | 4 | ||||||||
| 16 | Interruptores magnetotérmicos | 4 | ||||||||
| 17 | Luces piloto LED | 4 | ||||||||
| 18 | Etiquetas | 4 | ||||||||
| 19 | Dispositivos sujetos a operación manual | 4 | Aceptación Edificio -5 | |||||||
| 20 | Pruebas de cableado de 1000 voltios | 4 | Aceptación Edificio -5 | |||||||
| 21 | Esquema unifialr del sistema eléctrico del edificio | 4 | ||||||||
| 22 | Diagrama esquemático del sistema de control eléctrico | 4 | ||||||||
| 23 | Equipo eléctrico activo | 4 | ||||||||
| SECCIÓN 26 32 13.00 20 | ||||||||||
| 24 | Grupo electrógeno y equipo auxiliar | 4 | ||||||||
| 25 | Sistemas auxiliares | 4 | ||||||||
| 26 | Datos de grupo electrógeno | 4 | ||||||||
| 27 | Eficiencias de grupo electrógeno | 4 | ||||||||
| 28 | Motor diesel | 4 | ||||||||
| 29 | Grupo electrógeno y excitatriz | 4 | ||||||||
| 30 | Equipos y sistemas auxiliares | 4 | ||||||||
| 31 | Cálculos de capacidad del grupo electrógeno | 4 | ||||||||
| 32 | Cálculos de presión efectiva al freno | 4 | ||||||||
| 33 | Análisis por ordenador de fatiga por vibraciones | 4 | ||||||||
| 34 | Cálculos de capacidad de baterías | 4 | ||||||||
| 35 | Ensayos y pruebas de aceptación | 4 | Antes de ensayos funcionales | |||||||
| 36 | Ensayos funcionales de aceptación | 4 | Aceptación Edificio -15 | |||||||
| 37 | Procedimiento de ensayos funcionales de aceptación | 4 | ||||||||
| 38 | Certificado del sistema antivibracional | 4 | ||||||||
| 39 | Certificado del sistema de combustible | 4 | ||||||||
| 40 | Cualificación del técnico de puesta en marcha | 4 | ||||||||
| 41 | Cualificación del formador | 4 | ||||||||
| 42 | Pruebas del motor | 4 | Antes de embarque | |||||||
| 43 | Pruebas rutinarias del grupo electrógeno | 4 | Antes de embarque | |||||||
| 44 | Pruebas de diseño del grupo electrógeno | 4 | ||||||||
| 45 | Grupo electrógeno | 4 | ||||||||
| 46 | Equipos y sistemas auxiliares | 4 | ||||||||
| 47 | Manuales preliminares de operación y mantenimiento | 4 | ||||||||
| 48 | Instrucciones de funcionamiento expuestas | 4 | ||||||||
| 49 | Plan de formación | 4 | ||||||||
| SECCIÓN 26 36 00.00 10 | ||||||||||
| 50 | Planos de detalle | 4 | ||||||||
| 51 | Equipo | 4 | 4 | 4 | ||||||
| 52 | Instalación | 4 | ||||||||
| 53 | Materiales | 4 | 4 | |||||||
| 54 | Ensayos | 4 | Aceptación Edificio -7 | |||||||
| 55 | Equipo de conmutación | 4 | ||||||||
| 56 | Equipo de conmutación | 4 | ||||||||
| 57 | Instrucciones | 4 | ||||||||
| SECCIÓN 33 71 02.00 20 | ||||||||||
| 58 | Conductos | 4 | ||||||||
| 59 | Cables de baja tensión enterrados | 4 | ||||||||
| 60 | Cinta de aviso e identificación | 4 | ||||||||
| 61 | Conductores de tierra | 4 | ||||||||
| 62 | Arquetas para lecturas de tierra | 4 | ||||||||
| 63 | Barras equipotenciales | 4 | ||||||||
| 64 | Picas de tierra | 4 | ||||||||
| 65 | Soldadura exotérmica | 4 | 4 | |||||||
| 66 | Ensayos y pruebas en obra | 4 | Aceptación Edificio -5 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N
File details come from the government source that posted it. Updated .