Attachment 2 Solicitation No. FA520919U0046
PERFORMANCE WORK STATEMENT (PWS)
FOR
CABLE PLANT UPGRADE ZONE 6 BROWN, YOKOTA AB, JAPAN
1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary to install outside plant (OSP) single mode (SM) fiber optic cable at Yokota Air Force Base, Japan. The contractor shall perform replacement services in accordance with (IAW) this PWS, manufacturer standards, commercial practice and local standards. All parts and materials must be compliant with the Trade Agreement Act (TAA).
2. Objective. The contractor shall install, fusion splice, terminate and test ribbon OSP Single Mode (SM) fiber optic cable. Utilize drawings for cable routes, and splice locations. Utilize PWS for splicing method, fiber counts, fiber testing methods, labeling and termination methods. All distances are approximates. The contractor will also re-terminate existing fiber optic cables from SC to LC in ITN 1246 and 556 to reduce termination foot print.
3. SCOPE. This Performance Work Statement (PWS) defines the requirements for the Contractor to install, splice, terminate and test 576 strands of SM fiber optic ribbon type cable (FOC) from Information Transfer Node (ITN) Bldg. 1246 to the ITN Bldg. 556, Create 3 splice points. Install 24 or strands of SM ribbon type FOC from each facility to designated splice points. Splice facilities ribbon 1 (strands 1-12) to ITN 556 and ribbon 2 (strands 13-24) to ITN 1246. All other strands will be spliced straight through ribbon 1 to 1, 2 to 2 etc. The contractor will also reduce existing fiber termination foot print in ITN 1246 and 556 as described in this PWS.
4. REQUIREMENTS.
4.1. Installation.
4.1.1. ITN 1246 to ITN 556. Install 576 strand SM ribbon type fiber optic cable (Fiber cable must be American standard color code), from ITN 1246 to ITN 556 utilize routes provided. If alternate route is available at no additional expense get approval from 374 CS/SCXP PM before proceeding. If utilizing an empty duct install one (3”) Maxcell with fiber cable for future use.
