Mechanical Dock Levelers Questions and Answers.pdf
PDF 95 KB Posted
- Attached to
- Install Mechanical Dock Levelers Federal contract opportunity
- Solicitation number
- FA500023R0018
About this file
This document contains questions and answers regarding mechanical dock levelers for installation. The scope of work includes replacing three dock levelers and exterior dock seals at a facility. The contractor will have full control of the construction area to excavate and pour foundations for the new levelers and seals simultaneously. No electrical or engineering work is required as the dock levelers are mechanical. Existing wall electrical will not need modification. The related federal contract opportunity is from the Department of the Air Force Pacific Air Forces to install mechanical dock levelers, as identified in solicitation number FA500023R0018.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Statement of Work Revised 14 July 2023.pdf | ||
| Solicitation Amendment FA500023R00180001 SF 30.pdf | ||
| Attachment 3 - Open Market General Specifications 10 February 2021.pdf | ||
| Solicitation - FA500023R0018.pdf | ||
| Attachment 1 - Statement of Work 27 March 2023.pdf | ||
| Attachment 2 - Davis-Bacon Act WD AK20230001 19 May 2023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mechanical Dock Levelers Questions & Answers
1. Under Part ll General Requirements – Part 2 makes reference to only replacing the dock levelers.
The site visit revealed that the dock seals on the exterior of the building are also in need of replacement. Please advise if this scope should also be included at this time.
Yes, the seals will require replacement and should be added to scope of work.
2. The area of the new pit levelers (footprint) has it been confirmed there are no underground utilities that can and would be compromised in the cutting and excavating process for preparing the pits to be installed.
There are no underground utilities.
3. Please confirm if the scope of work can all be performed at the same time with the ability to close off the area and excavate and pour all three positions at one time.
Yes, the Contractor will own the whole construction area. Arrangements are being made by SQ to temporarily use other dock locations in the building.
4. Can you provide the electrical requirements?
Dock Levelers are mechanical, no electrical will be required to operate them.
5. Do you know where we are planning to get power from?
Dock Levelers are mechanical, no electrical will be required to operate them.
6. Can you provide as-builts showing the panel locations?
Dock Levelers are mechanical, no electrical will be required to operate them.
7. Is there any requirement for engineering? If not, can you confirm that the proposed panels to feed these have adequate space and compacity for the new loads?
No engineering requirement.
8. Is there any of the existing electrical on the walls that will need to be modified?
There is electrical on the wall, and it will not need to be modified.