14-1015_AF_3052_KTR.xlsx

XLSX spreadsheet 51 KB Posted

Attached to
Replace 3 A/C Units Multi Facilities Federal contract opportunity
Solicitation number
FA5575-14-B-0003
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

AF Form 3052 Attachment 5

View the file

Other files for this federal contract opportunity

Other files attached to Replace 3 A/C Units Multi Facilities, newest first.
File Type Posted
Attachment_6_-_PPI_reference_list.doc DOC document
14-1015_Drawings.pdf PDF
14-1015_Schedule_of_Material_Submittals.xlsx XLSX spreadsheet
14-1015_Specs_English.pdf PDF
14-1015_Specs_Spanish.pdf PDF
FA5575-15-B-0003.pdf PDF
FA5575-15-B-0003 _Synopsis.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASIC PACKAGE (KTR)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPL 3 A/C UNITS MULTI FACILITIES (BASIC PACKAGE)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 14-1015MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BUILDING 311 (BOWLING ALLEY)
EDIFICIO 311 (BOLERA)
1Sampling of suspected asbestos containing materials
Muestras de materiales sospechosos de contener amiantoEa
2Sampling of suspected contaminated soil
Muestras de terreno sospechoso de estar contaminadoJOB
3Removal of above ground fuel tank and accessories
Desmontaje tanque de combustible en superficie y accesoriosEa
4Removal of existing HVAC system and accessories
Desmontaje de sistema existente HVAC y accesoriosEa
5Removal of existing water pipe and accessories
Desmontaje de tubería de agua existente y accesoriosLm
6Reinforced concrete slab
Bancada de hormigón armadom3
7Ducted split heat pump equipment and accessories
Equipo partido bomba de calor para conductos y accesoriosEa
8Rectangular galvanized steel duct
Conducto de chapa rectangularm2
9Linear supply diffusers SD-1
Difusores de impulsión lineales SD-1Ea
10Linear supply diffusers SD-2
Difusores de impulsión lineales SD-2Ea
11Relocate linear supply diffuser SD-2
Recolocar difusor de impulsión lineal SD-2Ea
12Manual regulation dampers
Compuertas de regulación manualesEA
13Return grilles RR-1
Rejillas de retorno RR-1Ea
14Return grilles RR-2
Rejillas de retorno RR-2Ea
15Volume motorized control damper for fresh air and accessories
Compuerta motorizada de aire exterior y accesoriosEa
16Fresh air intake grille and accessories
Rejilla de toma de aire exterior y accesoriosEA
17Tests, setup and regulation
Pruebas, puesta en marcha y regulaciónJOB
18Polyethylene Pipe PE100 DN32 and connection accessories
Tubería polietileno PE100 DN32 y accesorios de conexiónLm
19Galvanized steel pipe 3/4" and connection accessories
Tubería acero galvanizado 3/4" y accesorios de conexiónLm
20Hose bibb and hose connection vacuum breaker 3/4"
Grifo y rompedor de vacío para conexión de manguera 3/4"EA
21Valves and accessories
Valvuleria y accesoriosJOB
22Demolition of existing electrical installation
Demolición de la instalación eléctrica existenteJOB
23New 63A, 3 Phase, Curve C 10kA Circuit Breaker
Nuevo magnetotérmico 63A, 3 Fases, Curva C 10 kAEa
24New 16A, 3 Phase, Curve C 10kA Circuit Breaker
Nuevo magnetotérmico 16A, 3 Fases, Curva C 10 kAEa
25New 1A, Phase + Neutral, Curve C 10kA Circuit Breaker
Nuevo magnetotérmico 1A, Fase + Neutro, Curva C 10 kAEa
261 1/2" RMC including couplings & accessories
Conducto acero galv. 1 1/2", incluso manguitos y accesoriosLm
271" RMC including couplings & accessories
Conducto acero galv. 1", incluso manguitos y accesoriosLm
283/4" RMC including couplings & accessories
Conducto rígido acero galv. 3/4", incluso manguitos y accesoriosLm
29PG21 Flexible Metal Conduit including couplings & accesories
Cond. Flexible Metálico PG21 incluso prensaestopas y acc.Lm
30Copper cable 1x2.5 mm2 RZ1K(AS) 1000V
Cable de cobre 1x2.5 mm2 RZ1K(AS) 1000VLm
31Copper cable 1x4 mm2 RZ1K(AS) 1000V
Cable de cobre 1x4 mm2 RZ1K(AS) 1000VLm
32Copper cable 1x16 mm2 RZ1K(AS) 1000V
Cable de cobre 1x16 mm2RZ1K(AS) 1000VLm
33Pull Boxes
Cajas de PasoEa
34Emergency HVAC Shutoff Pushbutton
Paro de Emergencia de ClimatizaciónEa
35Safety Switches
Seccionadores FusiblesEa
36FACP Zone Expander
Módulo Expansión Panel Alarma Contra-incendiosEa
37Duct Smoke Detector, wiring, conduit & accessories
Detector de humo de conducto, cableado, conducto y acc.Ea
38Repair elements affected by the project execution
Reparar elementos afectados por la ejecución del proyectoJOB
TOTAL BUILDING 311 (BOWLING ALLEY)
TOTAL EDIFICIO 311 (BOLERA)
BUILDING 316 (RACQUET BALL COURT)
EDIFICIO 316 (PISTA DE RACQUET BALL)
39Removal of existing HVAC system and accessories
Desmontaje de sistema existente HVAC y accesoriosEa
40Ducted split heat pump equipment and accessories
Equipo partido bomba de calor para conductos y accesoriosEa
41Rectangular galvanized steel duct (insulated)