| START POINT |
| ROUTE |
| DISTANCE |
| END POINT |
| ITN 1246 TERMINATION 1 |
| MH 6-18C, 6-18B, 6-18A, 6-18, 6-17, 6-16, 6-15, 6-14, 6-13, 6-12, 6-8-5, 6-8-3F, 6-8-3D, 6-8-3J, 10-3, MH 10-2 |
| 4230 FT |
| MH 10-2 SPLICE 1 |
| MH 10-2 SPLICE 1 |
| MH 10-1, 10, 6-3-1F, 6-3-1F-3 |
| 1470 FT |
| MH 6-3-1F-3 SPLICE 2 |
| MH 6-3-1F-3 SPLICE 2 |
| MH 6-3-1F-3A |
| 280 FT |
| ITN 556 TERMINATION |
4.1.2. Bldg. Fiber Route. Install 24 strand SM ribbon type fiber optic cable from bldg. to splice point.
| BLDG |
| ROUTE |
| DISTANCE |
| SPLICE POINT |
| BLDG 120 TERMINATION |
| MH 6-5-1E, 6-3-3E, 6-3-3F, MH 10-2 |
| 795 FT |
| MH 10-2 SPLICE 1 |
| BLDG 124 TERMINATION |
| MH 6-3-3F, MH 10-2 |
| 270 FT |
| MH 10-2 SPLICE 1 |
| BLDG 125 TERMINATION |
| MH 6-3-3F, MH 10-2 |
| 240 FT |
| MH 10-2 SPLICE 1 |
| BLDG 220 TERMINATION |
| MH 6-3-3, 6-3-3E, 6-3-3F, MH 10-2 |
| 685 FT |
| MH 10-2 SPLICE 1 |
| BLDG 331 TERMINATION |
| HH 331, MH 6-3-4, 6-3-5, 6-3-6, 6-3-1D, 6-8-1F, 6-3-1F-3 |
| 1230 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 330 TERMINATION |
| MH 6-3-5, 6-3-6, 6-3-1D, 6-8-1F, 6-3-1F-3 |
| 885 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 345 TERMINATION |
| HH 6-3-1C-2, MH 6-3-1C, 6-3-1D, 6-8-1F, 6-3-1F-3 |
| 1075 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 421 TERMINATION |
| MH 6-3-6, 6-3-1D, 6-8-1F, 6-3-1F-3 |
| 790 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 455 TERMINATION |
| MH 6-3-1F-2, 6-3-1F, 6-3-1F-3 |
| 330 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 450 TERMINATION |
| MH 6-3-1F-2, 6-3-1F, 6-3-1F-3 |
| 230 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 448 TERMINATION |
| MH 6-3-1F, 6-3-1F-3 |
| 110 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 430 TERMINATION |
| HH 430, MH 6-3-1C, 6-3-1D, 6-8-1F, 6-3-1F-3 |
| 1060 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 430A TERMINATION |
| MH 430, MH 6-3-1C, 6-3-1D, 6-8-1F, 6-3-1F-3 |
| 1130 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 426 TERMINATION |
| HH 426, MH 430, MH 6-3-1C, 6-3-1D, 6-8-1F, 6-3-1F-3 |
| 1470 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 415 TERMINATION |
| HH 426, MH 430, MH 6-3-1C, 6-3-1D, 6-8-1F, 6-3-1F-3 |
| 1460 FT |
| MH 6-3-1F-3 SPLICE 2 |
| BLDG 555 TERMINATION |
| MH 6-3-1F-1, MH 6-3-1F |
| 190 FT |
| MH 6-3-1F-3 SPLICE 2 |
4.2. Splice.
4.2.1. Splice Enclosure specifications. The closure (dome type) should support future growth (over 1000 strands), be re-enterable, utilize a grommet system, and have at a minimum 7 entry ports that can be subdivided utilizing grommets, it must also support cable diameters up to 1 1/4 inch in diameter. The closure shall be sealed and suitable for enclosing a splice organizer in a protective housing. The splice organizer shall consist of splice trays and protective sleeves, and ancillary hardware necessary to house fiber optic splices. The splice tray shall house a minimum of 288 fiber optic fusion splices in a neat and orderly fashion. The splice tray shall provide individual support for each splice. The organizer shall allow for one meter of fiber to be stored without kinks, twists, or micro-bends. The organizer shall be suitable for reentry, for future maintenance or modification, without damage to the fiber or splices. The closure shall be Pre-formed Coyote Dome or equivalent. All splice closures will be identical.
4.2.2. Splice method. All splicing will be fusion type only. The splicing method will be duel home type. Splice facilities ribbon 1 (strands 1-12) to ITN 556 and ribbon 2 (strands 13-24) to ITN 1246.
All available strands will be spliced straight through ribbon 1 to 1, 2 to 2 etc. When installing a cable into splice case utilize a 4 port grommet. If all ports are not utilized in the 4 port grommet fill vacant ports with plug.
