About this file
Submittal Schedule Attachment 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 14-1015_Specs_Spanish.pdf | ||
| FA5575-15-B-0003.pdf | ||
| 14-1015_Drawings.pdf | ||
| 14-1015_Specs_English.pdf | ||
| 14-1015_AF_3052_KTR.xlsx | XLSX spreadsheet | |
| Attachment_6_-_PPI_reference_list.doc | DOC document | |
| FA5575-15-B-0003 _Synopsis.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 14-1015 | PROJECT TITLE | |||
| RPL 3 A/C UNITS MULTI FACILITIES | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| SECTION 01 11 00 | |||||||||||||||||||||||
| 1 | Construction Schedule | NTP+5 | |||||||||||||||||||||
| 2 | Work Plan | NTP+5 | |||||||||||||||||||||
| SECTION 01 11 01 | |||||||||||||||||||||||
| 3 | Progress Schedule | 4 | NTP+5 | ||||||||||||||||||||
| 4 | Mobility Plan | 4 | NTP+5 | ||||||||||||||||||||
| 5 | Quality Control Plan | 4 | NTP+5 | ||||||||||||||||||||
| 6 | Waste & construction debris management | 4 | Final Inspection | ||||||||||||||||||||
| 7 | As-Built drawings | 4 | FI+15 | ||||||||||||||||||||
| 8 | Spatial Data | 4 | FI+15 | ||||||||||||||||||||
| 9 | Key Personnel | 4 | NTP+5 | ||||||||||||||||||||
| 10 | Personel listing | 4 | NTP+5 | ||||||||||||||||||||
| 11 | Safety Program | 4 | NTP+5 | ||||||||||||||||||||
| 12 | Warranty letter | 4 | FI+30 | ||||||||||||||||||||
| SECTION 02 41 10 | |||||||||||||||||||||||
| 13 | Manager of waste from demolition and construction | 4 | |||||||||||||||||||||
| 14 | Manager of Hazardous waste from demolition and construction | 4 | |||||||||||||||||||||
| 15 | Authorized dump or treatment and recovery plant | 4 | |||||||||||||||||||||
| 16 | Delivery and disposal/destruction certicate of waste | 4 | |||||||||||||||||||||
| SECTION 02 65 01 | |||||||||||||||||||||||
| 17 | Company | 4 | |||||||||||||||||||||
| 18 | Cleaning of pipe and tanks | 4 | |||||||||||||||||||||
| 19 | Acceptance | 4 | |||||||||||||||||||||
| 20 | Control and follow-up of hazardous waste | 4 | |||||||||||||||||||||
| 21 | Management of hazardous waste | 4 | |||||||||||||||||||||
| SECTION 02 82 14 | |||||||||||||||||||||||
| 22 | Respiratory protection equipment | 4 | |||||||||||||||||||||
| 23 | Glovebag | 4 | |||||||||||||||||||||
| 24 | EPIs | 4 | |||||||||||||||||||||
| 25 | Landfill | 4 | |||||||||||||||||||||
| 26 | Risk Prevention training | 4 | |||||||||||||||||||||
| 27 | Laboratory | 4 | |||||||||||||||||||||
| 28 | Registration of Asbestos Risk | 4 | |||||||||||||||||||||
| 29 | Industrial Hygiene Report | 4 | |||||||||||||||||||||
| 30 | Asbestos Hazard Abatement Plan | 4 | |||||||||||||||||||||
| SECTION 22 00 00 | |||||||||||||||||||||||
| 31 | PE100 Polyethyelene piping and connection fittings | 4 | |||||||||||||||||||||
| 32 | Galvanized steel pipe DIN 2440 | 4 | |||||||||||||||||||||
| 33 | Hose bibb and hose connection vacuum breaker | 4 | |||||||||||||||||||||
| 34 | Ball valve | 4 | |||||||||||||||||||||
| SECTION 23 07 00 | |||||||||||||||||||||||
| 35 | Refrigerant piping insulation | 4 | |||||||||||||||||||||
