Attachment_4_Blank_AF_Form_3052.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Repair NDI Laboratory Federal contract opportunity
Solicitation number
FA5270-15-T-0030
Issued by
Department of the Air Force Pacific Air Forces

About this file

Attachment 4 Blank 3052

View the file

Other files for this federal contract opportunity

Other files attached to Repair NDI Laboratory, newest first.
File Type Posted
Amendment_0001.pdf PDF
FA5270-15-T-0030.doc DOC document
Attachment_5_-_Recent _Relevant_Experience_Template.pdf PDF
Combined_Synopsis.docx DOCX document
Attachment_1-3.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Final

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWNExpires 31 October 1989
CONTRACTORADDRESS
CONTRACT FOR(Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR NDI LABORATORY, B769
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
LXEZ11-1554Kadena Air Base, Okinawa, Japan
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYMANHOURSAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALMANDAYSRATETOTALCOSTSTOTAL
(1)(2)(3)(4) ¥(5) ¥(6)(7) ¥(8) ¥(9) ¥(10) ¥
SUMMARY
AARCHITECTURAL
BMECHANICAL
CELECTRICAL
DSAMPLING OF ACM/LBP
EABATEMENT OF ACM/LBP
TOTAL DIRECT COST
OVERHEAD
SUBTOTAL
PROFIT
TOTAL COST

$1.00 = ¥ 103.9439

AARCHITECTURAL
1REMOVAL WORK
a. Wood doors and frames
b. Roll-up door and accessories
c. Lead-lined door and frames
d. Urinal screen
e. Sliding door locking device
f. Ceiling at toilets
g. Mobilization
h. Disposal

SUB-TOTAL

2NEW WORK
a. Wood doors, frames and HW
b. Electrically operated insulated roll-up door
c. Lead-lined door, frames and HW
d. Urinal screen
e. Sliding door locking device
f. MR GWB ceiling w/ paint finish
g. Repair/refinish works
h. Miscellaneous
SUB-TOTAL
ARCHITECTURAL TOTAL COST
CMECHANICAL
1REMOVAL WORKS
a. Exhaust fan
b. Exhaust grilles
c. Ductwork
d. Piping
e. Disposal
SUB-TOTAL
2NEW WORKS
a. Exhaust fan
b. Exhaust grilles
c. Ductwork
d. Electric Hot Water Heater
e. Piping with fittings
f. Water temperature control valve
g. Ball valve
h. Check valve
i. Pipe insulation
j. Concrete pad
k. Miscellaneous work
SUB-TOTAL
MECHANICAL TOTAL COST
DELECTRICAL
1REMOVAL WORKS

SUB-TOTAL

2NEW WORKS
aCONTROL PANEL
bNOTIFICATION SYSTEM
c1P-20AT-100AF BREAKER
d3P-20AT-100AF BREAKER
e3P-60AT-100AF BREAKER
f#12 AWG WIRING
g#8 AWG WIRING
h1/2" RSC
i1" RSC
j2P-30A DISC SW SST
k3P-60A DISC
lMOTOR STARTER
mBOILER STARTER
nMISC
SUB-TOTAL
ELECTRICAL TOTAL COST
DACM/LBP SAMPLING/TESTING
1ACM Sampling/Testing
2LBP Sampling/Testing

ACM/LBP SAMPLING/TESTING TOTAL COST

EACM/LBP ABATEMENT
1ACM/LBP
2Disposal
3Worker Protection
4Site Protection
5Ventilation System w/ Hepa Filter
6D-Con

ACM/LBP ABATEMENT TOTAL COST

26 November 14