4.2.3. Fiber optic splice information.
| BUILDING |
| COUNT BREAK OUT |
| 576 COUNT SPLICED INTO |
| Ribbon |
| BLDG 120 1-24 |
| FO 120 1-12 IS 1-12A |
| 565-576 TO ITN 556 |
| 48 |
| FO 120 13-24 IS 1-12B |
| 565-576 TO ITN 1246 |
| 48 |
| BLDG 124 1-24 |
| FO 124 1-12 IS 1-12A |
| 553-564 TO ITN 556 |
| 47 |
| FO 124 13-24 IS 1-12B |
| 553-564 TO ITN 1246 |
| 47 |
| BLDG 125 1-24 |
| FO 125 1-12 IS 1-12A |
| 541-552 TO ITN 556 |
| 46 |
| FO 125 13-24 IS 1-12B |
| 541-552 TO ITN 1246 |
| 46 |
| BLDG 220 1-24 |
| FO 220 1-12 IS 1-12A |
| 529-540 TO ITN 556 |
| 45 |
| FO 220 13-24 IS 1-12B |
| 529-540 TO ITN 1246 |
| 45 |
| BLDG 331 1-24 |
| FO 331 1-12 IS 1-12A |
| 517-528 TO ITN 556 |
| 44 |
| FO 331 13-24 IS 1-12B |
| 517-528 TO ITN 1246 |
| 44 |
| BLDG 330 1-24 |
| FO 330 1-12 IS 1-12A |
| 505-516 TO ITN 556 |
| 43 |
| FO 330 13-24 IS 1-12B |
| 505-516 TO ITN 1246 |
| 43 |
| BLDG 345 1-24 |
| FO 345 1-12 IS 1-12A |
| 493-504 TO ITN 556 |
| 42 |
| FO 345 13-24 IS 1-12B |
| 493-504 ITN 1246 |
| 42 |
| BLDG 421 1-24 |
| FO 421 1-12 IS 1-12A |
| 481-492 TO ITN 556 |
| 41 |
| FO 421 13-24 IS 1-12B |
| 481-492 TO ITN 1246 |
| 41 |
| BLDG 455 1-24 |
| FO 455 1-24 IS 1-12A |
| 469-480 TO ITN 556 |
| 40 |
| FO 455 13-24 IS 1-12B |
| 469-480 TO ITN 1246 |
| 40 |
| BLDG 450 1-24 |
| FO 450 1-12 IS 1-12A |
| 457-468 TO ITN 556 |
| 39 |
| FO 450 13-24 IS 1-12B |
| 457-468 TO ITN 1246 |
| 39 |
| BLDG 448 1-24 |
| FO 448 1-12 IS 1-12A |
| 445-456 TO ITN 556 |
| 38 |
| FO 448 13-24 IS 1-12B |
| 445-456 TO ITN 1246 |
| 38 |
| BLDG 430 1-24 |
| FO 430 1-12 IS 1-12A |
| 433-444 TO ITN 556 |
| 37 |
| FO 430 13-24 IS 1-12B |
| 433-444 TO ITN 1246 |
| 37 |
| BLDG 430 1-24 |
| FO 430A 1-12 IS 1-12A |
| 421-432 TO ITN 556 |
| 36 |
| FO 430A 13-24 IS 1-12B |
| 421-432 TO ITN 1246 |
| 36 |
| BLDG 426 1-24 |
| FO 426 1-12 IS 1-12A |
| 409-420 TO ITN 556 |
| 35 |
| FO 426 13-24 IS 1-12B |
| 409-420 TO ITN 1246 |
| 35 |
| BLDG 415 1-24 |
| FO 415 1-12 IS 1-12A |
| 397-408 TO ITN 556 |
| 34 |
| FO 415 13-24 IS 1-12B |
| 397-408 TO ITN 1246 |
| 34 |
| BLDG 555 1-24 |
| FO 555 1-12 IS 1-12A |
| 385-396 TO ITN 556 |
| 33 |
| FO 555 13-24 IS 1-12B |
| 385-396 TO ITN 1246 |
| 33 |
4.3. Terminate.
4.3.1. Terminate ITN 556 and 1246. Utilize high density ribbonized pigtail Fiber Optic Distribution Panels (FODP) fusion splice type with LC connectors, or MPO/MPT cartridge type.
4.3.2. Terminate End Buildings. Utilize ribbonized pigtail Fiber Optic Distribution Panels (FODP) fusion splice type with LC connectors, or MPO/MPT cartridge type.
4.3.3. Termination locations. All terminations will be completed inside the facility’s communication rack in the communication room.