| 36 | Duct insulation | 4 | |||||||||||||||||||||
| SECTION 23 30 13 | |||||||||||||||||||||||
| 37 | Sheet metal rectangulat ducts (METU) | 4 | |||||||||||||||||||||
| 38 | Circular flexible ductwork | 4 | |||||||||||||||||||||
| 39 | Linear supply diffusers | 4 | |||||||||||||||||||||
| 40 | Rotational supply diffusers | 4 | |||||||||||||||||||||
| 41 | Return grilles | 4 | |||||||||||||||||||||
| 42 | Ventilation grilles | 4 | |||||||||||||||||||||
| 43 | Fresh air intakes | 4 | |||||||||||||||||||||
| 44 | Manual regulation dampers | 4 | |||||||||||||||||||||
| 45 | Volume control damper for fresh air intake | 4 | |||||||||||||||||||||
| 46 | Rotational diffuser airfoil profile louver | 4 | |||||||||||||||||||||
| 47 | Supply diffusers and return grilles | 4 | |||||||||||||||||||||
| 48 | Testing and balancing of air conditioning systems | 4 | Installation completion | ||||||||||||||||||||
| 49 | O&M Manuals | 4 | FI-15 | ||||||||||||||||||||
| SECTION 23 35 19 | |||||||||||||||||||||||
| 50 | Split heat pump equipment for ducts (building 311) | 4 | |||||||||||||||||||||
| 51 | Split heat pump equipment for ducts (building 316) | 4 | 4 | ||||||||||||||||||||
| 52 | Compact rooftop heat pump unit (building 512A) | 4 | 4 | ||||||||||||||||||||
| 53 | Multisplit heat pump system (building 512A) | 4 | 4 | ||||||||||||||||||||
| 54 | Test reports | 4 | Installation completion | ||||||||||||||||||||
| 55 | O&M Manuals | 4 | FI-15 | ||||||||||||||||||||
| SECTION 26 20 00 | |||||||||||||||||||||||
| 56 | Conduits and fittings (1 of each type) | 4 | |||||||||||||||||||||
| 57 | Outlet boxes and covers | 4 | |||||||||||||||||||||
| 58 | Circuit breakers and auxiliary trip coils | 4 | |||||||||||||||||||||
| 59 | Wires and cables | 4 | |||||||||||||||||||||
| 60 | Junction and pull boxes | 4 | |||||||||||||||||||||
| 61 | Emergency HVAC shutoff pushbuttons | 4 | 4 | ||||||||||||||||||||
| 62 | Labels | 4 | |||||||||||||||||||||
| 63 | Damper actuators and transformers | 4 | |||||||||||||||||||||
| 64 | Safety Switches | 4 | |||||||||||||||||||||
| 65 | Panelboards | 4 | 4 | 4 | |||||||||||||||||||
| 66 | Devices subject to manual operation | 4 | Installation completion | ||||||||||||||||||||
| 67 | 0.6/1 kV insulation test | 4 | Installation completion | ||||||||||||||||||||
| 68 | Schematic diagram of electrical control system | 4 | FI-15 | ||||||||||||||||||||
| 69 | Active electrical equipment | 4 | FI-15 | ||||||||||||||||||||
| SECTION 28 31 74.00 20 | |||||||||||||||||||||||
| 70 | Duct smoke detector | 4 | |||||||||||||||||||||
| 71 | FACP zone expander | 4 | |||||||||||||||||||||
| 72 | Wiring and conduits | 4 | |||||||||||||||||||||
| 73 | System floor plans | 4 | |||||||||||||||||||||
| 74 | System wiring diagrams | 4 | |||||||||||||||||||||
| 75 | Field acceptance checks and tests | 4 | Installation completion | ||||||||||||||||||||
| 76 | Qualification of installer | 4 | |||||||||||||||||||||
| 77 | O&M Manuals | 4 | FI-15 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| 14-1015 | TÍTULO DE PROYECTO: | |||
