Preproposal RFIs -PAVING v4.pdf
PDF 146 KB Posted
- Attached to
- Overlay/Construct Roads and Airfield Pavements Federal contract opportunity
- Solicitation number
- FA5270-10-R-0023
About this file
The Government's response to request for information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Preproposal RFIs -PAVING v3.pdf | ||
| FA5270-10-R-0023 Amendment 1 FBO.pdf | ||
| Preproposal RFIs -PAVING v2.pdf | ||
| CLINS_Exhibits A-E | — | |
| Preproposal RFIs - PAVING.pdf | ||
| FA5270-10-R-0023 - FBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL REQUESTS FOR INFORMATION
18th Contracting Squadron (Bldg 250, Kadena AB) Conference Room
FA5270-10-R-0023
OVERLAY/CONSTRUCT ROADS AND AIRFIELD PAVEMENTS, KADENA AB, OKINAWA, JAPAN
1. Is PPQ for the base year portion of the IDIQ project acceptable?
The Government will evaluate the totality of PPQs submitted on the offeror’s behalf to assess the quality and extent of offeror’s performance deemed relevant to the requirements of this RFP. The government will use information submitted by the offeror and other sources such as other Federal Government offices and commercial sources, to assess performance. PPQs are used to assess the offeror’s ability to satisfactorily execute this contract in its totality, not just the base year.
2. Regarding PPQ in the past performance information, as you may know, in most of the cases, Japan government and local government or other public related owners, they issue an official rating report after the completion of a project. And then the rating report can be used as a past performance record for other projects when bided. Since the rating report is official, normally they do not issue any other rating to anybody. So usually they cannot issue a PPQ for anybody for this project. Would you accept the official rating report with POC as replacement of the PPQ?
Yes, the Government will accept other past performance information so long as it is not submitted by the offeror. For clarification, see Question No. 9.
3. We have the same Exhibit A-E on page 55 to 100 and page 101 and 146 of the RFP. Both are just double folded?
Yes, it is double printed. Please acknowledge only one copy. Additionally, Section B, Technical Exhibits A-E are now uploaded to FBO via MS Excel (.xls) for ease of use.
4. From page 531 of RFP document, there is another statement of work for "Replace Concrete Sidewalk And Curb & Gutter". Is this also a part of this project? Should we make pricing on page 539 and submit with the Section B and Exhibit A-E?
Project LXEZ 10-2665-3 is the Government’s “seed” project, and serves as a potential project under this Paving IDIQ. Offerors should make pricing offers consistent with CLINs on page 539.
This project is not evaluated as part of the source selection process, but completion of pricing is required as part of the offeror’s proposal. Price proposal for this “seed” project (LXEZ 10- 2665-3) has no merit on the evaluation of the offeror’s IDIQ proposal (FA5270-10-R-0023).
5. Regarding Specifications of Attachment 1 Technical Provisions: It is found that there are some characteristic publications , Associations and requirements of United States of America itself , such as AASHTO ,AI ,ASTM ,CDT , DOA ・・・, requirements of NRMCA , Quality Control Personnel ACI certified , Accreditation of the commercial laboratory and so on in Specifications, which are unfamiliar to Japanese Contractors and some of them are impracticable . If we should strictly comply with all of this Specification , period until due date would be too short for the offerors to submit the Proposal and Price in the Proposal would become huge because of the uncertainty . Therefore , to avoid such kind uncertainly soared pricing and hold reasonable price , we would like to request you to allow the Contractor to apply Japanese publications , standards and so on as US standards equivalent.
Equivalent Japanese certifications, accreditations, publications, standards are acceptable, however, it is the contractor’s responsibility to demonstrate they are bonafide equivalents.
6. Seed Project: Seed project is attached as Attachment 4, Does offeror insert proposed unit prices and extended prices in proposal CLINs , and submit original and three(3)copies as one (1) of PART I submittal ?
The CLINs in the original solicitation were inaccurately listed. Please see Amendment 001 posted to wwww.fedbizops.gov for updated CLINs.
7. Performance Period of 72days for Seed Project, Accumulation of Material procurement period of 30 days, Construction Period of 45days and unfavorable Weather of 2 days is 77days . Please advise us the reason of the difference between 72days and 77days.
The performance period will be 77 days.
8. ”13. Grooving” in Airfield of E. The principal features of work of 1.01 Statement of Work has preceding activity “Grinding “. However , in Section 32 01 26 .71 Grooving for Airfield Pavements there is no specified description of Grinding as preceding activity . Please provide us detailed specification for “Grinding for Grooving “.
The Government is continuing appropriate research into this question and will answer shortly.
9. #2 of Preproposal RFIs issued on 18 Aug, 2010, the answer say, "the Government will accept other past performance documentation so long as it it not submitted by the offeror." The rating report that Government issue is official and it is stamped by Prefectural governor. Do you not accept it if it's submitted by offeror? We do not believe that the local Government will submit it directly to your attention.
THIS IS A CLARIFICATION TO PREVIOUSLY ANSWERED RFI No. 2 and A CHANGE
TO THE DISCUSSION HELD AT THE PRE-PROPOSAL CONFERENCE ON 25 AUG 10:
The US Government will accept and evaluate any past performance information officially issued by the Government of Japan for which the offeror submits on the Government of Japan’s behalf.
For PPQs, offerors are allowed to assist customers/clients in filling out the bottom of page 2 and the top of page 3 of the PPQ, but no other portion of the PPQ may be completed by the offeror.
PPQs may not be submitted by the offeror.