Conducto de chapa rectangular (aislado)m2
42Rectangular galvanized steel duct
Conducto de chapa rectangularm2
43Volume motorized control damper for fresh air and accessories
Compuerta motorizada de aire exterior y accesoriosEa
44Fresh air intake grille and accessories
Rejilla de toma de aire exterior y accesoriosEA
45Tests, setup and regulation
Pruebas, puesta en marcha y regulaciónJOB
46Demolition of existing electrical installation
Demolición de la instalación eléctrica existenteJOB
47New 40A, 2 Phase, Curve C 10kA Circuit Breaker
Nuevo magnetotérmico 40A, 2 Fases, Curva C 10 kAEa
48New 16A, 2 Phase, Curve C 10kA Circuit Breaker
Nuevo magnetotérmico 16A, 2 Fases, Curva C 10 kAEa
49New 1A, Phase + Neutral, Curve C 10kA Circuit Breaker
Nuevo magnetotérmico 1A, Fase + Neutro, Curva C 10 kAEa
501 1/2" RMC including couplings & accessories
Conducto acero galv. 1 1/2", incluso manguitos y accesoriosLm
511" RMC including couplings & accessories
Conducto acero galv. 1", incluso manguitos y accesoriosLm
523/4" RMC including couplings & accessories
Conducto rígido acero galv. 3/4", incluso manguitos y accesoriosLm
53PG21 Flexible Metal Conduit including couplings & accesories
Cond. Flexible Metálico PG21 incluso prensaestopas y acc.Lm
54Copper cable 1x2.5 mm2 RZ1K(AS) 1000V
Cable de cobre 1x2.5 mm2 RZ1K(AS) 1000VLm
55Copper cable 1x4 mm2 RZ1K(AS) 1000V
Cable de cobre 1x4 mm2 RZ1K(AS) 1000VLm
56Copper cable 1x10 mm2 RZ1K(AS) 1000V
Cable de cobre 1x10 mm2RZ1K(AS) 1000VLm
57Pull Boxes
Cajas de PasoEa
58Emergency HVAC Shutoff Pushbutton
Paro de Emergencia de ClimatizaciónEa
59Safety Switches
Seccionadores FusiblesEa
60Repair elements affected by the project execution
Reparar elementos afectados por la ejecución del proyectoJOB
TOTAL BLDG 316 (RACQUET BALL COURT)
TOTAL EDIF 316 (PISTA DE RACQUET BALL)
BUILDING 512A (TMO)
EDIFICIO 512A (TMO)
61Removal of existing HVAC system and accessories
Desmontaje de sistema existente HVAC y accesoriosEa
62Reinforced concrete slabs
Bancadas de hormigón armadom3
63Compact heat pump equipment and accessories
Equipo compacto bomba de calor y accesoriosEa
64Multi split heat pump system and accessories
Sistema multi split bomba de calor y accesoriosEa
65Insulate existing galvanized steel return duct
Aislar conducto de retorno de chapa existentem2
66Rectangular galvanized steel duct (with insulation and jacket)
Conducto de chapa rectangular (aislado y encamisado)m2
67Flexible insulated duct
Conducto flexible aisladoLm
68Rotational supply diffusers SD-1
Difusores de impulsión rotacionales SD-1Ea
69Volume motorized control damper for fresh air and accessories
Compuerta motorizada de aire exterior y accesoriosEa
70Fresh air intake grille and accessories
Rejilla de toma de aire exterior y accesoriosEA
71Tests, setup and regulation
Pruebas, puesta en marcha y regulaciónJOB
72Ventilation grilles VG-1 + Air intakes
Rejillas de ventilación VG-1 + Tomas de aireEa
73Demolition of existing electrical installation
Demolición de la instalación eléctrica existenteJOB
74New 125A, 3 Phase + Neutral, Curve C 85kA Circuit Breaker
Nuevo magnetotérmico 125A, 3 F + Neutro, Curva C 85 kAEa
74New 63A, 3 Phase + Neutral, Curve C 25kA Circuit Breaker
Nuevo magnetotérmico 63A, 3 F + Neutro, Curva C 25 kAEa
75New 1A, Phase + Neutral, Curve C 10kA Circuit Breaker
Nuevo magnetotérmico 1A, Fase + Neutro, Curva C 10 kAEa
761 1/2" RMC including couplings & accessories
Conducto acero galv. 1 1/2", incluso manguitos y accesoriosLm
773/4" RMC including couplings & accessories
Conducto rígido acero galv. 3/4", incluso manguitos y accesoriosLm
78PG21 Flexible Metal Conduit including couplings & accesories
Cond. Flexible Metálico PG21 incluso prensaestopas y acc.Lm
79Copper cable 1x2.5 mm2 RZ1K(AS) 1000V
Cable de cobre 1x2.5 mm2 RZ1K(AS) 1000VLm
80Copper cable 1x4 mm2 RZ1K(AS) 1000V
Cable de cobre 1x4 mm2 RZ1K(AS) 1000VLm
81Copper cable 1x10 mm2 RZ1K(AS) 1000V
Cable de cobre 1x10 mm2RZ1K(AS) 1000VLm
82Copper cable 1x16 mm2 RZ1K(AS) 1000V
Cable de cobre 1x16 mm2RZ1K(AS) 1000VLm
83Pull Boxes
Cajas de PasoEa
84Emergency HVAC Shutoff Pushbutton
Paro de Emergencia de ClimatizaciónEa
85New ACP Panelboard
Nuevo Panel ACPEa
86Repair elements affected by the project execution
Reparar elementos afectados por la ejecución del proyectoJOB
TOTAL BUILDING 512A (TMO)
TOTAL EDIFICIO 512A (TMO)
SUMMARY (BASIC PACKAGE)
RESUMEN (PAQUETE BÁSICO)
TOTAL BUILDING 311 (BOWLING ALLEY)
TOTAL EDIFICIO 311 (BOLERA)
TOTAL BLDG 316 (RACQUET BALL COURT)
TOTAL EDIF 316 (PISTA DE RACQUET BALL)
TOTAL BUILDING 512A (TMO)
TOTAL EDIFICIO 512A (TMO)
TOTAL (BASIC PACKAGE)
TOTAL (PAQUETE BÁSICO)
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL BASIC PACKAGE EUROS

