Questions_and_Answers_for_FA5209.docx
DOCX document 12 KB Posted
- Attached to
- Bldg 703 Rewire Federal contract opportunity
- Solicitation number
- FA5209-18-Q-BH05
About this file
Questions and Answers for FA5209-18-Q-BH05
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_2_for_FA5209.docx | DOCX document | |
| site_Visit_Word_Doc.docx | DOCX document | |
| site_Visit_Word_Doc.docx | DOCX document | |
| Attachment_4_Equipment_List.DOCX | DOCX document | |
| Attachment_1_PWS.DOCX | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for FA5209-18-Q-BH05
1: Is it acceptable to utilize the products from different makers other than the ones stated in Attachment 4 if the products are approved to be equal in quality/performance?
A: Yes, approved equal products are acceptable.
2: would it be possible to “comm-out” during the project?
A: No. The process requested is for the contractor to install the new wiring first, at which point the Government will switch the system onto the new wiring. After this, the contractor is able to remove the old wiring. The point of this is to keep communications operational as much as possible.