10. How much bonding capacity is required for Letter of Intent? Shall it cover amount of base period (first one year), total amount of entire contract period (5 years), seed project amount or authorized amount?
The Letter of Intent to Bond amount submitted will be the same amount as the offeror’s price proposal. This means the base year price proposal only.
11. Regarding Specifications of Project Table of Contents, 32 01 17.16 Sealing of Cracks in Bituminous Pavements is listed, but no description is attached.
Section inadvertently omitted. Attached.
12. Regarding Section 32 01 13 Fog coats, there is no Japanese publications. We would like to request you to allow the Japanese Contractor apply Japanese standards and materials.
The USAF will accept Equivalent Japanese construction standards, however, it is the contractor's responsibility to provide authoritative documentation demonstrating the submitted standards are indeed equivalent.
13. Regarding Section 32 12 15, Hot-Mix Asphalt for Airfields and 32 12 16 Hot-Mix Asphalt for Roads, 3.10.3.7 In-Place Density says, “a nuclear gauge or other non-destructive testing device may be used to monitor pavement density.” Instead of non-destructive testing, is Core sampling density test acceptable?
The use of a nuclear gauge or other non-destructive testing devices is the contractor's quality control and intended to be used as a monitoring aid. Actual density shall be determined by core testing as described in the specifications.
14. Regarding section 32 13 13.03 Air Fields and Heavy-Duty Concrete Pavement Less Than 10000
Cubic Yard, Section 1.8.3 Paver-Finisher, Is man-power paving allowed for the restricted paving area? Do you have any criterion of man-power paving?
No. Man-power paving is not allowed.
15. Regarding Section 32 12 15, Hot-Mix Asphalt for Airfields and 32 12 16 Hot-Mix Asphalt for Roads 2.2. Asphalt Cement Binder 2nd paragraph says “If Performance Grade of asphalt cement is not available, penetration grade 40-60 asphalt cement binder may be used in conformance with JIS K 2207.” Instead of penetration grade 40-60, is penetration grade 60-80 acceptable?
No
16. Regarding the drawing 6 of 43, Dowel Bar diameter are described as 1 inch, which is converted to 25.4mm. However, Japanese unit of length for manufacturer is mm, diameter of just 25mm are available in Japan. Could the diameter of 25mm be applied as equivalent?
Yes
17. Regarding Pricing Schedule, item No. 0001AW Removal Existing Pavement markings; do these markings to be removed contain lead? If the markings contain lead, would you provide the specification how to deal with lead?
No markings contain lead. Any lead abatement would be performed by another contractor.
18. Regarding Section32 17 24.00 10 PAVEMENT MARKINGS, Page 8, 3.2.1 Paint says “The Contractor shall provide guide lines and template as necessary to control paint application. --------
- Edges of markings shall be sharply outlined.” Does this mean that the Contractor is required to tape up all edges of the markings to make the outlines sharp?
No. Not if the contractor is able to provide a sharp outline without taping
19. Regarding of FA5270-10-R-0023 Overlay/Construct Roads and Airfield Pavement, we are wondering if you are going to extend proposal due date since you haven't issue answers to offeror's question yet.
The Government has made every effort to answer contractor Requests for Information (RFI) during the soliciation period. The Government will continue to do so up until the time proposals are due, 13 SEP 10 at 1500. The Government has no plans to extend the proposal due date.
20. Regarding Item No 0001BP Non-Skid protection Coating of the BASE PAVEMENT in Pricing Schedule, is there any specification for Non-Skid Protection Coating?
This item is the Non-Skid protection pavement coating normally used on Japanese roads at crosswalks, curves, hills, etc. Submittal for approval required.
21. Regarding DWG 40 of 43, T-20 GRATING, there is no T-20 Grating on JIS A 5305. T-20 grating is special order product. If T-20 is required, could you specify the design?
Typical Industry Standard.
22. Regarding DWG 30 of 43, NEW CONCRETE CURB seems to be cast in place concrete curb.
However, Pricing Schedule Item No. 0001BZ Construct New Precast Concrete Curb means precast literally. Could you specify whether cast-in-place or precast?
Pricing Schedule Item No. 0001BZ is Precast.
23. Item No. 0001CE (remove existing guardrail) & 0001CG (install new guardrail system), the units are in EA. In the list of drawing provided (page 36 of 43) the length per span is 4.0 meters. Is the unit EA on the pricing schedule for these items the same as per span which is 4.0 meters in the drawing? Please verify.
Item No. 0001CE (Remove Existing Guardrail) and 0001CG (Install New Guardrail System), the units are EA. Each typical unit consists of two 4m spans and three support posts as shown on "Guardrail Details", DWG 36 of 43.
24. Is the T‐20 grating indicated on the drawing page 40 of 43 will be paid under pricing schedule
0001CN?
Yes.
25. The amount of Pavement Markings (Item No.0001AV to 4001AV) and Removal of Existing Pavement Markings (Item No.0001AW to 4001AW), it looks too much of all the Airfield / Road markings and removal for each year. Is the amount true?
Yes.
26. The item of Remove Existing Trees, H=2’H to 5’H (Item No.0001CY), is indicated unit “SY”.
However, next option year 2 to 4 are indicated unit “EA”. Which is true?
Unit for tree removal should be EA.
27. Do you have drawings of "raised reflective pavement markers"? If you do, we would like to see it for reference.
No.
28. Please clarify the specification of "Non-skid protection coating".
See No. 20. Above.
| 2010-09-10T11:22:58+0900 | |
| PHELPS.MATTHEW.AARON.1119172256 |