DATE: FIRM NAME:

TITLE: BY:

TITLE: BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N

OPTION 1 (KTR)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPL 3 A/C UNITS MULTI FACILITIES (OPTION 1)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 14-1015MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BUILDING 311 (BOWLING ALLEY)-OPTION 1
EDIFICIO 311 (BOLERA)-OPCIÓN 1
Option 1: Contaminated Soil
Opción 1: Terreno contaminado
1Excavación de terreno contaminado
Excavation of contaminated soilm3
2Backfilling, compacting and reseeding.
Relleno, compactación y resiembram3
3Transportation and handling of Hazardous Waste
Gestión y transporte de residuos tóxicos peligrososm3
Total Option 1: Contaminated Soil
Total Opción 1: Terreno contaminado
TOTAL OPTION 1
TOTAL OPCIÓN 1
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL OPTION 1 EUROS

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N

OPTION 2 (KTR)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPL 3 A/C UNITS MULTI FACILITIES (OPTION 2)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 14-1015MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
BUILDING 311 (BOWLING ALLEY)-OPTION 2
EDIFICIO 311 (BOLERA)-OPCIÓN 2
1Demolition of asbestos containing materials
Demolición de materiales que contienen amiantoJOB
Total Demolition of asbestos containing materials
Total Demolición de materiales que contienen amianto
TOTAL OPTION 2
TOTAL OPCIÓN 2
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL TOTAL OPTION 2 EUROS

DATE: FIRM NAME:

TITLE: BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N

SUMMARY (KTR)

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPL 3 A/C UNITS MULTI FACILITIES (SUMMARY)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 14-1015MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SUMMARY
RESUMEN
TOTAL (BASIC PACKAGE)
TOTAL (PAQUETE BÁSICO)
TOTAL OPTION 1
TOTAL OPCIÓN 1
TOTAL OPTION 2
TOTAL OPCIÓN 2
GRAND TOTAL
GRAN TOTAL
`
TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT EUROS

DATE: FIRM NAME:

TITLE: BY:

TITLE: BY:

&"Times New Roman,Regular"AF Form 3052 (Computer Generated) &"Times New Roman,Regular"Page &P of &N

File details come from the government source that posted it. Updated .