4.4. Test.
4.4.1. Fiber optic tests. All fiber strands shall be tested and capable of a 10 Gig Transfer rates with no more than 3 DB Lose. Both Optical Time Domain Reflectometer (OTDR) and Optical Power Meter tests will be used for all end-to-end circuits. Between FODPs, bi-directional testing at 1310 nm and 1550 nm is required. All test results will be sent to 374 CS/SCXP. Test results will be verified at project completion.
4.5. Label.
4.5.1. Label cable in manhole. All cables will be labeled in the manholes. Utilize a permanent label that will not fade due to water and time.
4.5.2. Label cable at FODP. Label the cable at the FODP entrance and on the front of the FODP.
4.5.3. FODP and Cable Labels are as Follows:
| CABLE LABEL 576 |
| CABLE LABEL BLDG 120 |
| CABLE LABEL BLDG 124 |
| FOCA 556A - 1246B |
| FOCA 556A - 1246B - 120 |
| FOCA 556A - 1246B - 124 |
| 1 - 576 A/B SM |
| 565 - 576 A/B SM |
| 553 - 564 A/B SM |
| CABLE LABEL BLDG 125 |
| CABLE LABEL BLDG 220 |
| CABLE LABEL BLDG 331 |
| FOCA 556A - 1246B - 125 |
| FOCA 556A - 1246B - 220 |
| FOCA 556A - 1246B - 331 |
| 541 - 552 A/B SM |
| 529 - 540 A/B SM |
| 517 - 528 A/B SM |
| CABLE LABEL 330 |
| CABLE LABEL BLDG 345 |
| CABLE LABEL BLDG 421 |
| FOCA 556A – 1246B - 330 |
| FOCA 556A - 1246B - 345 |
| FOCA 556A - 1246B - 421 |
| 505 - 516 A/B SM |
| 493 - 504 A/B SM |
| 481 - 492 A/B SM |
| CABLE LABEL BLDG 455 |
| CABLE LABEL BLDG 450 |
| CABLE LABEL BLDG 448 |
| FOCA 556A - 1246B - 455 |
| FOCA 556A - 1246B – 450 |
| FOCA 556A - 1246B – 448 |
| 469 - 480 A/B SM |
| 457 - 468 A/B SM |
| 445 - 456 A/B SM |
| CABLE LABEL 430 |
| CABLE LABEL BLDG 430A |
| CABLE LABEL BLDG 426 |
| FOCA 556A - 1246B - 430 |
| FOCA 556A - 1246B – 430A |
| FOCA 556A - 1246B – 426 |
| 433 - 444 A/B SM |
| 421 - 432 A/B SM |
| 409 - 420 A/B SM |
| CABLE LABEL BLDG 415 |
| CABLE LABEL BLDG 555 |
| FOCA 556A - 1246B - 415 |
| FOCA 556A - 1246B – 555 |
| 397 - 408 A/B SM |
| 385 - 396 A/B SM |
4.6. Drawings.
4.6.1. As built drawings. The contractor will provide as built drawings. The drawings will show only the newly installed fiber optic cables (conduit utilization). Drawings will be sent to 374 CS/SCXP (PDF format).
4.7. Rack Consolidation.
4.7.1. ITN 556. Coordinate with 374 CS for downtime. This work will be completed on the weekend. Cut 18/12 core, 3/24 core, and 3/48 core cable and re-terminate cables utilizing LC type connectors (total 432 strands). Condense the strands to the smallest footprint possible (utilize a high density FODP). Any additional cable slack can be pulled into the manhole for appearance purposes.
4.7.2. ITN 1246. Coordinate with 374 CS for downtime. This work will be completed on the weekend. Cut 21/12 core, and 2/48 core cable and re-terminate cables utilizing LC type connectors (total 348 strands). Condense the strands to the smallest footprint possible (utilize a high density FODP). Any additional cable slack can be pulled into the manhole for appearance purposes.