| REEMPLAZAR 3 UNIDADES A/C DE VARIOS EDIFICIOS | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |
| APROBADO | DESAPROBADO | ||||||||||||||||||||||
| SECCIÓN 01 11 00 | |||||||||||||||||||||||
| 1 | Plan de construcción | NTP+5 | |||||||||||||||||||||
| 2 | Plan de obra | NTP+5 | |||||||||||||||||||||
| SECCIÓN 01 11 01 | |||||||||||||||||||||||
| 3 | Programa de avance de obras | 4 | NTP+5 | ||||||||||||||||||||
| 4 | Plan de movilización | 4 | NTP+5 | ||||||||||||||||||||
| 5 | Plan de control de calidad | 4 | NTP+5 | ||||||||||||||||||||
| 6 | Gestión de residuos y escombros | 4 | Inspección final | ||||||||||||||||||||
| 7 | Planos As-Builts | 4 | IF+15 | ||||||||||||||||||||
| 8 | Datos espaciales | 4 | IF+15 | ||||||||||||||||||||
| 9 | Personal clave | 4 | IF+15 | ||||||||||||||||||||
| 10 | Listado de personal | 4 | NTP+5 | ||||||||||||||||||||
| 11 | Plan de seguridad | 4 | NTP+5 | ||||||||||||||||||||
| 12 | Carta de garantía | 4 | IF+30 | ||||||||||||||||||||
| SECCIÓN 02 41 10 | |||||||||||||||||||||||
| 13 | Gestor de residuos | 4 | |||||||||||||||||||||
| 14 | Gestor de residuos peligrosos | 4 | |||||||||||||||||||||
| 15 | Vertedero autorizado o planta de tratamiento y valorización de residuos | 4 | |||||||||||||||||||||
| 16 | Depósito/destrucción de residuos | 4 | |||||||||||||||||||||
| SECCIÓN 02 65 01 | |||||||||||||||||||||||
| 17 | Empresa | 4 | |||||||||||||||||||||
| 18 | Limpieza de tanques y tuberías | 4 | |||||||||||||||||||||
| 19 | Aceptación de residuos | 4 | |||||||||||||||||||||
| 20 | Control y seguimiento de los residuos aceptados | 4 | |||||||||||||||||||||
| 21 | Manejo adecuado de los residuos | 4 | |||||||||||||||||||||
| SECCIÓN 02 82 14 | |||||||||||||||||||||||
| 22 | Equipo de protección respiratoria | 4 | |||||||||||||||||||||
| 23 | Bolsas de guantes | 4 | |||||||||||||||||||||
| 24 | EPIs | 4 | |||||||||||||||||||||
| 25 | Vertedero | 4 | |||||||||||||||||||||
| 26 | Formación en riesgos que conllevan los trabajos con amianto | 4 | |||||||||||||||||||||
| 27 | Laboratorio | 4 | |||||||||||||||||||||
| 28 | Registro como empresa con Riesgo de Amianto | 4 | |||||||||||||||||||||
| 29 | Informe higiene industrial | 4 | |||||||||||||||||||||
| 30 | Plan de trabajo con tiesgo por amianto | 4 | |||||||||||||||||||||
| SECCIÓN 22 00 00 | |||||||||||||||||||||||
| 31 | Tubos de polietileno PE100 y accesorios de conexión | 4 | 4 | ||||||||||||||||||||
| 32 | Tubería de acero galvanizado DIN 2440 | 4 | 4 | ||||||||||||||||||||
| 33 | Grifo para manguera y rompedor de vacío | 4 | |||||||||||||||||||||
| 34 | Válvulas de bola | 4 | |||||||||||||||||||||
| SECCIÓN 23 07 00 | |||||||||||||||||||||||
| 35 | Aislamiento de tubería de refrigerante | 4 | |||||||||||||||||||||
| 36 | Aislamiento de conductos | 4 | |||||||||||||||||||||
| SECCIÓN 23 30 13 | |||||||||||||||||||||||
| 37 | Conductos rectangulares chapa metálica (METU) | 4 | |||||||||||||||||||||
| 38 | Conductos circulares flexibles | 4 | |||||||||||||||||||||
| 39 | Difusores de impulsión lineales | 4 | |||||||||||||||||||||
