Schedule of Material Submittals.xls
XLS spreadsheet 77 KB Posted
- Attached to
- Paint Airfield Markings Federal contract opportunity
- Solicitation number
- FA5575-09-R-0016
About this file
Schedule of Material Submittals
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - PPI Questionnaire.doc | DOC document | |
| Attachment 3 - PPI reference list.doc | DOC document | |
| 08-1034 Specs En.pdf | ||
| AF 3052 Contractor.xls | XLS spreadsheet | |
| 08-1034 Specs Sp.pdf | ||
| R-597-26.zip | ZIP file | |
| FORMATO A0.zip | ZIP file | |
| FA5575-09-R-0016 Solicitation Document.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittal Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION / CONTRACT NO. | ||||||||||||||||||||
| QUUG 08-1034 | PAINT AIRFIELD MARKINGS | ||||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| SECTION 01011 | |||||||||||||||||||||||
| 1 | Safety Plan | 4 | Award+14 | ||||||||||||||||||||
| 2 | Mobility Plan | 4 | Commencing-5 | ||||||||||||||||||||
| 3 | Waste & construction debris management | 4 | Final Inspection | ||||||||||||||||||||
| 4 | As-Builts drawings | 4 | FI+30 | ||||||||||||||||||||
| 5 | Warranty letter | 4 | FI+30 | ||||||||||||||||||||
| SECTION 02683 | |||||||||||||||||||||||
| 6 | Material removal | 4 | 4 | Award+15 | |||||||||||||||||||
| 7 | Schedule of work | 4 | Award+15 | ||||||||||||||||||||
| 8 | Material removal equipment | 4 | 4 | Award+15 | |||||||||||||||||||
| SECTION 02684 | |||||||||||||||||||||||
| 9 | Paint | 4 | 4 | Award+45 | |||||||||||||||||||
| 10 | Glass spheres | 4 | 4 | 4 | Award+45 |
&L&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP)&RPage &P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | TÍTULO DE PROYECTO: | SOLICITACIÓN / CONTRATO NO. | ||||||||||||||||||||
| QUUG 08-1034 | PINTAR SEÑALIZACION DE AERÓDROMO | ||||||||||||||||||||||
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |
| APROBADO | DESAPROBADO | ||||||||||||||||||||||
| SECCIÓN 01011 | |||||||||||||||||||||||
| 1 | Plan de seguridad | 4 | ADJUD+14 | ||||||||||||||||||||
| 2 | Plan de movilización | 4 | Comienzo+5 | ||||||||||||||||||||
| 3 | Gestión de residuos y escombros | 4 | Inspección final | ||||||||||||||||||||
| 4 | Planos As-Built | 4 | IF+30 | ||||||||||||||||||||
| 5 | Carta de garantía | 4 | IF+30 | ||||||||||||||||||||
| SECCIÓN 02683 | |||||||||||||||||||||||
| 6 | Eliminación de material | 4 | 4 | Comienzo+15 | |||||||||||||||||||
| 7 | Programa de trabajo | 4 | Comienzo+15 | ||||||||||||||||||||
| 8 | Equipo de eliminación de material | 4 | 4 | Comienzo+15 | |||||||||||||||||||
| SECCIÓN 02684 | |||||||||||||||||||||||
| 9 | Pintura | 4 | 4 | Comienzo+45 | |||||||||||||||||||
| 10 | Reflectorizador | 4 | 4 | 4 | Comienzo+45 |
&L&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP)&RPágina &P de &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal
File details come from the government source that posted it. Updated .