Solicitation_Amendment_FA500019QA0820004_SF_30.pdf
PDF 526 KB Posted
- Attached to
- Nike Site Repairs Federal contract opportunity
- Solicitation number
- FA500019QA082
About this file
SF 30
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW_Rev_2_Final.pdf | ||
| Solicitation_Amendment_-_FA500019QA0820004.pdf | ||
| Solicitation_Amendment_-_FA500019QA0820003.pdf | ||
| Solicitation_Amendment_FA500019QA0820003_SF_30.pdf | ||
| SOW_Rev_2_&_Specs_FXSB_3332-1219.pdf | ||
| DWGs_-_REV_2_-_FXSB_3332-1219.pdf | ||
| Q_&_A.pdf | ||
| 9._SOW_Rev_1_&_Specs_FXSB_3332-1219.pdf | ||
| Solicitation_Amendment_FA500019QA0820002_SF_30.pdf | ||
| Solicitation_Amendment_-_FA500019QA0820002.pdf | ||
| Site_Visit.pdf | ||
| Solicitation_Amendment_FA500019QA0820001_SF_30_CO.pdf | ||
| Solicitation_Amendment_-_FA500019QA0820001.pdf | ||
| Attachment_1_SOW_&_Specs_FXSB_3332-1219.pdf | ||
| Attachment_2_DWGs_-_FXSB_3332-1219.pdf | ||
| Attachment_3_AF_66.xls | XLS spreadsheet | |
| Attachment_4_Wage_Determination.pdf | ||
| Solicitation_-_FA500019QA082.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) were modified:
0001 - Two part repair/replace project at both upper and lower Nike Site Summit.
Part 1 consists of the following: Remove razor wire along with removal and replacement of chain link fencing fabric from exclusion area and repair/ replace gate at entrance to exclusion area (manual operation only)
Part 2 consists of the following: Clean, strip as required, repair, and repaint MTR clamshell and support structure.
INFORMATION FROM TO
Description Three part repair/replace project at both upper and lower Nike Site Summit.
Part 1 consists of the following:
Repair concrete and steel hinges that support blast doors, remount blast doors, secure blast doors and vents to deter vandalism, and remove only specified graffiti following procedures outlined at building 39249, Missile Warhead Magazine at Lower Site Summit.
Part 2 consists of the following:
Remove razor wire along with removal and replacement of chain link fencing fabric from exclusion area and repair/ replace gate at entrance to exclusion area (manual operation only)
Part 3 consists of the following:
Clean, strip as required, repair, and repaint MTR clamshell and support structure.
Two part repair/replace project at both upper and lower Nike Site Summit.
Part 1 consists of the following:
Remove razor wire along with removal and replacement of chain link fencing fabric from exclusion area and repair/ replace gate at entrance to exclusion area (manual operation only)
Part 2 consists of the following:
Clean, strip as required, repair, and repaint MTR clamshell and support structure.
Section C - Specification/SOW/SOO/ORD
The Requirements text has been modified to:
FXSB3332-1219 NIKE SITE EXT FENCING REPAIR, EXT PAINT
This acquisition is set aside for Small Businesses in accordance with FAR Part 19.
FA500019QA0820004
In accordance with FAR 36.204(c) Magnitude on Construction Projects, the price range of this project is anticipated to be between $100,000 and $250,000.
Section I - Contract Clauses
Miscellaneous text in this section has been modified to:
Warranty of Construction (Mar 1994)
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of --
(1) The Contractor's failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause.
The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall --
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
(End of Clause)
Section J - List of Attachments
The following attachments were added:
SOW Rev 2 Final
The following attachments were deleted:
SOW Rev 2 & Specs FXSB 3332-1219
| IDCode: |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0004 |
| EffDate: 8/26/2019 |
| ReqNo: F1W3EA9182AW02 |
| ProjNo: |
| IssCode: FA5000 |
| AdmCode: |
| IssuedBy: FA5000 673 CONS LGC |
CP 907 552 5614
10480 SIJAN AVE STE 242
JBER, AK 99506-2501
United States Brian Nash II, Email: brian.nash.6@us.af.mil Telephone: 907-552-5731
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA500019QA082 |
| SolDate: 8/7/2019 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: 1 |
| Require: |
| Copies: |
| Descript: The purpose of this amendment is to extend the solicitation to 6 September 2019, 02:00 PM AKDT and attach a new revised SOW further removing portions of work that are no longer required. |
| ContNameTitle: |
| CoNameTitle: Matthew Knoll |
Email: matthew.knoll.2@us.af.mil Telephone: 907-552-5608
| ContDate: |
| CODate: |
File details come from the government source that posted it.