| 40 | Difusores de impulsión rotacionales | 4 | |||||||||||||||||||||
| 41 | Rejillas de retorno | 4 | |||||||||||||||||||||
| 42 | Rejillas de ventilación | 4 | |||||||||||||||||||||
| 43 | g. Rejillas de toma de aire exterior | 4 | |||||||||||||||||||||
| 44 | Compuertas de regulación manual | 4 | |||||||||||||||||||||
| 45 | Compuertas de regulación para toma de aire exterior | 4 | |||||||||||||||||||||
| 46 | Lama con perfil aerodinámico de difusor de impulsión | 4 | |||||||||||||||||||||
| 47 | Difusores de impulsión y rejillas de retorno | 4 | |||||||||||||||||||||
| 48 | Pruebas y equilibrado del sistema completo de A/A | 4 | Al término instalación | ||||||||||||||||||||
| 49 | Manuales de mantenimiento | 4 | IF-15 | ||||||||||||||||||||
| SECCIÓN 23 35 19 | |||||||||||||||||||||||
| 50 | Bomba de calor partida para conductos (edificio 311) | 4 | |||||||||||||||||||||
| 51 | Bomba de calor partida para conductos (edificio 316) | 4 | 4 | ||||||||||||||||||||
| 52 | Unidad compacta rooftop bomba de calor (edificio 512A) | 4 | 4 | ||||||||||||||||||||
| 53 | Sistema multisplit bomba de calor (edificio 512A) | 4 | 4 | ||||||||||||||||||||
| 54 | Informes de Pruebas | 4 | 4 | Al término instalación | |||||||||||||||||||
| 55 | Manuales de mantenimiento | 4 | IF-15 | ||||||||||||||||||||
| SECCIÓN 26 20 00 | |||||||||||||||||||||||
| 56 | Tubos y accesorios (1 x cada tipo) | 4 | |||||||||||||||||||||
| 57 | Cajas para mecanismos y tapas | 4 | |||||||||||||||||||||
| 58 | Interruptores magnetotérmicos y bobinas de disparo | 4 | |||||||||||||||||||||
| 59 | Conductores y cables | 4 | |||||||||||||||||||||
| 60 | Cajas de conexión y paso | 4 | |||||||||||||||||||||
| 61 | Pulsadores de paro de emergencia de climatización | 4 | 4 | ||||||||||||||||||||
| 62 | Etiquetas | 4 | |||||||||||||||||||||
| 63 | Servomotores de compuertas y transformadores | 4 | |||||||||||||||||||||
| 64 | Desconectadores fusibles | 4 | |||||||||||||||||||||
| 65 | Cuadros | 4 | 4 | 4 | |||||||||||||||||||
| 66 | Dispositivos sujetos a operación manual | 4 | Al término instalación | ||||||||||||||||||||
| 67 | Ensayos de aislamiento cableado 0.6/1 kV | 4 | Al término instalación | ||||||||||||||||||||
| 68 | Diagrama esquemático | 4 | IF-15 | ||||||||||||||||||||
| 69 | Equipo eléctrico activo | 4 | IF-15 | ||||||||||||||||||||
| SECCIÓN 28 31 74.00 20 | |||||||||||||||||||||||
| 70 | Detector de humo de conducto | 4 | |||||||||||||||||||||
| 71 | Módulo de expansión de panel de alarma | 4 | |||||||||||||||||||||
| 72 | Cableado y conductos | 4 | |||||||||||||||||||||
| 73 | Planos de planta del sistema | 4 | |||||||||||||||||||||
| 74 | Diagramas de cableado del sistema | 4 | |||||||||||||||||||||
| 75 | Informes de pruebas | 4 | Al término instalación | ||||||||||||||||||||
| 76 | Cualificaciones del instalador | 4 | |||||||||||||||||||||
| 77 | Manuales de mantenimiento | 4 | IF-15 |
&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N
File details come from the government source that posted it. Updated .