5. DELIVERABLES.
| Tasks |
| Acceptable Quality Level (AQL) |
| Acceptance/Deliverable |
| 4.1 Cable installation. |
| Cable will be installed in manholes and locked down to steps to prevent cable movement. A minimum 15 foot maintenance loop will be placed at manhole before building entrance to include ITN 556 and 1246. |
| Deliverable 1. Will be reviewed upon project completion. 100 % Inspection. |
| 4.2 Splice |
| All splicing will be completed outside of the manhole. Maintain a minimum 15 foot maintenance loop at splice points. |
| Deliverable 2. Will be reviewed upon project completion. 100 % Inspection. |
| 4.3 Terminate |
| All terminations will be ribbon fusion spliced. Maintain appropriate wire management in back of FODP. |
| Deliverable 3. Will be reviewed upon project completion. 100 % Inspection. |
| 4.4 Test |
| All fibers will be 10 Gig capable at a minimum and with no more than 3 DB loss. |
| Deliverable 4. Provide copies of all test results to 374 CS/SCXP in PDF form. All test results will be reviewed. 374 CS/SCOW will validate the test results during acceptance. |
| 4.5 Label |
| Utilize a permanent non fading label. Label all cables in manholes and termination points. |
| Deliverable 5. Will be reviewed upon project completion. 100 % Inspection. |
| 4.6 Drawings |
| Provide manhole drawings of newly installed cables include duct utilization and splice location. |
| Deliverable 6. Provide as built drawings in PDF form to 374 CS/SCXP and SCOW. Duct utilization will be reviewed at project completion. |
Project completion
Upon completion of Task 6, the Site POC will schedule inspection with 374 CS/SCXP. SCXP will schedule inspection with back shops. An AFTO 747 acceptance will be generated by the plans work center and routed for 374 CS/CC acceptance.
6. PLACE OF PERFORMANCE. A site visit will be conducted at 1:00PM on August 14th 2019 (Building 620) to visit the buildings/zone mentioned in Section 4 of this PWS and the below drawings.
7. PERIOD OF PERFORMANCE. All work shall be completed 12 months after date of award. However the vendor should quote their best estimate in terms of the amount of time to complete the project. The vendor shall be available for a kickoff meeting with the customer no later than two weeks after the award date. As directed by the 374 CS/SCXP 225-9690 (Site POC), the contractor shall continue performance in emergency or mission essential conditions. Additionally, the contractor may be required to account for the whereabouts of their personnel should this information be requested by the Site POC. No on site work will be started until after base passes have been issued excluding surveys.
8. INSTALLATION PLAN. The Contractor shall arrange an installation plan and schedule with the Site POC, and obtain an approval from the Site POC prior to the commencement of the work. POC is as follows: Primary MSgt Hicks, Robert Alt. Mr. Pinkerton 225-9690.
9. ARRANGEMENTS OF THE PERFORMANCE TIME. The contractor will coordinate all after hour work with site 374 CS/SCXP 225-9690 and shall do so at no additional cost to the Government.
10. HOURS OF SERVICE. The contractor’s personnel shall perform scheduled work on weekdays, Monday through Friday (exclusive of the below U.S. legal and other designated holidays), during normal duty hours, 0800 - 1630 hours unless prior arrangements have been made with the Site POCs. Consolidation of ITN rack will be completed on the weekends.
U.S. HOLIDAYS:
| 3rd Monday of January |
| Martin Luther King, Jr’s Birthday | |
| 3rd Monday of February |
| Washington's Birthday | |
| Last Monday of May |
| Memorial Day | |
| 4th July |
| Independence Day | |
| 1st Monday of September |
| Labor Day | |
| 2nd Monday of October |
| Columbus Day | |
| 11th November |
| Veterans Day | |
| 4th Thursday of November |
| Thanksgiving Day | |
| 25th December |
| Christmas Day | |
11. SITE POC. The authorized primary Site POC for this contract is 374 CS/SCXP 225-9690 or 225-4145. The contractor shall coordinate all aspects of this project with the Site POCs. Completed work shall be subject to inspection and acceptance by the Site POCs.
