Attachment 1 - Salient Characteristics (Updated 25AUG23).pdf

PDF 134 KB Posted

Attached to
736 SFS Expandable Shelter System (Guam) Federal contract opportunity
Solicitation number
FA524023QM018
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document outlines the salient characteristics for an expandable shelter system solicitation issued by the Department of the Air Force Pacific Air Forces. The solicitation seeks a deployable, hardened facility for contingency response missions that utilizes a 463L rail system to fit within a single pallet position on aircraft when stowed. When deployed, the shelter must expand to dimensions of 10 feet by 20 feet by 8 feet tall. Additional requirements include being forklift transportable, having a setup time of 20 minutes or less without tools, including climate control, electrical power, communications capabilities, and other life support functions. The shelter must be delivered within 180 days to a location in the Pacific region.

Key requirements include expandable walls, self-supporting floors, electrical and data ports, LED lighting, air ventilation, floor tie-downs, and a power cable. The solicitation number is FA524023QM018 and responses are due within 180 days of award.

View the file

Other files for this federal contract opportunity

Other files attached to 736 SFS Expandable Shelter System (Guam), newest first.
File Type Posted
Attachment 3 - Response to RFIs.pdf PDF
FA524023QM018-0001 Combined Synopsis-Solicitation.pdf PDF
FA524023QM018- Combined Synopsis-Solicitation.pdf PDF
Attachment 2 - Clauses and Provisions.pdf PDF
Attachment 1 - Salient Characteristics.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 – Salient Characteristics

736 SFS EXPANDABLE SHELTER SYSTEM

FA524023QM018

Attachment 1 –Salient Characteristics

Updated 25 August 2023

The 36 Contingency Response Group requires a deployable, hardened facility for missions in various austere environments for security during operations to support command and control.

The contractor will provide 1 each ISO container-based expandable shelter designed to maximize space efficiency and provide ultimate flexibility in transport, deployment, and configuration. The shelter will meet or exceed the following Salient Characteristics:

1. Must u�lize 463L rail system that most C130s and C17s u�lize and must take up 1 pallet posi�on space on the Aircra� when stowed.

2. When stowed the ISU will be 10’ L x 8’ W x 8 H’ (normal dimensions for most ISUs)

3. When deployed and expanded the item should expand to 10 L x 20 W x 8 H.

4. Must interface with the 463L rail system and be aircra� cer�fied load compliant for C-130, C-17 and

C-5.

5. Must be four-way forkli� able and be transferable by 10K Forkli�.

6. Must have expandable walls and setup and breakdown by two personnel in 20 minutes with no jack or winches required.

7. Must have self-suppor�ng expandable floors that do not require ground support.

8. Have a built-in climate control unit with remote (i.e heater/air condi�oner)

9. Must be CSC cer�fied (can be stacked together)

10. Must Include a mechanical room accessible via cargo doors.

11. Must include (1ea) weather �ght front entry door with cipher lock.

12. Include (1ea) weather �ght sidewall entry door for emergency exit.

13. Must have the ability to be leveled on mul�ple surfaces and have required tools included.

14. Must Include fold out steps for roof access with grab handle.

15. Must have electrical outlets to Include 120/208 3-phase 60A and electrical panel service with grounding rod.

16. Must include (1ea) CO/Smoke detector and emergency ligh�ng with fire ex�nguisher.

17. Must include center ceiling mounted LED lights w/black out.

18. Include at minimum (8 ea) Surface mounted wing wall raceway 5� sec�ons with 3 duplex outlets, 1

GFCI outlet, keyhole mounted.

19. Include at minimum (8 ea) Wall mounted, Ethernet raceway with 2 ea CAT6 jacks per raceway.

20. Must Include passive air vents on rear wing walls and front wall exhaust fan for emergency airflow.

21. Include at minimum (2 ea) Data pass through port.

22. Include at minimum (10 ea) Stainless steel floor d-ring �e down.

23. Include at minimum (1 ea) Power Cable, 60A 50� with Amphenol connectors.

Delivery Required By: 180 Days ARO

Delivery Address: UNIT 14065 BLDG 61230

APO AP 96543-4065

File details come from the government source that posted it. Updated .