Schedule of Material Submittals.xls

XLS spreadsheet 77 KB Posted

Attached to
Paint Airfield Markings Federal contract opportunity
Solicitation number
FA5575-09-R-0016
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Schedule of Material Submittals

View the file

Other files for this federal contract opportunity

Other files attached to Paint Airfield Markings, newest first.
File Type Posted
Attachment 4 - PPI Questionnaire.doc DOC document
Attachment 3 - PPI reference list.doc DOC document
08-1034 Specs En.pdf PDF
AF 3052 Contractor.xls XLS spreadsheet
08-1034 Specs Sp.pdf PDF
R-597-26.zip ZIP file
FORMATO A0.zip ZIP file
FA5575-09-R-0016 Solicitation Document.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittal Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION / CONTRACT NO.
QUUG 08-1034PAINT AIRFIELD MARKINGS
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 01011
1Safety Plan4Award+14
2Mobility Plan4Commencing-5
3Waste & construction debris management4Final Inspection
4As-Builts drawings4FI+30
5Warranty letter4FI+30
SECTION 02683
6Material removal44Award+15
7Schedule of work4Award+15
8Material removal equipment44Award+15
SECTION 02684
9Paint44Award+45
10Glass spheres444Award+45

&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:TÍTULO DE PROYECTO:SOLICITACIÓN / CONTRATO NO.
QUUG 08-1034PINTAR SEÑALIZACION DE AERÓDROMO
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 01011
1Plan de seguridad4ADJUD+14
2Plan de movilización4Comienzo+5
3Gestión de residuos y escombros4Inspección final
4Planos As-Built4IF+30
5Carta de garantía4IF+30
SECCIÓN 02683
6Eliminación de material44Comienzo+15
7Programa de trabajo4Comienzo+15
8Equipo de eliminación de material44Comienzo+15
SECCIÓN 02684
9Pintura44Comienzo+45
10Reflectorizador444Comienzo+45

&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

Enter any comments pertaining to the submittal