12. GOVERNMENT-FURNISHED EQUIPMENT (GFE)/GOVERNMENT-FURNISHED INFORMATION
(GFI). NONE
13. OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS.
The Contractors shall be responsible for gathering all information needed for the work to be completed. All questions shall be submitted in writing to the Contracting Officer (CO) and Contract Administrator (CA) three days prior to the site visit.
The Contractor shall have confined space certification or training, at least three (3) years of experience in construction, outside plant fiber optic cabling installation and/or maintenance and testing. At minimum, key personnel shall have a professional knowledge of communications engineering concepts, principles and practices and extensive familiarity with other engineering disciplines; knowledge of a broad range of networking standards, methods, practices, techniques, materials and equipment to ensure work is in compliance with regulations and standards.
The Contractor shall be responsible for the transportation of all system equipment to the site locations. Upon request of the Contractor, the Government may provide a temporary storage. In such case, the Contractor shall be responsible for inventory and reconciliation of all shipments, which will be coordinated with and verified by a Government representative. Also the Contractor shall transport all equipment from the temporary storage area to the final destination.
The Contractor shall coordinate the site visit through the Site POC and the CO/CA. The Site POC will provide any applicable forms regarding site visits. The Contractor shall provide all necessary site visit information to the government’s Site POC (374 CS/SCXP) at least 10 days prior to any site visit. The Contractor shall coordinate all deliveries with the Site POC at least 10 days prior to delivery and provide any site visit information required for the delivery. This will ensure visit clearances can be obtained from the local Security/Visitor Control Office. Visits include, but are not limited to, meetings, surveys, testing, etc.
The Contractor shall provide a standard commercial warranty to correct possible defects in materials and workmanship. The warranty shall be provided for two years commencing at the time of final system acceptance and shall include all equipment purchased, including but not limited to, infrastructure equipment.
14. TECHNICAL STANDARDS. The following are technical standards. The Contractor will use the most up to date version.
AFI 91-203 – Air Force Consolidated Occupational Safety Instruction OSHA CFR 29 Part 1910-268 – Telecommunications TIA-606-B - Administration Standard for Telecommunications Infrastructure TIA-568-C.0 - Generic Telecommunications Cabling for Customer Premises TIA-568-C.1 - Commercial Building Telecommunications Cabling Standard TIA-568-C.2 - Balanced Twisted-Pair Telecommunications Cabling and Components Standard TIA-568-C.3 - Optical Fiber Cabling Components Standard TIA 942 - Telecommunications Infrastructure Standard for Data Centers TIA-607-B - Commercial Building Grounding and Bonding Requirements for Telecommunications TIA-526-7- Measurement of Optical Power Loss of Installed Single-mode Fiber Cable Plant TIA-526-14-B Optical Power Loss Measurement of Installed Multimode Fiber Cable Plant TIA-569-B - Commercial Building Standard for Telecommunications Pathways and Spaces TIA-570-B –Residential Telecommunications Infrastructure Standard TIA-598-C - Optical Fiber Cable Color Coding TIA-758-B Customer-owned Outside Plant Telecommunication Infrastructure Standard RUS Bulletin 1735F-401, Standards for Splicing Copper and Fiber Cable RUS Bulletin 1751F-643 - Underground Plant Design RUS Bulletin 1751F-801 – Electrical Protection Fundamentals RUS Bulletin 1753F-151 (515b) - Specifications and Drawings for Underground Cable Installation RUS Bulletin 1753F-201 (PC-4) – RUS Standard for Acceptance Tests and Measurements of Telecommunications Plant RUS Bulletin 1753F-207 (PE-87) – REA Specification for Terminating Cables NFPA 70 - National Electric Code image3.jpeg image4.jpeg image5.jpeg image1.png image2.jpeg