14-1015_Schedule_of_Material_Submittals.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
Replace 3 A/C Units Multi Facilities Federal contract opportunity
Solicitation number
FA5575-14-B-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Submittal Schedule Attachment 4

View the file

Other files for this federal contract opportunity

Other files attached to Replace 3 A/C Units Multi Facilities, newest first.
File Type Posted
14-1015_Specs_Spanish.pdf PDF
FA5575-15-B-0003.pdf PDF
14-1015_Drawings.pdf PDF
14-1015_Specs_English.pdf PDF
14-1015_AF_3052_KTR.xlsx XLSX spreadsheet
Attachment_6_-_PPI_reference_list.doc DOC document
FA5575-15-B-0003 _Synopsis.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 14-1015PROJECT TITLE
RPL 3 A/C UNITS MULTI FACILITIESSOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 01 11 00
1Construction ScheduleNTP+5
2Work PlanNTP+5
SECTION 01 11 01
3Progress Schedule4NTP+5
4Mobility Plan4NTP+5
5Quality Control Plan4NTP+5
6Waste & construction debris management4Final Inspection
7As-Built drawings4FI+15
8Spatial Data4FI+15
9Key Personnel4NTP+5
10Personel listing4NTP+5
11Safety Program4NTP+5
12Warranty letter4FI+30
SECTION 02 41 10
13Manager of waste from demolition and construction4
14Manager of Hazardous waste from demolition and construction4
15Authorized dump or treatment and recovery plant4
16Delivery and disposal/destruction certicate of waste4
SECTION 02 65 01
17Company4
18Cleaning of pipe and tanks4
19Acceptance4
20Control and follow-up of hazardous waste4
21Management of hazardous waste4
SECTION 02 82 14
22Respiratory protection equipment4
23Glovebag4
24EPIs4
25Landfill4
26Risk Prevention training4
27Laboratory4
28Registration of Asbestos Risk4
29Industrial Hygiene Report4
30Asbestos Hazard Abatement Plan4
SECTION 22 00 00
31PE100 Polyethyelene piping and connection fittings4
32Galvanized steel pipe DIN 24404
33Hose bibb and hose connection vacuum breaker4
34Ball valve4
SECTION 23 07 00
35Refrigerant piping insulation4
36Duct insulation4
SECTION 23 30 13
37Sheet metal rectangulat ducts (METU)4
38Circular flexible ductwork4
39Linear supply diffusers4
40Rotational supply diffusers4
41Return grilles4
42Ventilation grilles4
43Fresh air intakes4
44Manual regulation dampers4
45Volume control damper for fresh air intake4
46Rotational diffuser airfoil profile louver4
47Supply diffusers and return grilles4
48Testing and balancing of air conditioning systems4Installation completion
49O&M Manuals4FI-15
SECTION 23 35 19
50Split heat pump equipment for ducts (building 311)4
51Split heat pump equipment for ducts (building 316)44
52Compact rooftop heat pump unit (building 512A)44
53Multisplit heat pump system (building 512A)44
54Test reports4Installation completion
55O&M Manuals4FI-15
SECTION 26 20 00
56Conduits and fittings (1 of each type)4
57Outlet boxes and covers4
58Circuit breakers and auxiliary trip coils4
59Wires and cables4
60Junction and pull boxes4
61Emergency HVAC shutoff pushbuttons44
62Labels4
63Damper actuators and transformers4
64Safety Switches4
65Panelboards444
66Devices subject to manual operation4Installation completion
670.6/1 kV insulation test4Installation completion
68Schematic diagram of electrical control system4FI-15
69Active electrical equipment4FI-15
SECTION 28 31 74.00 20
70Duct smoke detector4
71FACP zone expander4
72Wiring and conduits4
73System floor plans4
74System wiring diagrams4
75Field acceptance checks and tests4Installation completion
76Qualification of installer4
77O&M Manuals4FI-15

