5.Reference_Plan_(Drawings).pdf
PDF 2 MB Posted
- Attached to
- Replace Generator - ILS, B1301, Yokota Air Base, Japan Federal contract opportunity
- Solicitation number
- FA5209-15-B-0017
About this file
Reference Plan (Drawings)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-BidConferenceMinutes-15B0017.pdf | ||
| 7.Additional_Info-Report Photos.pdf | ||
| 4.SOW.pdf | ||
| 2.PoliciesProceduresforDoingBusinesswiththeUSG.pdf | ||
| 6.Envelope_label_OF-17.pdf | ||
| 3.Solicitation.pdf | ||
| 1.DDForm1707.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DANGER
F‐54
消 火 器
Fuel Truck Grounding
High‐High Level 95%: Return Pump On High Level 90%: Supply P Off, Return P Off
Low Level 75%: Supply Pump On Low‐Low Level 70% : Lamp / Alarm
NATO Sign and
Danger Sign
Gauging Port
POL Piping (Under
Ground/Above Ground)
Water Drainage with Wing /Hand pump
Gauge
Ladder
Overflow Shut Off Valve with High Level Alarm
Double Wall SUPPORT AST
Unti‐Syphone Valve
Grounding Wire LineFire
Extinguisher
Dike for>55Gal
Sump Sump
Fuel Level Control
Fuel Containment
* Number reflects tank requirement on the spread sheet
Leak Detector, high level alarm panel
Calibration Chart
1/16” Tank Calibration
Chart
Fuel Day Tank Containment (Separate type/Generator Unit Inside type)
Spill Containment
Water Drainage
Foot Valve
Fill Port
Day Tank
Fuel Fill Port 2”/Spill
Containment
Supply & Return Line (Mark up fuel flow direction)
Flexible joint
PP
Supply & Return Pumps
* Provide some maintenance valves at corners.
Typical Required Fuel Tank System ‐ Pump Type
(Can be combined with Return Line below)
Return Line
M‐2
* Contractor shall made this PDF data with CAD data. 9/9
| 1301-T1 |
| 1301-E1 |
| 1301-E2 |
| 1301-E3 |
| 1301-E4 |
| 1301-E5 |
| 1301-E6 |
| 1301-M1 |
| 1301-M2 |
File details come from the government source that posted it. Updated .