Attachment_6_-_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
Replace Base Generators Federal contract opportunity
Solicitation number
FA5575-14-R-0005
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Attachment 6

View the file

Other files for this federal contract opportunity

Other files attached to Replace Base Generators, newest first.
File Type Posted
Attachment_2_-_Spanish_Specifications.pdf PDF
FA5575-14-R-0005 _Base_Generators.pdf PDF
Attachment_7_-_Cost_Breakdown.xlsx XLSX spreadsheet
Attachment_5_-_PPI_Questionnaire.doc DOC document
Attachment_1_-_English_Specifications.pdf PDF
Attachment_4_-_PPI_reference_list.doc DOC document
Attachment_3_-_Project_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 10-1042PROJECT TITLE
RPL BASE GENERATORSSOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction ScheduleNTP+5
2Work PlanNTP+5
SECTION 01 11 01
3Progress Schedule4NTP+5
4Mobility Plan4NTP+5
5Quality Control Plan4NTP+5
6Waste & construction debris management4Final Inspection
7As-Built drawings4FI+15
8Spatial Data4FI+15
9Key Personnel4NTP+5
10Personel listing4NTP+10
11Safety Program4NTP+5
12Warranty letter4FI+30
SECTION 26 20 00
13Conduit and fittings, 1 x type4
14Junction and pull boxes4
15Wires and cables4
16Circuit breakers4
17LED Pilot Lights4
18Labels4
19Devices subject to manual operation4Facility Acceptance -5
201000-Volt wiring test4Facility Acceptance -5
21Single line diagram of the "as-built"4
22Schematic diagram4
23Active electrical equipment4
SECTION 26 32 13.00 20
24Engine-generator set and auxiliary equipment4
25Auxiliary systems4
26Engine generator set data4
27Engine generator set efficiencies4
28Diesel engine data4
29Generator and exciter data4
30Auxiliary systems and equipment4
31Capacity calculations for engine-generator set4
32Calculations for brake mean effective pressure4
33Torsional vibration stress analysis computations4
34Capacity calculations for batteries4
35Acceptance checks and tests4Before Functional Tests
36Functional acceptance tests4Facility Acceptance -15
37Functional acceptance tests procedure4
38Vibration isolation system certification4
39Fuel system certification4
40Start-up technician qualification resume4
41Instructor's qualification resume4
42Engine tests4Before shipment
43Generator set routine tests4Before shipment
44Generator set design tests4
45Diesel engine-generator set4
46Auxiliary systems and equipment4
47Preliminary assembled O&M manuals4
48Posted operating instructions4
49Training plan4
SECTION 26 36 00.00 10
50Detail drawings4
51Equipment444
52Installation4
53Material44
54Testing4Facility Acceptance -7
55Switching equipment4
56Switching equipment4
57Instructions4
SECTION 33 71 02.00 20
58Conduits4
59Underground low voltage cables4
60Buried warning and identification tape4
61Ground wires4
62Grounding test/Bar wells4
63Grounding Bars4
64Ground rods4
65Exothermic welding44
66Field acceptance checks and tests4Facility Acceptance -5

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 10-1042TÍTULO DE PROYECTO:
REEMPLAZAR GRUPOS ELECTRÓGENOSSOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Programa de obraNTP+5
2Plan de obraNTP+5
SECCIÓN 01 11 01
3Programa de avance de obras4NTP+5
4Plan de movilización4NTP+5
5Plan de control de calidad4NTP+5
6Gestión de residuos y escombros4Inspección final
7Planos As-Builts4IF+15
8Datos espaciales4IF+15
9Personal clave4NTP+5
10Listado de personal4NTP+10
11Plan de seguridad4NTP+5
12Carta de garantía4IF+30
SECCIÓN 26 20 00
13Tubos y accesorios, 1 x tipo4
14Cajas de conexión y paso4
15Conductores y cables4
16Interruptores magnetotérmicos4
17Luces piloto LED4
18Etiquetas4
19Dispositivos sujetos a operación manual4Aceptación Edificio -5
20Pruebas de cableado de 1000 voltios4Aceptación Edificio -5
21Esquema unifialr del sistema eléctrico del edificio4
22Diagrama esquemático del sistema de control eléctrico4
23Equipo eléctrico activo4
SECCIÓN 26 32 13.00 20
24Grupo electrógeno y equipo auxiliar4
25Sistemas auxiliares4
26Datos de grupo electrógeno4
27Eficiencias de grupo electrógeno4
28Motor diesel4
29Grupo electrógeno y excitatriz4
30Equipos y sistemas auxiliares4
31Cálculos de capacidad del grupo electrógeno4
32Cálculos de presión efectiva al freno4
33Análisis por ordenador de fatiga por vibraciones4
34Cálculos de capacidad de baterías4
35Ensayos y pruebas de aceptación4Antes de ensayos funcionales
36Ensayos funcionales de aceptación4Aceptación Edificio -15
37Procedimiento de ensayos funcionales de aceptación4
38Certificado del sistema antivibracional4
39Certificado del sistema de combustible4
40Cualificación del técnico de puesta en marcha4
41Cualificación del formador4
42Pruebas del motor4Antes de embarque
43Pruebas rutinarias del grupo electrógeno4Antes de embarque
44Pruebas de diseño del grupo electrógeno4
45Grupo electrógeno4
46Equipos y sistemas auxiliares4
47Manuales preliminares de operación y mantenimiento4
48Instrucciones de funcionamiento expuestas4
49Plan de formación4
SECCIÓN 26 36 00.00 10
50Planos de detalle4
51Equipo444
52Instalación4
53Materiales44
54Ensayos4Aceptación Edificio -7
55Equipo de conmutación4
56Equipo de conmutación4
57Instrucciones4
SECCIÓN 33 71 02.00 20
58Conductos4
59Cables de baja tensión enterrados4
60Cinta de aviso e identificación4
61Conductores de tierra4
62Arquetas para lecturas de tierra4
63Barras equipotenciales4
64Picas de tierra4
65Soldadura exotérmica44
66Ensayos y pruebas en obra4Aceptación Edificio -5

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N