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
14-1015TÍTULO DE PROYECTO:
REEMPLAZAR 3 UNIDADES A/C DE VARIOS EDIFICIOSSOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 01 11 00
1Plan de construcciónNTP+5
2Plan de obraNTP+5
SECCIÓN 01 11 01
3Programa de avance de obras4NTP+5
4Plan de movilización4NTP+5
5Plan de control de calidad4NTP+5
6Gestión de residuos y escombros4Inspección final
7Planos As-Builts4IF+15
8Datos espaciales4IF+15
9Personal clave4IF+15
10Listado de personal4NTP+5
11Plan de seguridad4NTP+5
12Carta de garantía4IF+30
SECCIÓN 02 41 10
13Gestor de residuos4
14Gestor de residuos peligrosos4
15Vertedero autorizado o planta de tratamiento y valorización de residuos4
16Depósito/destrucción de residuos4
SECCIÓN 02 65 01
17Empresa4
18Limpieza de tanques y tuberías4
19Aceptación de residuos4
20Control y seguimiento de los residuos aceptados4
21Manejo adecuado de los residuos4
SECCIÓN 02 82 14
22Equipo de protección respiratoria4
23Bolsas de guantes4
24EPIs4
25Vertedero4
26Formación en riesgos que conllevan los trabajos con amianto4
27Laboratorio4
28Registro como empresa con Riesgo de Amianto4
29Informe higiene industrial4
30Plan de trabajo con tiesgo por amianto4
SECCIÓN 22 00 00
31Tubos de polietileno PE100 y accesorios de conexión44
32Tubería de acero galvanizado DIN 244044
33Grifo para manguera y rompedor de vacío4
34Válvulas de bola4
SECCIÓN 23 07 00
35Aislamiento de tubería de refrigerante4
36Aislamiento de conductos4
SECCIÓN 23 30 13
37Conductos rectangulares chapa metálica (METU)4
38Conductos circulares flexibles4
39Difusores de impulsión lineales4
40Difusores de impulsión rotacionales4
41Rejillas de retorno4
42Rejillas de ventilación4
43g. Rejillas de toma de aire exterior4
44Compuertas de regulación manual4
45Compuertas de regulación para toma de aire exterior4
46Lama con perfil aerodinámico de difusor de impulsión4
47Difusores de impulsión y rejillas de retorno4
48Pruebas y equilibrado del sistema completo de A/A4Al término instalación
49Manuales de mantenimiento4IF-15
SECCIÓN 23 35 19
50Bomba de calor partida para conductos (edificio 311)4
51Bomba de calor partida para conductos (edificio 316)44
52Unidad compacta rooftop bomba de calor (edificio 512A)44
53Sistema multisplit bomba de calor (edificio 512A)44
54Informes de Pruebas44Al término instalación
55Manuales de mantenimiento4IF-15
SECCIÓN 26 20 00
56Tubos y accesorios (1 x cada tipo)4
57Cajas para mecanismos y tapas4
58Interruptores magnetotérmicos y bobinas de disparo4
59Conductores y cables4
60Cajas de conexión y paso4
61Pulsadores de paro de emergencia de climatización44
62Etiquetas4
63Servomotores de compuertas y transformadores4
64Desconectadores fusibles4
65Cuadros444
66Dispositivos sujetos a operación manual4Al término instalación
67Ensayos de aislamiento cableado 0.6/1 kV4Al término instalación
68Diagrama esquemático4IF-15
69Equipo eléctrico activo4IF-15
SECCIÓN 28 31 74.00 20
70Detector de humo de conducto4
71Módulo de expansión de panel de alarma4
72Cableado y conductos4
73Planos de planta del sistema4
74Diagramas de cableado del sistema4
75Informes de pruebas4Al término instalación
76Cualificaciones del instalador4
77Manuales de mantenimiento4IF-15

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N

File details come from the government source that posted it. Updated .